Ahmedabad Metro Route Map, Lines & Stations (2026) (અમદાવાદ મેટ્રો)
Last Updated: 2026
The official Ahmedabad Metro Routeconnects Ahmedabad, Gandhinagar, and GIFT City in Gujarat. Implemented by Gujarat Metro Rail Corporation (GMRC) Limited, the 68.23 km operational grid comprises 54 stations across 4 operating lines (Blue Line, Red Line, Yellow Line & Violet Line), with active Phase 2A tendering and Phase 3 corridor DPRs underway for planned expansion routes.
Ahmedabad Metro Routes, Lines & Proposed Extensions
Gujarat Metro Rail Corporation (GMRC) Limited operates 68.23 km of rapid transit across 4 operating lines, with active Phase 2A tendering and Phase 3 corridor DPRs underway:
Blue Line (Line 1: Thaltej Gam – Vastral Gam)
21.16 km operational East-West corridor featuring 18 stations (14 elevated, 4 underground) with a 6.5 km underground twin tunnel section beneath historic Old Ahmedabad.
Red Line (Line 2: APMC – Motera Stadium)
18.87 km operational North-South elevated corridor featuring 15 stations along Ashram Road, connecting Vasna APMC to Narendra Modi Stadium at Motera.
Yellow Line (Motera Stadium – Mahatma Mandir)
22.84 km / 20 Phase-II stations North-South corridor, connecting Motera Stadium to Sector 1 and Mahatma Mandir in Gandhinagar.
Violet Line (GNLU – GIFT City)
5.42 km operational Phase 2 elevated branch serving 2 stations (PDPU and GIFT City) providing direct transit into Gujarat International Finance Tec-City.
Phase 2A Airport Line (Koteshwar Road – SVPIA Airport)
6.032 km sanctioned Phase 2A corridor across 5 stations (5.11 km elevated + 0.92 km underground) connecting Koteshwar Road to SVPIA Airport.
Violet Line Extension (GIFT City – Shahpur Circle)
3.33 km / 3 stations proposed elevated extension branching from GIFT City towards Shahpur Circle.
Phase 3 Corridors (Metro Ring & Hybrid RRTS)
Proposed Phase 3C Ring Corridor (36.169 km geotechnical study) and Phase 3A hybrid Metro-cum-RRTS corridors under DPR formulation.
Ahmedabad Metro Route Map & Network Map
Ahmedabad Metro Lines, Routes & Stations List
The official Ahmedabad Metro station list covers 54 stations across Phase 1 and Phase 2. The Ahmedabad Gandhinagar Metro route connects Motera Stadium to Sector 1 and Mahatma Mandir via the Yellow Line (23.84 km / 21 stations), while the Violet Line branch serves GNLU, PDPU, and GIFT City across 3 stations.
Ahmedabad Metro Corridors
7 Listed Corridors| Line | Status | Length | Stations | Details |
|---|---|---|---|---|
Blue Line (Line 1: Thaltej Gam - Vastral Gam) Thaltej Gam ↔ Vastral Gam | Operational | 21.16 km | 18 Stations | View Corridor Details→ |
Red Line (Line 2: APMC - Motera Stadium) APMC (Vasna) ↔ Motera Stadium | Operational | 18.87 km | 15 Stations | View Corridor Details→ |
Yellow Line (Motera Stadium - Mahatma Mandir) Motera Stadium ↔ Mahatma Mandir (Gandhinagar) | Operational | 22.84 km | 20 Stations | View Corridor Details→ |
Violet Line (Phase 2: GNLU - GIFT City) GNLU ↔ GIFT City | Operational | 5.42 km | 2 Stations | View Corridor Details→ |
Violet Line Extension (GIFT City - Shahpur Circle) GIFT City ↔ Shahpur Circle | Under Construction | 3.33 km | 3 Stations | View Corridor Details→ |
Airport Line (Phase 2A: Koteshwar Road - SVPI Airport) Koteshwar Road ↔ Ahmedabad Airport | Approved / Under Development | 6.032 km | 5 Stations | View Corridor Details→ |
Blue Line Extension (Phase 3: Thaltej Gam - Godhavi) Thaltej Gam ↔ Godhavi | Proposed | 10.82 km | 9 Stations | View Corridor Details→ |
Ahmedabad Metro Route, Stations & Network Statistics
Ahmedabad Metro Timeline
GMRC Incorporation
Gujarat Metro Rail Corporation (GMRC) Limited incorporated as Special Purpose Vehicle (SPV) for Metro implementation.
Phase 1 Cabinet Sanction
Union Cabinet approved Ahmedabad Metro Phase 1 (40.03 km) covering Blue & Red lines at an estimated cost of ₹10,773 crore.
Phase 2 Cabinet Approval
Union Cabinet approved Phase 2 (28.20 km) connecting Motera Stadium to Gandhinagar Mahatma Mandir & GIFT City at ₹5,384 crore.
Phase 1 Priority Opening
PM Narendra Modi inaugurated 6.5 km Phase 1 Priority Section on Blue Line from Vastral Gam to Apparel Park.
Phase 1 Opening
PM Narendra Modi inaugurated Phase 1 (40.03 km) Blue & Red lines.
Phase 2 Initial Opening
PM Narendra Modi inaugurated Phase 2 initial section connecting Motera Stadium to Sector 1 and GNLU to GIFT City branch.
Mahatma Mandir Section Opened
Phase 2 extension section to Mahatma Mandir in Gandhinagar inaugurated, bringing operational Phase 2 network to 28.20 km.
Phase 2A Airport Line & Phase 3 DPRs
GMRC sanctioned and tendered the 6.032 km Phase 2A Airport Line (Koteshwar Road - SVPIA Airport) and 36.169 km Phase 3C Metro Ring Corridor.
Connectivity
Bullet Train (HSR) Integration
Under-construction Sabarmati Railway Metro Station serves as the planned multi-modal interchange point with the Mumbai–Ahmedabad High-Speed Rail (HSR Bullet Train) and Sabarmati Junction.
Indian Railways Integration
Kalupur Underground Metro Station is integrated with Indian Railways at Ahmedabad Junction via an underground pedestrian subway tunnel.
Phase 2A Airport Link
6.032 km Phase 2A Airport Line (Koteshwar Road – SVPIA Airport) sanctioned and tendered by GMRC in 2026 to provide direct airport rapid transit.
Expressways & Ring Roads
Aligned along SP Ring Road (Sardar Patel Ring Road), 132 Feet Ring Road, Ashram Road, SG Highway, and Ahmedabad-Vadodara Expressway.
Why Ahmedabad Metro Matters
Twin City Integration
Bridges Gujarat's economic capital (Ahmedabad) and political capital (Gandhinagar) with fast, pollution-free, frequency-controlled transit.
Connecting Financial Hubs
Provides direct rapid transit into GIFT City (Gujarat International Finance Tec-City), tech parks, and corporate hubs along SG Highway.
Heritage & Sports Corridor
Connects World Heritage Old City markets, Kankaria Lake, Sabarmati Ashram, and the world's largest cricket stadium at Motera.
Latest Ahmedabad Metro News & Updates
Frequently Asked Questions
Enjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.