Jaipur Metro (operated by Jaipur Metro Rail Corporation) is Rajasthan's flagship urban rapid transit system. The network features the operational 11.64 km Pink Line (Mansarovar to Badi Chaupar) with 11 stations traversing the UNESCO World Heritage Walled City, active Phase 1C & 1D extensions under construction, and the approved 41.0 km Phase 2 North–South corridor connecting Prahladpura to Todi Mod with construction packages underway (Target completion: September 2031 at ₹13,037.66 Cr).

System Quick Facts
Commissioning3 June 2015 (Phase 1A) / 23 September 2020 (Phase 1B)
OperatorJaipur Metro Rail Corporation (JMRC) / RMRCL
Network TypeRapid Transit (Elevated Viaducts & Underground Twin Tunnels)
GaugeStandard Gauge (1435 mm)
Electrification25 kV AC 50 Hz Overhead Catenary System (OHE)
Technical SpeedMaximum Design Speed: 90 km/h | Operating Speed: 80 km/h
Rolling StockBEML 4-car Stainless Steel EMUs (Capacity ~1,314 Passengers)
Operational Network11.64 km (11 Stations: 8 Elevated, 3 Underground)
Under Construction45.20 km (Phase 1C: 2.85 km, Phase 1D: 1.35 km, Phase 2: 41.0 km)
Phase 2 ApprovalApproved by Union Cabinet (April 2026) / Active Tenders & Packages
Phase 2 TargetTarget completion: September 2031
Primary DepotsMansarovar Maintenance Depot & OCC (Active)
Note on Network ScopeOfficial Status: The currently commissioned network comprises 11.64 km across Phase 1A and Phase 1B (11 stations). Ongoing civil works for Phase 1C (2.85 km) and Phase 1D (1.35 km) expand Phase 1 to 15.84 km. With the sanctioned Phase 2 North–South Corridor (41.0 km, 36 stations), combined project corridors total 56.84 km.
Operational Network11.64 km (11 Stations)
Pink Line Extensions4.20 km (3 Stations)
Phase 2 (North-South)41.0 km (36 Stations)
Combined Corridors56.84 km (50 Stations)
Phase 2 Sanctioned Cost₹13,037.66 Cr
Phase 2 TargetSeptember 2031
Operational NetworkPink Line (Phase 1A: Mansarovar–Chandpole; Phase 1B: Chandpole–Badi Chaupar)
11.64 km (11 Stations)
Extensions Under ConstructionPhase 1C (2.85 km to Transport Nagar) + Phase 1D (1.35 km to Ajmer Rd)
4.20 km (3 Stations)
Line 2 (Orange Line)Phase 2 North–South Corridor (Prahladpura to Todi Mod via Airport UG)
41.0 km (36 Stations)
Combined CorridorsTotal Master Plan Corridors across Pink Line & Orange Line
56.84 km (50 Stations)
Network Expansion

Jaipur Metro Route, Lines & Phase 2 Expansion

The Jaipur Metro Rail Corporation (JMRC) and Rajasthan Metro Rail Corporation Limited (RMRCL) are expanding the urban rail network from its operational 11.64 km Pink Line into a comprehensive citywide rapid transit network:

Line 1 — Pink Line (Phase 1A + Phase 1B: 11.64 km Operational)

Fully operational east-west arterial spine connecting Mansarovar residential hub, Civil Lines, Jaipur Junction, Sindhi Camp bus terminal, and the historic UNESCO World Heritage Walled City landmarks of Chandpole, Chhoti Chaupar, and Badi Chaupar across 11 stations (8 elevated, 3 underground).

Line 1 Extensions — Phase 1C (2.85 km) & Phase 1D (1.35 km)

Two active under-construction extensions: Phase 1C extends eastward from Badi Chaupar to Transport Nagar on Agra Road (NH-21) via Ramganj Chaupar (0.97 km UG + 1.88 km elevated, 2 stations); Phase 1D extends south-west from Mansarovar to 200 Feet Bypass at Ajmer Road Chauraha (1.35 km elevated, 1 station).

