Mumbai Metro Line 10 (Gaimukh - Shivaji Chowk) Route Map, Stations & Status
Mumbai Metro Line 10 (Green Line Extension / Metro Line 10 Mumbai / Gaimukh Metro / Gaimukh–Shivaji Chowk Metro / Mira Road Metro Line 10) is an approved 9.718 km (9.72 km) elevated rapid transit corridor connecting Gaimukh Reti Bandar (Thane West) to Shivaji Chowk (Mira Road) via Chena Village, Varsova Char Phata, and Kashimira. Implemented by MMRDA at an approved cost of ₹8,536.24 Crores (+ IDC), Line 10 features 5 official elevated stations, Mogharpada Depot (41 Hectares), and planned interchanges with Line 4A Green Line at Gaimukh, Metro Line 9 at Kashimira and Shivaji Chowk (Mira Road), and future Metro Line 13. Track Metro Line 10 Route, Line 10 Metro Stations, Gaimukh Mira Road Metro progress, Metro Line 10 Latest Update, and Metro Line 10 Completion Date.
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Mumbai Metro Line 10 (Gaimukh - Shivaji Chowk) Economics
Expected Completion Date
Mumbai Metro Line 10 (Gaimukh - Shivaji Chowk) Stations
| # | Station | Type | Interchange / Connection | Opened |
|---|---|---|---|---|
| 01 | Gaimukh Reti Bandar | Terminal / Interchange | Line 4A (Green Line Extension) | Approved – Tendering |
| 02 | Chena Village | Regular | Chena Village Feeder | Approved – Tendering |
| 03 | Varsova Char Phata | Regular | Ghodbunder Road / Versova Char Phata Feeder | Approved – Tendering |
| 04 | Kashimira | Interchange | Metro Line 9 (Planned Interchange) | Approved – Tendering |
| 05 | Shivaji Chowk (Mira Road) | Terminal / Interchange | Metro Line 9 & Future Metro Line 13 | Approved – Tendering |
Mumbai Metro Line 10 (Gaimukh - Shivaji Chowk) Route Map
Mumbai Metro Line 10 (Gaimukh - Shivaji Chowk) Technical Specifications
| Parameter | Value |
|---|---|
| Corridor Status | Approved – Tendering / Pre-construction |
| Line Number | 10 (Green Line Extension) |
| Total Length | 9.718 km (9.72 km) |
| Stations Count | 5 |
| Corridor Type | Fully Elevated |
| Implementing Agency | MMRDA |
| Operator | MMMOCL (upon commissioning) |
| Opened / Est. Opening | Approved – Tendering / Pre-construction |
| Maximum Design Speed | 80 km/h |
| Track Gauge | Standard Gauge (1435 mm) |
| Electrification System | 25kV AC overhead catenary (OHE) |
| Primary Depot | Mogharpada Depot (Thane, 41 Hectares - Shared with Line 4 & 4A) |
Mumbai Metro Line 10 (Gaimukh - Shivaji Chowk) Timeline
Approved by Maharashtra State Cabinet under MMRDA Master Plan.
Project sanctioned by MMRDA Executive Committee.
Tender process announced for civil construction and double-decker flyover alignment.
Financing and tender activities underway across the 9.718 km corridor.
Mumbai Metro Line 10 (Gaimukh - Shivaji Chowk) Economic & Connectivity Impact
Economic Significance
Establishes an essential East-West rapid transit connection between Ghodbunder Road in Thane and Mira Road in Palghar/MMR at an approved cost of ₹8,536.24 Crores (+ IDC).
Traffic Impact
Expected to significantly reduce travel time between Gaimukh and Mira Road compared to severe road bottlenecks at Fountain Hotel junction.
Employment Centres Served
Connects residential hubs in Ghodbunder and Mira Road directly to industrial and commercial belts in Thane, Borivali, and Dahisar.
Intermodal Connectivity
Provides seamless single-change transit from Wadala/Thane (via Line 4A) across to Mira Road (Line 9) and Vasai-Virar (via Line 13).
Impact on Real Estate
Spurring transit-oriented residential development and commercial growth along the Ghodbunder-Mira Road highway stretch.
Mumbai Metro Line 10 (Gaimukh - Shivaji Chowk) Alignment Map & GIS Explorer