METRO CORRIDOR DOSSIER // MUMBAI-METRO-LINE-14

Mumbai Metro Line 14 Route Map, Stations & Status

Fresh DPR & Feasibility Study Underway📏 43.69 km🚉 Station count under review (Revised DPR) Stations🏢 Agency: MMRDA | Operator: To be notified

Mumbai Metro Line 14 (Metro Line 14 Mumbai / Kanjurmarg Badlapur Metro / Kanjurmarg to Badlapur Metro Project / Badlapur Metro) is a proposed 43.69 km regional metro corridor connecting Kanjurmarg East and Badlapur East under a fresh DPR and feasibility study. Following an IIT Bombay technical review that recommended major revisions, MMRDA appointed a new consultant in 2026 to prepare a fresh DPR with the revised DPR examining approximately 24 stations along the corridor with the station count under review as part of the revised DPR. Confirmed corridor locations include Kanjurmarg, Ghansoli, Mahape, Shil Phata, Ambernath, and Badlapur.

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Mumbai Metro Line 14 Economics

Mumbai Metro Line 14 Economics

Total InvestmentUnder Revision (to be finalized in revised DPR)
Primary BackersGovernment Equity & Multilateral / PPP Financing (under review)
Operator / ModelTo be notified
Target Opening

Expected Completion Date

StatusFresh DPR & Feasibility Study Underway
Target Opening DateFresh DPR & Feasibility Study Underway
Station list

Mumbai Metro Line 14 Stations

#StationTypeInterchange / ConnectionOpened
01
Kanjurmarg
Conceptual NodeLine 6 (Pink Line) & Central Railway MainlineConceptual DPR
02
Vikhroli
Conceptual NodeEastern Express Highway FeederConceptual DPR
03
LBS Marg
Conceptual NodeLBS Marg PrecinctConceptual DPR
04
Chikoli
Conceptual NodeChikoli FeederConceptual DPR
05
Shil Phata
Conceptual NodeKalyan-Shilphata Highway JunctionConceptual DPR
06
Mahape
Conceptual NodeMillennium Business Park Tech HubConceptual DPR
07
Ghansoli
Conceptual NodeNavi Mumbai Suburban Railway (Trans-Harbour)Conceptual DPR
08
Airoli
Conceptual NodeAiroli Commercial BeltConceptual DPR
09
Turbhe
Conceptual NodeTurbhe MIDC Logistics ZoneConceptual DPR
10
Digha
Conceptual NodeDigha Suburban PrecinctConceptual DPR
11
Ambernath
Conceptual NodeCentral Railway Ambernath StationConceptual DPR
12
Loknagari
Conceptual NodeLoknagari Residential PrecinctConceptual DPR
13
Manpada
Conceptual NodeManpada Road FeederConceptual DPR
14
Palava City
Conceptual NodePalava Smart City PrecinctConceptual DPR
15
Badlapur North
Conceptual NodeCentral Railway Badlapur Station & Proposed DepotConceptual DPR
Geospatial Alignment

Mumbai Metro Line 14 Route Map

Loading GIS Map Environment...
Specs sheet

Mumbai Metro Line 14 Technical Specifications

ParameterValue
Corridor StatusFresh DPR & Feasibility Study Underway
Line Number14
Total Length43.69 km
Stations CountStation count under review (Revised DPR)
Corridor TypeFinal elevated/underground configuration under review
Implementing AgencyMMRDA
OperatorTo be notified
Opened / Est. OpeningFresh DPR & Feasibility Study Underway
Maximum Design Speed80 km/h
Track GaugeStandard Gauge (1435 mm)
Electrification System25kV AC overhead catenary (OHE)
Primary DepotDepot location: Under review
Chronological Milestones

Mumbai Metro Line 14 Timeline

2019

Original DPR commissioned by MMRDA for the Kanjurmarg–Badlapur corridor.

2025

IIT Bombay technical review recommended major alignment and ridership revisions.

2026

New consultant appointed by MMRDA to prepare a fresh DPR and feasibility study.

Current

Alignment, station locations, ridership and financial viability under review.

Proprietary analytics

Mumbai Metro Line 14 Economic & Connectivity Impact

Economic Significance

Establishes a 43.69 km strategic East-West and South-North rapid transit corridor connecting Mumbai's eastern suburbs, Navi Mumbai IT hubs, and extended MMR residential belts in Ambernath-Badlapur under a fresh DPR revision.

Traffic Impact

Expected to relieve extreme congestion on Shil Phata Road, Thane-Belapur Road, and Central Railway local train services between Kalyan, Ambernath, and Badlapur.

Employment Centres Served

Directly links major tech parks in Mahape (Millennium Business Park) and Navi Mumbai MIDC belts with suburban talent pools in Kanjurmarg, Dombivli, Ambernath, and Badlapur.

Intermodal Connectivity

Provides seamless multi-modal interchanges with Line 6, Line 12, Navi Mumbai Trans-Harbour Line, and Central Railway suburban mainline.

Impact on Real Estate

Catalyzing massive affordable housing, commercial, and transit-oriented development across the Shil Phata, Ambernath, and Badlapur growth centers.

Geospatial Explorer

Mumbai Metro Line 14 Alignment Map & GIS Explorer

Elevated / UndergroundAlignment configuration to be finalized in the revised DPR.
Viaduct LengthTo be finalized in the revised DPR
Tunnel LengthUnder Review
River CrossingsSubject to revised DPR alignment
Major Bridges / CrossingsMajor structures and bridge crossings to be finalized in the revised DPR
Primary DepotDepot location: Under review
Answers

Frequently Asked Questions

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

Project milestones
Government approvals
Construction progress
New project launches
Found incorrect data?
Never miss a project update.

Join the Infracapitalist Newsletter