Bangalore–Vijayawada Expressway Route Map (2026): Status, Districts Covered & Latest Update
The Bengaluru–Vijayawada Expressway (also widely searched as the Bangalore–Vijayawada Expressway) is a major greenfield access-controlled highway corridor being developed under the Bharatmala Pariyojana program. The project is designed to strengthen connectivity between Bengaluru, Andhra Pradesh, and the Vijayawada region while reducing travel time for passenger vehicles, freight operators, and long-distance logistics traffic.
Once fully operational, the expressway is expected to significantly improve interstate connectivity by providing a faster alternative to existing highway routes. The corridor passes through multiple districts across Karnataka and Andhra Pradesh and is expected to support industrial growth, logistics parks, manufacturing clusters, and future urban development along its alignment.
Visitors can use this page to track the latest Bengaluru–Vijayawada Expressway updates, route maps, land acquisition progress, construction status, package-level developments, contractor information, and expected completion timelines. Information is regularly compiled from publicly available government notifications, NHAI publications, tender documents, and official project announcements.
Bangalore–Vijayawada Expressway Route Map
Bangalore–Vijayawada Expressway Route Map and Alignment
The NH-544G Bangalore–Vijayawada Expressway is plan-profiled as a 518 km economic corridor. The alignment links Karnataka with central Andhra Pradesh, serving as a vital high-speed link.
It features major interchanges at Kodikonda, Kadiri, Pulivendula, Podili, Addanki, and Chilakaluripet, facilitating cargo ingress from regional hubs.
- Start Point: Kodikonda (Anantapur district, AP) on NH-44
- End Point: Addanki (Bapatla district, AP) on NH-16
- Major Interchanges: Kodikonda, Pulivendula, Mallepalli, Addanki
Package-1
"Kodur (0.000 km) to Vanavolu (24.300 km). Work is progressing under Dilip Buildcon."
Bangalore–Vijayawada Expressway Districts Covered
The Bangalore–Vijayawada Expressway corridor traverses multiple economic districts across Karnataka and Andhra Pradesh:
- Bengaluru Urban
- Bengaluru Rural
- Chikkaballapur
- Sri Sathya Sai
- Anantapur
- Kadapa
- Prakasam
- Nellore
- Guntur
- NTR (Vijayawada)
Bengaluru–Vijayawada Expressway Recent Developments (June 2026)
The Bengaluru–Vijayawada Expressway remains one of the most significant greenfield highway projects currently under development in southern India. Construction activities are progressing across multiple packages while land acquisition and utility relocation efforts continue along portions of the corridor.
The project is being implemented by the National Highways Authority of India (NHAI) under the Bharatmala Pariyojana initiative. Several construction packages have already entered active execution phases, with contractors undertaking earthwork, embankment development, bridge construction, culvert installation, and pavement preparation works.
Upon completion, the expressway is expected to substantially reduce travel times between Bengaluru and Vijayawada while improving connectivity for freight movement across Karnataka and Andhra Pradesh. Businesses, logistics operators, industrial developers, and commuters continue to closely monitor project progress due to its long-term economic significance.
Bengaluru–Vijayawada Expressway Cost, Length and Technical Specifications
| Parameter | Details |
|---|---|
| Project Name | Bengaluru–Vijayawada Expressway (NH-544G) |
| Start Point | Kodikonda, Anantapur district, AP |
| End Point | Addanki, Bapatla district, AP |
| Corridor Length | 518 km |
| Districts Covered | 10 districts (Bengaluru Urban, Bengaluru Rural, Chikkaballapur, Sri Sathya Sai, Anantapur, Kadapa, Prakasam, Nellore, Guntur, NTR) |
| Lanes | 4 lanes (expandable to 6) |
| Major Interchanges | Kodikonda, Pulivendula, Mallepalli, Addanki |
| Estimated Cost | ₹14,000 Crores (Revised) |
| Expected Completion | Staggered through 2026–2027 |
Bengaluru–Vijayawada Expressway Completion Date and Opening Timeline
Project Announcement
Expressway plan announced by AP Government to MoRTH.
Government Approval
Expressway approved by GoI and included in Bharatmala Pariyojana.
NH-544G Designation
NHAI designated route as NH-544G and invited technical bids.
Tender Call & Land Acq
NHAI invited civil bids. Land acquisition processes initiated.
First Package Awards
First four packages awarded to Dilip Buildcon & Raj Path Infracon.
Last Package Awarded
The final construction package awarded to MEIL.
Preparatory Works
Preparatory and alignment survey works commenced on site.
Foundation Stone
Foundation stone laid by PM Modi. Construction active; target 2026/27.
Bangalore–Vijayawada Expressway Route Map, Status & Opening Date
The Bangalore–Vijayawada Expressway route forms part of India's broader strategy to improve interstate connectivity through modern access-controlled highway infrastructure. The corridor has been planned to provide a high-speed connection between Bengaluru and the Vijayawada region while supporting freight transportation, industrial development, and regional economic integration.
The Bengaluru–Vijayawada Expressway completion date currently remains dependent on construction progress, package execution timelines, land acquisition activities, and statutory clearances across the corridor. Multiple project packages are being executed simultaneously to accelerate delivery.
The Bangalore Vijayawada Expressway route map continues to attract significant interest from commuters, logistics operators, and real estate investors seeking to understand future connectivity improvements across Karnataka and Andhra Pradesh. As construction advances, additional route-level and package-level updates are expected to be released through official government channels.
Latest Developments
News Timeline (0 Articles)
Bangalore–Vijayawada Expressway Video Updates
Frequently Asked Questions (FAQ)
The Bangalore–Vijayawada Expressway route map shows a 518 km corridor starting from Bengaluru, passing through key towns in Karnataka and Andhra Pradesh, and terminating near Vijayawada. The corridor consists of a 343 km greenfield access-controlled segment (NH-544G) combined with upgraded existing national highway sections.
The expressway passes through multiple districts across two states. In Karnataka, it covers Bengaluru Urban, Bengaluru Rural, and Chikkaballapur. In Andhra Pradesh, it passes through Sri Sathya Sai (Putaparthi), Anantapur, Kadapa, Prakasam, Nellore, Guntur, and NTR (Vijayawada) districts.
Construction is actively progressing across all 14 packages. The project has achieved over 93% land acquisition, and key civil contractors like Dilip Buildcon, Raj Path Infracon, and Megha Engineering (MEIL) are undertaking earthworks, bridge spans, and road paving.
While the initial deadline was December 2026, recent government reviews have set a broader 2027 completion target for the entire continuous corridor. Stretches will open in phases as individual packages conclude construction.
The National Highways Authority of India (NHAI) is implementing the project. Construction has been awarded to major contractors including Dilip Buildcon, Raj Path Infracon, Megha Engineering & Infrastructures Ltd. (MEIL), and Veda Engineering.
The corridor will reduce the travel time between Bangalore and Vijayawada from the current 12 hours down to approximately 6 hours, saving up to 6 hours and cutting about 110 km off the journey.
Related Infrastructure Projects
Pune Ring Road
A premium 136.8 km outer circular ring bypass road easing logistics transit surrounding Pune metropolis.
View Project →Delhi Mumbai Expressway
India's massive 1,350 km greenfield expressway reducing capital-to-financial hub transit down to 12 hours.
View Project →Lucknow–Kanpur Expressway
An advanced 63 km corridor (NE-6 / Awadh Expressway) slashing travel times between Lucknow and Kanpur to 45 minutes.
View Project →