Mumbai–Ahmedabad High-Speed Rail (MAHSR): Route Map, Stations, Status & Latest Update

Last Updated: July 2026

The Mumbai–Ahmedabad High-Speed Rail Corridor (MAHSR) is India’s flagship high-speed rail development. Popularly referred to as the Mumbai Ahmedabad Bullet Train, this massive 508.18 km corridor is designed for an operating speed of 320 km/h with a maximum design speed of 350 km/h. Current plans envisage initial services using indigenous B28 (Vande Bullet) trainsets, followed by the introduction of E10 Series Shinkansen trainsets on the 1,435 mm Standard Gauge track. The fully grade-separated corridor comprises elevated viaducts, underground sections, undersea tunnelling, and surface infrastructure. Cutting across Maharashtra, the Union Territory of Dadra & Nagar Haveli, and Gujarat, the line will slash transit times between Mumbai and Ahmedabad to 2 hours 7 minutes for rapid train services and 2 hours 58 minutes for all-stop services.

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Total Length508 km
Estimated Cost₹1,08,000 Crore
Implementing AgencyNHSRCL
Current StatusUnder Dev
Completion Target2028
Route Map

Mumbai–Ahmedabad High-Speed Rail CorridorRoute Map & Alignment

View and download the latest Mumbai–Ahmedabad High-Speed Rail Corridor route map showing the project alignment, major junctions, districts covered and connectivity corridors.

Map Currently UnavailableRoute map will load when GIS data is available

Advertisement // Sponsor

Loading sponsor...
Project Parameters & Technical Details

Mumbai–Ahmedabad High-Speed Rail CorridorCost • Route • Timeline

ParameterTechnical Details
Project NameMumbai–Ahmedabad High-Speed Rail Corridor
Total Length508 km
Estimated Cost₹1,08,000 Crore
Implementing AuthorityNational High Speed Rail Corporation Limited (NHSRCL)
Districts CoveredMumbai, Thane, Palghar (Maharashtra); Dadra & Nagar Haveli (UT); Valsad, Navsari, Surat, Bharuch, Vadodara, Anand, Kheda, Ahmedabad (Gujarat)
Number of Villages AffectedLand acquisition spans more than 100 villages across Maharashtra and Gujarat
Current PhaseUnder Construction
Start DateGroundbreaking: September 2017 | Construction: February 2021
Expected Completion Date2028
Total Packages11 Packages
Track Gauge1,435 mm (Standard Gauge)
Max Design Speed350 km/h
Operating Speed320 km/h
Electrification System25 kV 50 Hz AC overhead
Signalling & ControlDigital Automatic Train Control (DS-ATC / Shinkansen ATC system)
Number of HSR Stations12 Stations
Maintenance Depots3 Depots (Sabarmati, Surat, Thane)
Rolling StockB28 (Vande Bullet) and E10 Series Shinkansen
Alignment Composition460.3 km Viaducts (90.6%), 25.87 km Tunnels (including 7 km undersea), 12.9 km Embankments (2.5%), 9.22 km Bridges (1.8%)
Project ImplementationNational High Speed Rail Corporation Limited (NHSRCL)

MAHSR Technical Specifications & Features

The project incorporates state-of-the-art high-speed rail design elements:

  • Viaduct Alignment: The alignment consists of 460.3 km of elevated viaducts (90.6% of the route), 25.87 km of tunnels (5.1%), 12.9 km of embankments (2.5%), and 9.22 km of bridges (1.8%).
  • Bridges & River Crossings: The route includes multiple specialized bridges spanning key rivers across Gujarat and Maharashtra.
  • Rolling Stock: Current plans envisage initial services using indigenous B28 (Vande Bullet) trainsets, followed by the introduction of E10 Series Shinkansen trainsets. Both Business Class and Standard Class accommodations will be offered.
  • Power & Systems: Electrified via a 25 kV 50 Hz AC overhead traction system and controlled by Digital Automatic Train Control (DS-ATC / Shinkansen ATC system).
  • Operation Control: Supported by the central Sabarmati Operation Control Centre (OCC) to monitor all train movements and systems.
  • Depots: Supported by three rolling stock maintenance depots located at Sabarmati, Surat, and Thane.
  • Capacity & Ridership: Planned for 70 train services per day, with an initial projected daily ridership of 36,000 passengers (based on initial DPR estimates).
  • Slab Track & Safety: Deploys advanced slab track technology (J-Slab) and automated seismometer-linked earthquake early warning systems.

