Home/Metro/Ahmedabad Metro Network
METRO DOSSIER INDEX // AHMEDABAD-METRO-NETWORK

Ahmedabad Metro Route Map, Lines & Stations (2026) (અમદાવાદ મેટ્રો)

Last Updated: 2026

The official Ahmedabad Metro Routeconnects Ahmedabad, Gandhinagar, and GIFT City in Gujarat. Implemented by Gujarat Metro Rail Corporation (GMRC) Limited, the 68.23 km operational grid comprises 54 stations across 4 operating lines (Blue Line, Red Line, Yellow Line & Violet Line), with active Phase 2A tendering and Phase 3 corridor DPRs underway for planned expansion routes.

System Quick Facts
Opened2019 (Priority) / 2022 (Phase 1) / 2024–2026 (Phase 2)
OperatorGujarat Metro Rail Corporation (GMRC) Limited
Network TypeRapid Transit Metro — Elevated & Underground
GaugeStandard Gauge (1435 mm)
Electrification750V DC Third Rail
Maximum Speed80 km/h
Operational Network68.23 km (54 Stations)
Depots2 Operational (Gyaspur, Apparel Park) + Indroda Park Depot (UC)
Note on Network ScopeMethodology: GMRC official documentation confirms 68.23 km of operational rapid transit (Phase 1: 40.03 km + Phase 2: 28.20 km) across 54 stations. Proposed Phase 2A and Phase 3 corridors encompass upcoming expansion routes.
Operational Network68.23 km
Phase 1 Operational (Lines 1 & 2)40.03 km
Phase 2 Operational (Yellow & Violet)28.20 km
Total Network Stations54 Stations
Phase 2A Airport Line (Sanctioned)6.032 km
Sanctioned Phase Costs₹10.7k Cr + ₹5.3k Cr
Operational CorridorsBlue Line (21.16 km), Red Line (18.87 km), Yellow Line (22.84 km / 20 Phase-II stations) & Violet Line (5.42 km / 2 stations)
4 Lines (68.23 km)
Phase 2 StatusMotera to Sector 1 & GIFT City opened Sept 2024; Mahatma Mandir section opened January 2026
28.25 km Stage-Opened
Upcoming ExtensionsPhase 2A SVPIA Airport Line (6.032 km), GIFT City–Shahpur extension (3.33 km) & Phase 3C Metro Ring Corridor (36.169 km)
Phase 2A & Phase 3 Corridors
Network Expansion

Ahmedabad Metro Routes, Lines & Proposed Extensions

Gujarat Metro Rail Corporation (GMRC) Limited operates 68.23 km of rapid transit across 4 operating lines, with active Phase 2A tendering and Phase 3 corridor DPRs underway:

Blue Line (Line 1: Thaltej Gam – Vastral Gam)

21.16 km operational East-West corridor featuring 18 stations (14 elevated, 4 underground) with a 6.5 km underground twin tunnel section beneath historic Old Ahmedabad.

Red Line (Line 2: APMC – Motera Stadium)

18.87 km operational North-South elevated corridor featuring 15 stations along Ashram Road, connecting Vasna APMC to Narendra Modi Stadium at Motera.

Yellow Line (Motera Stadium – Mahatma Mandir)

22.84 km / 20 Phase-II stations North-South corridor, connecting Motera Stadium to Sector 1 and Mahatma Mandir in Gandhinagar.

Violet Line (GNLU – GIFT City)

5.42 km operational Phase 2 elevated branch serving 2 stations (PDPU and GIFT City) providing direct transit into Gujarat International Finance Tec-City.

Phase 2A Airport Line (Koteshwar Road – SVPIA Airport)

6.032 km sanctioned Phase 2A corridor across 5 stations (5.11 km elevated + 0.92 km underground) connecting Koteshwar Road to SVPIA Airport.

Violet Line Extension (GIFT City – Shahpur Circle)

3.33 km / 3 stations proposed elevated extension branching from GIFT City towards Shahpur Circle.

Phase 3 Corridors (Metro Ring & Hybrid RRTS)

Proposed Phase 3C Ring Corridor (36.169 km geotechnical study) and Phase 3A hybrid Metro-cum-RRTS corridors under DPR formulation.

