METRO CORRIDOR DOSSIER // HYDERABAD-METRO-GREEN-LINE-EXT-CHANDRAYANGUTTA

Hyderabad Metro Green Line Extension (MGBS - Chandrayangutta) Route Map, Stations & Status

Under Implementation / Construction Preparatory Works📏 7.5 km🚉 6 Stations Stations🏢 Telangana Government / Hyderabad Metro Rail Limited (HMRL)

The Hyderabad Metro Green Line Extension (MGBS to Chandrayangutta) is a 7.5 km elevated mass rapid transit corridor under implementation serving the historic Old City of Hyderabad across 6 stations: MGBS, Salarjung Museum, Charminar, Shalibanda, Falaknuma, and Chandrayangutta. Part of Phase II Corridor VI, the line extends Corridor II south from MGBS to Chandrayangutta, where it will interchange with the proposed Airport Corridor.

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Hyderabad Metro Green Line Extension (MGBS - Chandrayangutta) Economics

Hyderabad Metro Green Line Extension (MGBS - Chandrayangutta) Economics

Total InvestmentApproximately ₹2,000 crore, including road widening and utility shifting
Primary BackersPart of Phase-II 50:50 JV proposal between Government of India and Government of Telangana
Operator / ModelTelangana Government / Hyderabad Metro Rail Limited (HMRL)
Target Opening

Expected Completion Date

StatusUnder Implementation / Construction Preparatory Works
Target Opening Date
Station list

Hyderabad Metro Green Line Extension (MGBS - Chandrayangutta) Stations

#StationTypeInterchange / ConnectionOpened
01
MGBS
Operational InterchangeRed Line I & Green Line II Operational TerminalOperational
02
Salarjung Museum
Under ImplementationHeritage Museum Precinct NodePhase II
03
Charminar
Under ImplementationCharminar & Mecca Masjid GatewayPhase II
04
Shalibanda
Under ImplementationOld City Commercial HubPhase II
05
Falaknuma
Under ImplementationSCR MMTS Railway Station LinkPhase II
06
Chandrayangutta
Under Implementation TerminalProposed Airport Express Line IV InterchangePhase II
Geospatial Alignment

Hyderabad Metro Green Line Extension (MGBS - Chandrayangutta) Route Map

Loading GIS Map Environment...
Specs sheet

Hyderabad Metro Green Line Extension (MGBS - Chandrayangutta) Technical Specifications

ParameterValue
Corridor StatusUnder Implementation / Construction Preparatory Works
Line NumberPhase II Corridor VI (Green Line Old City Extension)
Total Length7.5 km
Stations Count6 Stations
Corridor Type100% Elevated Viaduct
OperatorTelangana Government / Hyderabad Metro Rail Limited (HMRL)
Opened / Est. OpeningTBD
Maximum Design Speed80 km/h
Track GaugeStandard Gauge (1435 mm)
Electrification System25kV 50Hz AC Overhead Catenary (OHE)
Primary DepotNo dedicated depot specified
Chronological Milestones

Hyderabad Metro Green Line Extension (MGBS - Chandrayangutta) Timeline

November 2024

7.5-km MGBS–Chandrayangutta Corridor VI included in the 76.4-km Phase-II proposal submitted to MoHUA

2026

General Consultant procurement initiated; land acquisition and construction-preparatory works underway

Proprietary analytics

Hyderabad Metro Green Line Extension (MGBS - Chandrayangutta) Economic & Connectivity Impact

Economic Significance

Brings mass rapid transit directly into the densely populated Old City of Hyderabad, drastically improving mobility for millions of residents.

Traffic Impact

Relieves extreme traffic congestion along narrow heritage road corridors connecting MGBS, Salarjung Museum, Charminar, Shalibanda, and Falaknuma.

Employment Centres Served

Connects traditional craft, textile, and wholesale commercial markets of Old City directly to Secunderabad and Cyberabad.

Intermodal Connectivity

Provides a key interchange link at Chandrayangutta connecting Old City commuters directly to the Shamshabad Airport Express Line IV.

Impact on Real Estate

Expected to drive commercial urban renewal and structured retail redevelopment along Old City transit nodes.

Geospatial Explorer

Hyderabad Metro Green Line Extension (MGBS - Chandrayangutta) Alignment Map & GIS Explorer

Elevated / UndergroundElevated: 7.5 km | Underground: 0 km
Viaduct Length7.5 km
Tunnel Length0 km
Primary DepotNo dedicated depot specified
Answers

Frequently Asked Questions

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

Project milestones
Government approvals
Construction progress
New project launches
Found incorrect data?
Never miss a project update.

Join the Infracapitalist Newsletter