Mumbai Ahmedabad Bullet Train Stations

The corridor features 12 designated high-speed stations strategically placed to serve key cities and business centers. The stations include Mumbai (BKC), Thane, Virar, and Boisar in Maharashtra; and Vapi, Bilimora, Surat, Bharuch, Vadodara, Anand, Ahmedabad, and Sabarmati in Gujarat.

The underground Bandra Kurla Complex (BKC) station box will be an underground station (NHSRCL designs designate it as India's deepest HSR station box), featuring a multi-level structure with six platforms built entirely below ground level. Sabarmati will serve as a major multi-modal hub, integrating the bullet train with Indian Railways, local metros, and bus transport systems.

India's First Undersea Rail Tunnel

A major engineering feat of the project is the construction of a 21 km underground tunnel in Maharashtra, stretching along the BKC–Shilphata route. This 21 km underground section includes a 7 km segment beneath Thane Creek, forming India's first undersea rail tunnel. Package C2, which covers this tunnel section, is being built by Afcons Infrastructure using specialized Tunnel Boring Machines (TBMs) and New Austrian Tunneling Method (NATM) excavation.

Project Funding and JICA Loan

The total estimated cost of the MAHSR project is ₹1.8 lakh crore. The project is heavily supported by the Government of Japan through the Japan International Cooperation Agency (JICA), which is funding 81% of the project via a soft loan at a highly concessionary 0.1% interest rate with a 50-year repayment period (including a 15-year grace period). The National High Speed Rail Corporation Limited (NHSRCL) is the implementing body managing all construction packages.

Construction Progress and Target Timeline

Construction is moving at a rapid pace across both states. Gujarat has completed 100% land acquisition and large-scale viaduct, bridge and station construction is underway, with pier casting and viaduct erection visible across hundreds of kilometers. While Maharashtra faced land acquisition delays in early stages, 100% of the land has now been handed over, and work on BKC station (Package C1) and the undersea tunnel (Package C2) is under active execution. NHSRCL targets trial runs and a phased opening on the initial Gujarat section (Surat–Bilimora on 15 August 2027, followed by Vapi–Surat, Vapi–Ahmedabad, and the full corridor target by 2029).

GIS Corridor Analysis

Impact Zone: Affected Settlements

Places, towns, and villages located within the 1.5 km and 500m buffer corridors, as well as road crossing nodes along the project's alignment, identified via OpenStreetMap spatial analysis.

Running GIS Spatial Analysis...

Timeline

Latest Developments

Verified project updates from news sources and official announcements
Video Coverage

Video Updates

Latest drone footage, progress reports, and ground coverage
General Inquiries

Frequently Asked Questions

As of mid-2026, civil construction on the Mumbai–Ahmedabad High Speed Rail (MAHSR) corridor is progressing well across both states. In Gujarat, all 7 civil packages (C1–C7) are under active construction. Land acquisition across both Gujarat and Maharashtra is now 100% complete. The 7 km Thane Creek undersea tunnel boring has commenced in Maharashtra under Package C2 by Afcons Infrastructure. NHSRCL aims to begin trial operations on the initial Gujarat section after completion of civil works and systems installation.

Related Infrastructure Projects

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Maharashtra Dashboard →MH
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Never miss a project update.

Join the Infracapitalist Newsletter