Line 2 — Phase 2 (North–South Corridor), commonly referred to as Orange Line (41.0 km)

Approved with construction packages underway following Union Cabinet sanction in April 2026 at ₹13,037.66 Cr. Spans 41.0 km across 36 stations (34 elevated, 2 underground) from Prahladpura in the south to Todi Mod in the north, including Sanganer PS and Jaipur Airport underground stations, and planned interchange with Phase 1 at Khasa Kothi. Target completion: September 2031 (Foundation stone laid July 2026).

Geospatial alignment

Jaipur Metro Rail Network Route Map & Network Map

Loading GIS Map Environment...
Network Corridors

Jaipur Metro Lines & Stations

Jaipur Metro Corridors & Master Plan Network

2 Lines
Technical & Operational Overview

Jaipur Metro Network Statistics

Operational Network11.64 km (11 Stations)
Pink Line Extensions4.20 km (3 Stations Under Const.)
Phase 2 (North–South)41.0 km (36 Stations Underway)
Electrification25 kV AC 50 Hz OHE
Rolling StockBEML 4-Car Stainless EMUs
Combined Corridors56.84 km Project Corridors
Development Roadmap

Jaipur Metro Rail Network Timeline

2010

Project Approval & Foundation

Government of Rajasthan approved Phase 1 DPR and laid the foundation stone for the Jaipur Metro Rail project.

2011

Phase 1A Construction Launch

Civil construction launched on Phase 1A elevated viaducts and stations from Mansarovar to Chandpole.

June 2015

Phase 1A Commercial Opening

Commercial operations commissioned on Phase 1A Pink Line (9.63 km, 9 stations: Mansarovar to Chandpole).

September 2020

Phase 1B Heritage Underground Opening

Underground twin-tunnel extension from Chandpole to Badi Chaupar (2.01 km, 2 stations) opened beneath the Walled City.

2024

Phase 1C & 1D Civil Works

Construction initiated on Phase 1C (Badi Chaupar to Transport Nagar via Ramganj Chaupar, 2.85 km) and Phase 1D (Mansarovar to Ajmer Road Chauraha, 1.35 km).

April 2026

Phase 2 Union Cabinet Sanction

Union Cabinet approved the 41 km, 36-station North–South Corridor (Prahladpura to Todi Mod) at ₹13,037.66 Cr with active tender packages.

September 2031

Target Completion: Phase 2

Targeted full operational commissioning of the 41 km North–South Corridor connecting Prahladpura and Todi Mod.

Intermodal Integration

Connectivity

Jaipur International Airport (JAI)

Direct rapid transit access via Sanganer PS and Jaipur Airport underground stations on the Phase 2 corridor along the airport arterial route.

Jaipur Junction Railway Station (IR)

Direct interchange with Indian Railways at Jaipur Junction Railway Station on Line 1, with planned Phase 2 connection at Gandhi Nagar Jaipur & Durgapura.

Sindhi Camp & Khasa Kothi Interchange Hub

Multi-modal transit interchange connecting Jaipur Metro with RSRTC interstate bus services and the planned Line 1–Line 2 interchange hub at Khasa Kothi.

National Highways & Expressways

Direct integration with NH-48 (Delhi–Jaipur–Ajmer Expressway), NH-21 (Agra Road), NH-52 (Tonk Road & Sikar Road), and the Jaipur 200 Feet Ring Road.

Strategic Impact

Why Jaipur Metro Matters

UNESCO Heritage City Mobility & Preservation

Underground bored twin tunnels and modern vibration-damping track structures protect historic architectural marvels like Hawa Mahal, City Palace, and Jantar Mantar while eliminating vehicular emissions in the Walled City.

Decongesting Dense Commercial & Highway Corridors

Diverts daily commuter loads off MI Road, Tonk Road, Sikar Road, and Ajmer Road, reducing travel times and traffic bottlenecks across the capital.

Connecting Industrial & Healthcare Growth Corridors

Provides clean electric rapid transit linking major employment zones including Sitapura Industrial Area, Mansarovar, VKIA, and critical healthcare hubs like SMS Hospital.

Real-time Briefings

Latest Jaipur Metro News & Updates

Answers

Frequently Asked Questions

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Rajasthan Dashboard →RJ
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
RELATED
Never miss a project update.

Join the Infracapitalist Newsletter