Mumbai Metro Line 10 (Gaimukh - Shivaji Chowk) Route Map, Stations & Status

Approved – Tendering / Pre-construction📏 9.718 km (9.72 km)🚉 5 Stations🏢 Agency: MMRDA | Operator: MMMOCL (upon commissioning)

Mumbai Metro Line 10 (Green Line Extension / Metro Line 10 Mumbai / Gaimukh Metro / Gaimukh–Shivaji Chowk Metro / Mira Road Metro Line 10) is an approved 9.718 km (9.72 km) elevated rapid transit corridor connecting Gaimukh Reti Bandar (Thane West) to Shivaji Chowk (Mira Road) via Chena Village, Varsova Char Phata, and Kashimira. Implemented by MMRDA at an approved cost of ₹8,536.24 Crores (+ IDC), Line 10 features 5 official elevated stations, Mogharpada Depot (41 Hectares), and planned interchanges with Line 4A Green Line at Gaimukh, Metro Line 9 at Kashimira and Shivaji Chowk (Mira Road), and future Metro Line 13. Track Metro Line 10 Route, Line 10 Metro Stations, Gaimukh Mira Road Metro progress, Metro Line 10 Latest Update, and Metro Line 10 Completion Date.

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Mumbai Metro Line 10 (Gaimukh - Shivaji Chowk) Economics

Mumbai Metro Line 10 (Gaimukh - Shivaji Chowk) Economics

Total Investment₹8,536.24 Crores (+ IDC)
Primary BackersMMRDA Equity & Multilateral Loan Assistance
Operator / ModelMMMOCL (upon commissioning)
Target Opening

Expected Completion Date

StatusApproved – Tendering / Pre-construction
Target Opening DateApproved – Tendering / Pre-construction
Station list

Mumbai Metro Line 10 (Gaimukh - Shivaji Chowk) Stations

#StationTypeInterchange / ConnectionOpened
01
Gaimukh Reti Bandar
Terminal / InterchangeLine 4A (Green Line Extension)Approved – Tendering
02
Chena Village
RegularChena Village FeederApproved – Tendering
03
Varsova Char Phata
RegularGhodbunder Road / Versova Char Phata FeederApproved – Tendering
04
Kashimira
InterchangeMetro Line 9 (Planned Interchange)Approved – Tendering
05
Shivaji Chowk (Mira Road)
Terminal / InterchangeMetro Line 9 & Future Metro Line 13Approved – Tendering
Geospatial Alignment

Mumbai Metro Line 10 (Gaimukh - Shivaji Chowk) Route Map

Loading GIS Map Environment...
Specs sheet

Mumbai Metro Line 10 (Gaimukh - Shivaji Chowk) Technical Specifications

ParameterValue
Corridor StatusApproved – Tendering / Pre-construction
Line Number10 (Green Line Extension)
Total Length9.718 km (9.72 km)
Stations Count5
Corridor TypeFully Elevated
Implementing AgencyMMRDA
OperatorMMMOCL (upon commissioning)
Opened / Est. OpeningApproved – Tendering / Pre-construction
Maximum Design Speed80 km/h
Track GaugeStandard Gauge (1435 mm)
Electrification System25kV AC overhead catenary (OHE)
Primary DepotMogharpada Depot (Thane, 41 Hectares - Shared with Line 4 & 4A)
Chronological Milestones

Mumbai Metro Line 10 (Gaimukh - Shivaji Chowk) Timeline

06 Sep 2019

Approved by Maharashtra State Cabinet under MMRDA Master Plan.

24 Dec 2019

Project sanctioned by MMRDA Executive Committee.

2025

Tender process announced for civil construction and double-decker flyover alignment.

2026

Financing and tender activities underway across the 9.718 km corridor.

Proprietary analytics

Mumbai Metro Line 10 (Gaimukh - Shivaji Chowk) Economic & Connectivity Impact

Economic Significance

Establishes an essential East-West rapid transit connection between Ghodbunder Road in Thane and Mira Road in Palghar/MMR at an approved cost of ₹8,536.24 Crores (+ IDC).

Traffic Impact

Expected to significantly reduce travel time between Gaimukh and Mira Road compared to severe road bottlenecks at Fountain Hotel junction.

Employment Centres Served

Connects residential hubs in Ghodbunder and Mira Road directly to industrial and commercial belts in Thane, Borivali, and Dahisar.

Intermodal Connectivity

Provides seamless single-change transit from Wadala/Thane (via Line 4A) across to Mira Road (Line 9) and Vasai-Virar (via Line 13).

Impact on Real Estate

Spurring transit-oriented residential development and commercial growth along the Ghodbunder-Mira Road highway stretch.

Geospatial Explorer

Mumbai Metro Line 10 (Gaimukh - Shivaji Chowk) Alignment Map & GIS Explorer

Elevated / UndergroundElevated: 9.718 km | Underground: 0 km
Viaduct Length9.718 km
Tunnel Length0 km
River CrossingsChenna Creek Tributary Viaduct Spans
Major Bridges / CrossingsDouble-decker Elevated Viaduct over MSRDC Flyover & Ghodbunder Road
Primary DepotMogharpada Depot (Lat: 19.268, Lon: 72.965)
Answers

Frequently Asked Questions

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

Project milestones
Government approvals
Construction progress
New project launches
Found incorrect data?
Never miss a project update.

Join the Infracapitalist Newsletter