JNPT Expressway Route Map & Alignment
View and download the latest JNPT Expressway route map showing the project alignment, major junctions, districts covered and connectivity corridors.
Advertisement // Sponsor
JNPT ExpresswayCost • Route • Timeline
| Parameter | Technical Details |
|---|---|
| Project Name | JNPT Expressway |
| Total Length | 28 km |
| Estimated Cost | ~₹3,000 Crore |
| Expected Completion Date | 2027 |
| Total Packages | 1 Package |
Latest Developments
Video Updates
Frequently Asked Questions
The JNPT Expressway route map and alignment details are available in the map section above.
This page tracks the latest construction status, contractor updates and package progress.
The JNPT Connectivity Project is another name for the road network upgrades supporting Jawaharlal Nehru Port transport routes.
The expressway improves port-related connectivity in Navi Mumbai and surrounding logistics corridors.
The target completion date is currently targetted for 2027.
जेएनपीटी एक्सप्रेसवे जवाहरलाल नेहरू पोर्ट ट्रस्ट के पास लॉजिस्टिक्स कनेक्टिविटी को बेहतर बनाने के लिए विकसित की जा रही एक सड़क परियोजना है।
The JNPT Expressway is the commonly used name for the approved 6-lane, access-controlled greenfield high-speed National Highway connecting JNPA Port at Pagote with Chowk in Maharashtra. The official government description identifies it as the JNPA Port (Pagote) to Chowk highway rather than formally naming it the JNPT Expressway.
The JNPT Expressway project is a 29.219 km greenfield highway planned to provide a direct high-capacity connection from JNPA Port to the national highway network at Chowk. The Union Cabinet approved the project on 19 March 2025 under the Build, Operate and Transfer (BOT-Toll) model with a total capital cost of ₹4,500.62 crore.
The JNPT Expressway route runs from JNPA Port at Pagote on NH-348 to Chowk on NH-48 in Maharashtra. The corridor is also planned to connect with the Mumbai–Pune Expressway and NH-66, providing a direct high-capacity route for port and commercial traffic.
The JNPT Expressway starts at JNPA Port on NH-348 near Pagote village and ends at Chowk on NH-48. Its planned connections with the Mumbai–Pune Expressway and Mumbai–Goa National Highway NH-66 give the corridor access to the wider regional highway network.
The approved JNPT Expressway is 29.219 km long. It is planned as a 6-lane, access-controlled greenfield high-speed National Highway.
The JNPT Expressway map shows the 29.219 km alignment between JNPA Port at Pagote and Chowk on NH-48. The official project map also shows its connectivity with the Mumbai–Pune Expressway and NH-66 and the two planned tunnels through the Sahyadri range.
The approved alignment begins at JNPA Port on NH-348 at Pagote village and terminates at the Mumbai–Pune Highway on NH-48 at Chowk. The corridor includes two tunnels through the Sahyadri range so that commercial vehicles can avoid the existing ghat terrain. A more detailed village-by-village alignment should not be stated unless supported by an official detailed alignment document.
The approved capital cost of the JNPT Expressway is ₹4,500.62 crore. The Union Cabinet approved this amount for the 29.219 km JNPA Port–Chowk project on 19 March 2025, with development planned under the BOT-Toll model.
The JNPT Expressway is designed to provide a more direct connection between JNPA Port and NH-48, the Mumbai–Pune Expressway and NH-66. The project is intended to improve logistics efficiency and facilitate safer and more efficient freight movement, particularly for container traffic from JNPA.
The project was approved to address highway congestion affecting traffic leaving JNPA Port toward NH-48 and the Mumbai–Pune Expressway. The government cited congestion around Palaspe Phata, D-Point, Kalamboli Junction and Panvel as a reason for developing a more direct port connection. The corridor is also intended to strengthen connectivity with Navi Mumbai International Airport.
The JNPT Expressway is planned as a 29.219 km, 6-lane, access-controlled greenfield highway. Two tunnels through the Sahyadri range are included in the project to avoid a ghat section and facilitate the movement of large commercial and container vehicles.
The JNPT Expressway is an approved project in the implementation process. The Union Cabinet approved the 29.219 km JNPA Port–Chowk highway in March 2025. Current publicly available information does not establish that the entire corridor has entered active civil construction, so it should not be described as an operational or completed expressway.
The project has received approval for construction, but a verified public announcement confirming the commencement of full-scale civil construction of the 29.219 km corridor has not been established. Therefore, the project is best described as approved and progressing through implementation rather than being presented as an already operational or substantially completed highway.
The key confirmed development remains the Union Cabinet approval dated 19 March 2025 for the 29.219 km JNPA Port–Chowk highway. The approved project has a ₹4,500.62 crore capital cost, 6-lane access-controlled configuration and two Sahyadri tunnels. Recent infrastructure coverage continues to identify the corridor as an upcoming freight-connectivity project rather than an operational expressway.
The JNPA Port–Chowk highway is a National Highway project under the Ministry of Road Transport and Highways framework and was approved for development on a Build, Operate and Transfer (BOT-Toll) basis. The publicly confirmed project approval does not by itself establish a specific construction contractor, so an individual contractor should not be named without a verified contract or award announcement.
Related Infrastructure Projects
Virar Alibaug Multimodal Corridor
A planned 8-lane expressway combining rapid transit, highways, and utility lines, connecting Virar to Alibaug to ease congestion in MMR.
View Project →Orange Gate to Marine Drive Twin Tunnel
A 9.3 km project linking Eastern Freeway's Orange Gate node to Marine Drive on the western shoreline.
View Project →CIDCO Coastal Road
A 9.6 km coastal expressway section under active construction by CIDCO to improve port connectivity.