METRO CORRIDOR DOSSIER // MUMBAI-METRO-LINE-13

Mumbai Metro Line 13 (Mira-Bhayandar – Virar) Route Map, Stations & Status

Revised DPR Submitted / Government Review📏 24.90 km🚉 17 (14 Elevated + 3 Underground) Stations🏢 Agency: MMRDA | Operator: To be notified

Mumbai Metro Line 13 (Mira-Bhayandar – Virar) is a proposed 24.9 km hybrid transit corridor connecting Subhash Chandra Ground (SCGS) in Mira-Bhayandar to Dongarpada (Global City) in Virar East. Based on the 2026 revised DPR submitted by DMRC/MMRDA to the Maharashtra Government at an estimated cost of ₹17,724 Crores, Line 13 features 17 stations (14 elevated + 3 underground stations: Chhatrapati Shivaji Maharaj Chowk, Juchandra, and Rajvali), multi-modal interchanges with Western Railway at Vasai Road, Nallasopara, and Virar stations, and connections with Metro Line 10 at Chhatrapati Shivaji Maharaj Chowk and Metro Line 9 near Subhash Chandra Ground. Track the latest Metro Line 13 approvals, DPR progress and construction updates.

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Mumbai Metro Line 13 (Mira-Bhayandar – Virar) Economics

Mumbai Metro Line 13 (Mira-Bhayandar – Virar) Economics

Total Investment₹17,724 Crores (Revised DPR Estimate)
Primary BackersGovernment of Maharashtra, MMRDA & Project Financing (subject to approval)
Operator / ModelTo be notified
Target Opening

Expected Completion Date

StatusRevised DPR Submitted / Government Review
Target Opening DateRevised DPR Submitted / Government Review
Station list

Mumbai Metro Line 13 (Mira-Bhayandar – Virar) Stations

#StationTypeInterchange / ConnectionOpened
01
Subhash Chandra Ground (SCGS)
Elevated TerminalMetro Line 9 (Mira-Bhayandar)Proposed
02
Naigaon
ElevatedNaigaon Road NetworkProposed
03
Chhatrapati Shivaji Maharaj Chowk
Underground / InterchangeMetro Line 10Proposed
04
Juchandra
UndergroundJuchandra Local AreaProposed
05
Rajvali
UndergroundRajvali Residential AreaProposed
06
Golani Naka
ElevatedNH-48 CorridorProposed
07
Vasai
Elevated / InterchangeWestern Railway – Vasai Road StationProposed
08
VVCMC Fire Station
ElevatedVasai–Virar Municipal ZoneProposed
09
Achole Village
ElevatedAchole AreaProposed
10
Nallasopara East
Elevated / InterchangeWestern Railway – Nallasopara StationProposed
11
Nallasopara West
ElevatedNallasopara WestProposed
12
Morya Nagar
ElevatedMorya NagarProposed
13
Yashwant Nagar
ElevatedYashwant NagarProposed
14
Virar
Elevated / InterchangeWestern Railway – Virar StationProposed
15
Viva College
ElevatedViva CollegeProposed
16
Yazoo Park
ElevatedYazoo Park TownshipProposed
17
Dongarpada (Global City)
Elevated TerminalProposed Metro Depot / Global CityProposed
Geospatial Alignment

Mumbai Metro Line 13 (Mira-Bhayandar – Virar) Route Map

Loading GIS Map Environment...
Specs sheet

Mumbai Metro Line 13 (Mira-Bhayandar – Virar) Technical Specifications

ParameterValue
Corridor StatusRevised DPR Submitted / Government Review
Line Number13
Total Length24.90 km
Stations Count17 (14 Elevated + 3 Underground)
Corridor Type21.65 km Elevated + 3.25 km Underground
Implementing AgencyMMRDA
OperatorTo be notified
Opened / Est. OpeningRevised DPR Submitted / Government Review
Maximum Design Speed80 km/h
Track GaugeStandard Gauge (1435 mm)
Electrification System25kV AC overhead catenary (OHE)
Primary DepotProposed depot at Dongarpada / Global City (subject to DPR approval)
Chronological Milestones

Mumbai Metro Line 13 (Mira-Bhayandar – Virar) Timeline

2025

Revised DPR prepared by DMRC/MMRDA with 24.9 km hybrid alignment, 3 underground stations, and double-decker Vasai Creek bridge.

2026

Revised DPR submitted to Maharashtra Government for state cabinet appraisal.

Current

Government appraisal and approval process underway across the 24.9 km corridor.

Proprietary analytics

Mumbai Metro Line 13 (Mira-Bhayandar – Virar) Economic & Connectivity Impact

Economic Significance

Establishes a major regional transit spine connecting Mira-Bhayandar with Vasai-Virar at a revised estimate of ₹17,724 Crores, introducing 3 underground stations (Chhatrapati Shivaji Maharaj Chowk, Juchandra, Rajvali) to minimize urban land acquisition.

Traffic Impact

Expected to alleviate severe overcrowding on Western Railway suburban local trains and bypass major congestion points on NH-48 Western Express Highway.

Employment Centres Served

Directly connects growing residential populations in Vasai-Virar with industrial belts in Golani Naka, Achole, and commercial hubs across Mumbai.

Intermodal Connectivity

Provides seamless multi-modal interchanges with Line 9 at SCGS, Line 10 at Chhatrapati Shivaji Maharaj Chowk, and Western Railway stations at Vasai Road, Nallasopara, and Virar.

Impact on Real Estate

Catalyzing transit-oriented affordable housing and commercial development along the Mira-Bhayandar-Vasai-Virar suburban belt.

Geospatial Explorer

Mumbai Metro Line 13 (Mira-Bhayandar – Virar) Alignment Map & GIS Explorer

Elevated / UndergroundElevated: 21.65 km | Underground: 3.25 km
Viaduct Length21.65 km
Tunnel Length3.25 km
River CrossingsDouble-decker Vasai Creek Bridge & Pelhar River Viaduct Spans
Major Bridges / CrossingsDouble-decker Bridge over Vasai Creek & Elevated Viaduct over Western Railway tracks
Primary DepotProposed depot at Dongarpada / Global City (subject to DPR approval)
Answers

Frequently Asked Questions

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

Project milestones
Government approvals
Construction progress
New project launches
Found incorrect data?
Never miss a project update.

Join the Infracapitalist Newsletter