Indore Metro (MPMRCL) is an advanced rapid-transit network under active development across the Indore metropolitan region. Phase 1 features the 33.53 km Yellow Line (Line 3) circular ring corridor connecting Devi Ahilya Bai Holkar International Airport, the Super Corridor IT SEZ, MR 10, Vijay Nagar, Palasia, Indore Junction Railway Station, and the historical Rajwada core across 29 stations in Phase 1. As of 4 September 2026, 5 stations on the 5.9 km Super Priority Corridor are commercially operational, with extensions toward Radisson Square scheduled for opening; target completion for the full ring corridor is December 2028.

System Quick Facts
Commissioning5.9 km Super Priority Corridor opened 31 May 2025
OperatorMPMRCL (GoI & GoMP 50:50 JV)
Network TypeRapid Transit (Elevated & Underground Ring)
GaugeStandard Gauge (1435 mm)
Electrification750V DC Third Rail
Technical SpeedMaximum Design Speed: 90 km/h | Operating Speed: 80 km/h
Rolling StockAlstom 3-car Metropolis (Driverless Capable)
Phase 1 Network33.53 km (29 Stations)
Super Priority Reach5.9 km (5 Stations, As of 4 Sept 2026)
Target CompletionDecember 2028 (MoSPI)
Primary DepotGandhi Nagar Maintenance Depot & OCC
Master Plan Grid124 km network (Lines 1A, 1B, 2, 3 & 4)
Note on Network ScopeMethodology: Phase 1 comprises the 33.53 km Yellow Line circular ring corridor (29 stations in Phase 1 across elevated viaduct and underground twin-tunnel sections, approved at ₹7,500.80 Cr). As of 4 September 2026, 5 stations (5.9 km) are commercially operational; the extension toward Radisson Square is scheduled for passenger launch. Target completion for the entire Phase 1 corridor is December 2028 (per MoSPI monitoring). The MPMRCL Proposed Master Plan outlines a 124 kmnetwork (Lines 1A, 1B, 2, 3 & 4), complemented by a separate regional transit link to Ujjain.
Phase 1 Ring Length33.53 km
Super Priority Corridor5.9 km (Operational)
Total Phase 1 Stations29 Stations
Approved Project Cost₹7,500.80 Cr
Electrification750V DC Third Rail
Primary Interchange HubIndore Junction & Rajwada (UG)
Super Priority CorridorDevi Ahilya Bai Holkar Terminal to Veerangana Jhalkari Bai (As of 4 September 2026)
5.9 km (5 Stations)
Under ConstructionBalance Phase 1 Yellow Line viaduct, stations & underground reaches
27.63 km (24 Stations)
Target CompletionTarget completion: December 2028 (subject to revision per MoSPI)
December 2028
Master Plan NetworkProposed Master Plan network (Lines 1A, 1B, 2, 3 & 4); Ujjain regional link planned separately
124 km (5 Lines)
Network Expansion

Indore Metro Proposed Master Plan Network

The Madhya Pradesh Metro Rail Corporation Limited (MPMRCL) has formulated a 124 km proposed master plan network for the Indore metropolitan region across Lines 1A, 1B, 2, 3 and 4. While Phase 1 actively delivers the 33.53 km Yellow Line (Line 3) ring corridor, future proposed radial lines will expand connectivity across the wider urban and industrial growth zones, complemented by separate regional links:

Line 3 (Yellow Line Ring Corridor - 33.53 km)

The primary circular ring corridor connecting Super Corridor, Bhawarsala, MR 10, Vijay Nagar, Radisson, Khajrana, Bengali Square, Palasia, High Court, Railway Station, Rajwada, and the Airport across 29 stations in Phase 1.

Line 1A & 1B (Proposed Red Line: Sri Aurobindo to Collectorate / Regional Park)

A planned ~15–17 km north-south arterial corridor proposed to link major healthcare institutions like Sri Aurobindo Hospital to the Central Collectorate and Regional Park.