Geospatial Alignment

Ahmedabad Metro Route Map & Network Map

Loading GIS Map Environment...
Network Corridors & Station Directory

Ahmedabad Metro Lines, Routes & Stations List

The official Ahmedabad Metro station list covers 54 stations across Phase 1 and Phase 2. The Ahmedabad Gandhinagar Metro route connects Motera Stadium to Sector 1 and Mahatma Mandir via the Yellow Line (23.84 km / 21 stations), while the Violet Line branch serves GNLU, PDPU, and GIFT City across 3 stations.

Ahmedabad Metro Corridors

7 Listed Corridors
Technical & Operational Overview

Ahmedabad Metro Route, Stations & Network Statistics

GMRC Operational Network68.23 km
Operational Corridors4 Lines
Total Network Stations54 Stations
Primary Interchange Hubs2 Primary (Old High Court, Motera)
Maintenance Depots2 Operational (Gyaspur, Apparel Park) + Indroda Park (UC)
Sanctioned Phase CostsPhase 1: ₹10,773 Cr | Phase 2: ₹5,384 Cr
Ahmedabad Metro Expansion & New Routes

Ahmedabad Metro Timeline

Feb 2010

GMRC Incorporation

Gujarat Metro Rail Corporation (GMRC) Limited incorporated as Special Purpose Vehicle (SPV) for Metro implementation.

Oct 2014

Phase 1 Cabinet Sanction

Union Cabinet approved Ahmedabad Metro Phase 1 (40.03 km) covering Blue & Red lines at an estimated cost of ₹10,773 crore.

Feb 2019

Phase 2 Cabinet Approval

Union Cabinet approved Phase 2 (28.20 km) connecting Motera Stadium to Gandhinagar Mahatma Mandir & GIFT City at ₹5,384 crore.

Mar 2019

Phase 1 Priority Opening

PM Narendra Modi inaugurated 6.5 km Phase 1 Priority Section on Blue Line from Vastral Gam to Apparel Park.

Sept 2022

Phase 1 Opening

PM Narendra Modi inaugurated Phase 1 (40.03 km) Blue & Red lines.

Sept 2024

Phase 2 Initial Opening

PM Narendra Modi inaugurated Phase 2 initial section connecting Motera Stadium to Sector 1 and GNLU to GIFT City branch.

Jan 2026

Mahatma Mandir Section Opened

Phase 2 extension section to Mahatma Mandir in Gandhinagar inaugurated, bringing operational Phase 2 network to 28.20 km.

July 2026

Phase 2A Airport Line & Phase 3 DPRs

GMRC sanctioned and tendered the 6.032 km Phase 2A Airport Line (Koteshwar Road - SVPIA Airport) and 36.169 km Phase 3C Metro Ring Corridor.

Intermodal Integration

Connectivity

Bullet Train (HSR) Integration

Under-construction Sabarmati Railway Metro Station serves as the planned multi-modal interchange point with the Mumbai–Ahmedabad High-Speed Rail (HSR Bullet Train) and Sabarmati Junction.

Indian Railways Integration

Kalupur Underground Metro Station is integrated with Indian Railways at Ahmedabad Junction via an underground pedestrian subway tunnel.

Phase 2A Airport Link

6.032 km Phase 2A Airport Line (Koteshwar Road – SVPIA Airport) sanctioned and tendered by GMRC in 2026 to provide direct airport rapid transit.

Expressways & Ring Roads

Aligned along SP Ring Road (Sardar Patel Ring Road), 132 Feet Ring Road, Ashram Road, SG Highway, and Ahmedabad-Vadodara Expressway.

Strategic Impact

Why Ahmedabad Metro Matters

Twin City Integration

Bridges Gujarat's economic capital (Ahmedabad) and political capital (Gandhinagar) with fast, pollution-free, frequency-controlled transit.

Connecting Financial Hubs

Provides direct rapid transit into GIFT City (Gujarat International Finance Tec-City), tech parks, and corporate hubs along SG Highway.

Heritage & Sports Corridor

Connects World Heritage Old City markets, Kankaria Lake, Sabarmati Ashram, and the world's largest cricket stadium at Motera.

Real-time Briefings & Construction Update

Latest Ahmedabad Metro News & Updates

Stay updated with the Ahmedabad Metro latest update and Ahmedabad Metro construction update across all active tendering and expansion routes.
Answers

Frequently Asked Questions

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Gujarat Dashboard →GJ
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
RELATED
Never miss a project update.

Join the Infracapitalist Newsletter