Mumbai Metro Line 2A (Dahisar East - DN Nagar) Route Map, Stations & Status
Mumbai Metro Line 2A (Yellow Line / Line 2A Mumbai Metro) is an 18.6 km fully elevated rapid transit corridor connecting Dahisar (East) to Andheri (West) / DN Nagar Metro along New Link Road in the Western Suburbs of Mumbai. Operated by Maha Mumbai Metro Operation Corporation Limited (MMMOCL) and implemented by MMRDA, the Dahisar to DN Nagar Metro Route features 17 Metro Line 2A Stations, serving over 2 lakh passengers daily (Line 2A & 7 combined). Explore the Mumbai Metro Line 2A Route Map, Metro 2A Timings, and Dahisar to DN Nagar Metro Fare details.
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Mumbai Metro Line 2A (Dahisar East - DN Nagar) Economics
Mumbai Metro Line 2A (Dahisar East - DN Nagar) Stations
| # | Station | Type | Interchange / Connection | Opened |
|---|---|---|---|---|
| 01 | Dahisar (East) | Terminal | Line 7 (Red Line) | 2022 |
| 02 | Anand Nagar | Regular | — | 2022 |
| 03 | Kandarpada | Regular | — | 2022 |
| 04 | Mandapeshwar (IC Colony) | Regular | — | 2022 |
| 05 | Eksar | Regular | — | 2022 |
| 06 | Borivali (West) | Regular | — | 2022 |
| 07 | Pahadi Eksar | Regular | — | 2022 |
| 08 | Kandivali (West) | Regular | — | 2022 |
| 09 | Dahanukarwadi | Regular | — | 2022 |
| 10 | Valnai | Regular | — | 2023 |
| 11 | Malad (West) | Regular | — | 2023 |
| 12 | Lower Malad | Regular | — | 2023 |
| 13 | Pahadi Goregaon | Regular | — | 2023 |
| 14 | Goregaon (West) | Regular | — | 2023 |
| 15 | Oshiwara | Regular | — | 2023 |
| 16 | Lower Oshiwara | Regular | — | 2023 |
| 17 | Andheri (West) | Terminal | Line 1 (Blue Line) & Line 2B (DN Nagar Interchange) | 2023 |
Mumbai Metro Line 2A (Dahisar East - DN Nagar) Route Map
Mumbai Metro Line 2A (Dahisar East - DN Nagar) Technical Specifications
| Parameter | Value |
|---|---|
| Corridor Status | Operational |
| Line Number | 2A (Yellow Line) |
| Total Length | 18.6 km |
| Stations Count | 17 |
| Corridor Type | Fully Elevated |
| Operator | Maha Mumbai Metro Operation Corporation Limited (MMMOCL) |
| Opened / Est. Opening | 19 January 2023 (Phase 1 opened 2 April 2022) |
| Maximum Design Speed | 80 km/h |
| Track Gauge | Standard Gauge (1435 mm) |
| Electrification System | 25kV AC overhead catenary (OHE) |
| Primary Depot | Charkop Depot (Malad West) |
Mumbai Metro Line 2A (Dahisar East - DN Nagar) Timeline
Approved by Maharashtra Cabinet under MMRDA Master Plan
Foundation stone laid by Prime Minister Narendra Modi; civil construction begins
First trial run flagged off between Dahanukarwadi and Aarey
Phase 1 (Dahisar East to Dahanukarwadi, 9.5 km) inaugurated on 2 April 2022
Phase 2 (Dahanukarwadi to Andheri West, 9.1 km) inaugurated on 19 January 2023
100% Operational serving over 2 lakh passengers daily (Line 2A & 7 combined)
Mumbai Metro Line 2A (Dahisar East - DN Nagar) Economic & Connectivity Impact
Economic Significance
Reduces travel time on the Metro 2A Route from 75+ minutes by road to approximately 30 minutes by metro.
Traffic Impact
Serves over 2 lakh passengers daily (Line 2A & 7 combined), easing traffic congestion along SV Road and WEH.
Employment Centres Served
Serves key Western Suburb employment centers in Borivali, Kandivali, Malad West, Goregaon West, and Oshiwara.
Intermodal Connectivity
Direct interchange with Line 7 at Dahisar (East) and Line 1 at Andheri (West) / DN Nagar Metro.
Impact on Real Estate
Spurred transit-oriented commercial and residential development along the New Link Road corridor.
Mumbai Metro Line 2A (Dahisar East - DN Nagar) Alignment Map & GIS Explorer
Frequently Asked Questions
Enjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.