Line 2 (Proposed Green Line: Sukhlia to Dewas Naka)

A planned ~10 km east-west industrial corridor proposed to connect the Sukhlia residential zones with the Dewas Naka transport hub.

Line 4 (Proposed Blue Line: MR 9 to AIIMS Indore / Bypass)

A planned radial corridor proposed to connect MR 9, Bypass, and the AIIMS Indore healthcare and institutional campus.

Indore–Ujjain Proposed Regional Transit / Vande Metro Link

A separate planned semi-high-speed regional transit corridor connecting Indore Metro at Super Corridor / Bhawarsala to the pilgrimage city of Ujjain ahead of the 2028 Simhastha Kumbh Mela.

Geospatial alignment

Indore Metro Rail Network Route Map & Network Map

Loading GIS Map Environment...
Network Corridors

Indore Metro Lines & Stations

Indore Metro Corridors & Master Plan Network

4 Core Corridors
Technical & Operational Overview

Indore Metro Network Statistics

Phase 1 Ring Length33.53 km
Super Priority Corridor5.9 km (Operational)
Balance Under Construction27.63 km (24 Stations)
Target CompletionDecember 2028 (MoSPI)
Electrification750V DC Third Rail
Proposed Master Plan124 km (Lines 1A, 1B, 2, 3, 4)
Development Roadmap

Indore Metro Rail Network Timeline

October 2018

Phase 1 Cabinet Approval

Union Cabinet approved Phase 1 of Indore Metro Rail Project (₹7,500.80 Cr) covering 31.55 km, 30 stations (originally approved Phase 1; later revised to 33.53 km / 29 stations).

2019

Civil Construction Commences

Civil construction launched for the Super Corridor elevated viaduct and Gandhi Nagar depot.

October 2023

Trial Run Flagged Off

First trial run conducted on the 5.9 km Super Priority Corridor between Gandhi Nagar and Super Corridor 3.

31 May 2025

Super Priority Corridor Opens

Commercial revenue passenger operations commenced on the 5.9 km Super Priority Corridor (5 stations from Gandhi Nagar to Super Corridor 3).

September 2026

Radisson Extension Launch Planned

Commercial launch of the extended corridor planned, subject to final approvals.

December 2028

Target Completion

Target completion date for the complete 33.53 km 29-station Yellow Line circular ring corridor (per MoSPI monitoring report, subject to revision).

Intermodal Integration

Connectivity

Devi Ahilya Bai Holkar Airport

Planned underground metro station on the Yellow Line (under construction/future connectivity).

Indore Junction Railway Station

Planned multi-modal underground interchange with Indian Railways (under construction/future connectivity).

Expressways & Major Arterials

Direct alignment along Super Corridor Road, MR-10 Road, Eastern Ring Road, AB Road (NH-52), and the Indore–Ujjain 4-lane Highway.

Industrial & IT Hubs

Direct rapid transit spine serving the Super Corridor IT SEZ (TCS, Infosys campuses), Sanwer Road Industrial Area and planned connectivity to the Pithampur industrial belt.

Strategic Impact

Why Indore Metro Matters

Super Corridor IT & Economic Growth

Provides high-speed, reliable transit connecting corporate tech campuses, educational institutes, and modern residential townships along the 8-lane Super Corridor.

Traffic Relief for Major Intersections

Diverts heavy vehicular traffic from chronic bottleneck intersections including Vijay Nagar Square, Radisson Square, Khajrana Chauraha, Bengali Square, and Palasia.

Heritage Preservation via Underground Alignment

The planned underground twin-tunnel section is designed to preserve historic landmarks including Rajwada Palace, Bada Ganpati, and Chota Ganpati.

Real-time Briefings

Latest Indore Metro News & Updates

Answers

Frequently Asked Questions

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Maharashtra Dashboard →MH
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
RELATED
Never miss a project update.

Join the Infracapitalist Newsletter