METRO CORRIDOR DOSSIER // MUMBAI-METRO-LINE-12

Mumbai Metro Line 12 (Kalyan - Taloja) Route Map, Stations & Status

Under Construction📏 23.57 km🚉 17 Stations🏢 Agency: MMRDA | Operator: MMMOCL (upon commissioning)

Mumbai Metro Line 12 (Orange Line Extension / Metro Line 12 Mumbai / Kalyan Taloja Metro / Kalyan Metro Line 12) is a 23.57 km under-construction elevated rapid transit corridor extending Line 5 (Orange Line) southwards from Kalyan APMC to Taloja MIDC & Amandoot in Navi Mumbai. Implemented by MMRDA, the line will be operated by MMMOCL upon commissioning. Line 12 features 19 elevated stations, Nilje Depot (31 hectares), and major interchanges with Line 5, Line 14 at Hedutane, and Navi Mumbai Metro Line 1 at Amandoot. Track Kalyan Taloja Metro Project, Line 12 Metro Stations, Metro Line 12 Route Map, Taloja Metro Station interchanges, Metro Line 12 Completion Date, Taloja Metro Project updates, and Kalyan Taloja Metro Project News.

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Mumbai Metro Line 12 (Kalyan - Taloja) Economics

Mumbai Metro Line 12 (Kalyan - Taloja) Economics

Total Investment₹5,865 Crores (Sanctioned Cost)
Primary BackersMMRDA Equity & JICA / Multilateral Loan Assistance
Operator / ModelMMMOCL (upon commissioning)
Target Opening

Expected Completion Date

StatusUnder Construction
Target Opening DateUnder Construction
Station list

Mumbai Metro Line 12 (Kalyan - Taloja) Stations

#StationTypeInterchange / ConnectionOpened
01
Kalyan APMC
Terminal / InterchangeLine 5 (Orange Line)Under Construction
02
Ganesh Nagar (Kalyan)
RegularKalyan East Residential NodeUnder Construction
03
Pisavali Gaon
RegularPisavali FeederUnder Construction
04
Golavali
RegularGolavali Industrial FeederUnder Construction
05
Dombivli MIDC
RegularDombivli Industrial BeltUnder Construction
06
Sagaon
RegularSagaon Commercial NodeUnder Construction
07
Sonarpada
RegularDombivli East Commercial NodeUnder Construction
08
Manpada (Dombivli East)
RegularManpada Road FeederUnder Construction
09
Hedutane
InterchangeLine 14Under Construction
10
Kolegaon
RegularShilphata Commercial NodeUnder Construction
11
Nilje Gaon
RegularNilje Railway Station & DepotUnder Construction
12
Vadavali
RegularKalyan Rural FeederUnder Construction
13
Bale
RegularBale Rural FeederUnder Construction
14
Waklan
RegularWaklan Junction FeederUnder Construction
15
Turbhe
RegularTurbhe Kalyan FeederUnder Construction
16
Pisarve
Depot StationPisarve Depot NodeUnder Construction
17
Amandoot (Taloja)
Terminal / InterchangeNavi Mumbai Metro Line 1Under Construction
Geospatial Alignment

Mumbai Metro Line 12 (Kalyan - Taloja) Route Map

Loading GIS Map Environment...
Specs sheet

Mumbai Metro Line 12 (Kalyan - Taloja) Technical Specifications

ParameterValue
Corridor StatusUnder Construction
Line Number12 (Orange Line Extension)
Total Length23.57 km
Stations Count17
Corridor TypeFully Elevated
Implementing AgencyMMRDA
OperatorMMMOCL (upon commissioning)
Opened / Est. OpeningUnder Construction
Maximum Design Speed80 km/h
Track GaugeStandard Gauge (1435 mm)
Electrification System25kV AC overhead catenary (OHE)
Primary DepotNilje / Pisarve Depot (31 Hectares)
Chronological Milestones

Mumbai Metro Line 12 (Kalyan - Taloja) Timeline

06 Sep 2019

Government of Maharashtra approval for Metro Line 12 DPR.

24 Dec 2019

Project sanctioned by MMRDA Executive Committee.

03 Mar 2024

Foundation stone laid by Chief Minister Eknath Shinde.

2024

EPC civil packages C-101 and C-102 awarded to Gawar Construction Ltd and Montecarlo Ltd

Active

Piling, pier construction, U-girder erection and civil works progressing across the 23.57 km corridor.

Proprietary analytics

Mumbai Metro Line 12 (Kalyan - Taloja) Economic & Connectivity Impact

Economic Significance

Establishes a high-capacity transit bridge between Kalyan-Dombivli and Navi Mumbai (Taloja), bypassing severe road congestion on Shilphata Road.

Traffic Impact

Expected to reduce travel time between Kalyan and Taloja from over 75 minutes by road to under 30 minutes.

Employment Centres Served

Connects major employment hubs in Dombivli MIDC and Taloja MIDC directly with residential populations in Kalyan, Dombivli, and Navi Mumbai.

Intermodal Connectivity

Provides seamless single-change transit from Thane/Bhiwandi (via Line 5) through Kalyan down to Navi Mumbai Metro Line 1 at Amandoot (Taloja).

Impact on Real Estate

Catalyzing massive transit-oriented township development and affordable housing growth along the Kalyan-Shilphata corridor.

Geospatial Explorer

Mumbai Metro Line 12 (Kalyan - Taloja) Alignment Map & GIS Explorer

Elevated / UndergroundElevated: 23.57 km | Underground: 0 km
Viaduct Length23.57 km
Tunnel Length0 km
River CrossingsKalu River & Ulhas River Tributary Viaduct Spans
Major Bridges / CrossingsViaduct Spans over Central Railway Line & Kapa Road Flyovers
Primary DepotNilje / Pisarve Depot (31 Hectares - Lat: 19.145, Lon: 73.092)
Answers

Frequently Asked Questions

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

Project milestones
Government approvals
Construction progress
New project launches
Found incorrect data?
Never miss a project update.

Join the Infracapitalist Newsletter