Jaipur Metro (operated by Jaipur Metro Rail Corporation) is Rajasthan's flagship urban rapid transit system. The network features the operational 11.64 km Pink Line (Mansarovar to Badi Chaupar) with 11 stations traversing the UNESCO World Heritage Walled City, active Phase 1C & 1D extensions under construction, and the approved 41.0 km Phase 2 North–South corridor connecting Prahladpura to Todi Mod with construction packages underway (Target completion: September 2031 at ₹13,037.66 Cr).
Jaipur Metro Route, Lines & Phase 2 Expansion
The Jaipur Metro Rail Corporation (JMRC) and Rajasthan Metro Rail Corporation Limited (RMRCL) are expanding the urban rail network from its operational 11.64 km Pink Line into a comprehensive citywide rapid transit network:
Line 1 — Pink Line (Phase 1A + Phase 1B: 11.64 km Operational)
Fully operational east-west arterial spine connecting Mansarovar residential hub, Civil Lines, Jaipur Junction, Sindhi Camp bus terminal, and the historic UNESCO World Heritage Walled City landmarks of Chandpole, Chhoti Chaupar, and Badi Chaupar across 11 stations (8 elevated, 3 underground).
Line 1 Extensions — Phase 1C (2.85 km) & Phase 1D (1.35 km)
Two active under-construction extensions: Phase 1C extends eastward from Badi Chaupar to Transport Nagar on Agra Road (NH-21) via Ramganj Chaupar (0.97 km UG + 1.88 km elevated, 2 stations); Phase 1D extends south-west from Mansarovar to 200 Feet Bypass at Ajmer Road Chauraha (1.35 km elevated, 1 station).
Line 2 — Phase 2 (North–South Corridor), commonly referred to as Orange Line (41.0 km)
Approved with construction packages underway following Union Cabinet sanction in April 2026 at ₹13,037.66 Cr. Spans 41.0 km across 36 stations (34 elevated, 2 underground) from Prahladpura in the south to Todi Mod in the north, including Sanganer PS and Jaipur Airport underground stations, and planned interchange with Phase 1 at Khasa Kothi. Target completion: September 2031 (Foundation stone laid July 2026).
Jaipur Metro Rail Network Route Map & Network Map
Jaipur Metro Lines & Stations
Jaipur Metro Corridors & Master Plan Network
2 Lines| Line | Status | Length | Stations | Details |
|---|---|---|---|---|
Line 1 — Pink Line (Mansarovar ↔ Badi Chaupar & Extensions) Mansarovar / Ajmer Road Chauraha ↔ Badi Chaupar / Transport Nagar | Partially Operational | 11.64 km Operational (15.84 km Total) | 14 Stations | View Corridor Details→ |
Phase 2 (North–South Corridor), commonly referred to as Orange Line Prahladpura ↔ Todi Mod | Under Construction | 41.0 km | 36 Stations | View Corridor Details→ |
Jaipur Metro Network Statistics
Jaipur Metro Rail Network Timeline
Project Approval & Foundation
Government of Rajasthan approved Phase 1 DPR and laid the foundation stone for the Jaipur Metro Rail project.
Phase 1A Construction Launch
Civil construction launched on Phase 1A elevated viaducts and stations from Mansarovar to Chandpole.
Phase 1A Commercial Opening
Commercial operations commissioned on Phase 1A Pink Line (9.63 km, 9 stations: Mansarovar to Chandpole).
Phase 1B Heritage Underground Opening
Underground twin-tunnel extension from Chandpole to Badi Chaupar (2.01 km, 2 stations) opened beneath the Walled City.
Phase 1C & 1D Civil Works
Construction initiated on Phase 1C (Badi Chaupar to Transport Nagar via Ramganj Chaupar, 2.85 km) and Phase 1D (Mansarovar to Ajmer Road Chauraha, 1.35 km).
Phase 2 Union Cabinet Sanction
Union Cabinet approved the 41 km, 36-station North–South Corridor (Prahladpura to Todi Mod) at ₹13,037.66 Cr with active tender packages.
Target Completion: Phase 2
Targeted full operational commissioning of the 41 km North–South Corridor connecting Prahladpura and Todi Mod.
Connectivity
Jaipur International Airport (JAI)
Direct rapid transit access via Sanganer PS and Jaipur Airport underground stations on the Phase 2 corridor along the airport arterial route.
Jaipur Junction Railway Station (IR)
Direct interchange with Indian Railways at Jaipur Junction Railway Station on Line 1, with planned Phase 2 connection at Gandhi Nagar Jaipur & Durgapura.
Sindhi Camp & Khasa Kothi Interchange Hub
Multi-modal transit interchange connecting Jaipur Metro with RSRTC interstate bus services and the planned Line 1–Line 2 interchange hub at Khasa Kothi.
National Highways & Expressways
Direct integration with NH-48 (Delhi–Jaipur–Ajmer Expressway), NH-21 (Agra Road), NH-52 (Tonk Road & Sikar Road), and the Jaipur 200 Feet Ring Road.
Why Jaipur Metro Matters
UNESCO Heritage City Mobility & Preservation
Underground bored twin tunnels and modern vibration-damping track structures protect historic architectural marvels like Hawa Mahal, City Palace, and Jantar Mantar while eliminating vehicular emissions in the Walled City.
Decongesting Dense Commercial & Highway Corridors
Diverts daily commuter loads off MI Road, Tonk Road, Sikar Road, and Ajmer Road, reducing travel times and traffic bottlenecks across the capital.
Connecting Industrial & Healthcare Growth Corridors
Provides clean electric rapid transit linking major employment zones including Sitapura Industrial Area, Mansarovar, VKIA, and critical healthcare hubs like SMS Hospital.
Latest Jaipur Metro News & Updates
Frequently Asked Questions
Enjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.