Bangalore–Vijayawada Expressway Route Map (2026): Status, Districts Covered & Latest Update

The Bengaluru–Vijayawada Expressway (also widely searched as the Bangalore–Vijayawada Expressway) is a major greenfield access-controlled highway corridor being developed under the Bharatmala Pariyojana program. The project is designed to strengthen connectivity between Bengaluru, Andhra Pradesh, and the Vijayawada region while reducing travel time for passenger vehicles, freight operators, and long-distance logistics traffic.

Once fully operational, the expressway is expected to significantly improve interstate connectivity by providing a faster alternative to existing highway routes. The corridor passes through multiple districts across Karnataka and Andhra Pradesh and is expected to support industrial growth, logistics parks, manufacturing clusters, and future urban development along its alignment.

Visitors can use this page to track the latest Bengaluru–Vijayawada Expressway updates, route maps, land acquisition progress, construction status, package-level developments, contractor information, and expected completion timelines. Information is regularly compiled from publicly available government notifications, NHAI publications, tender documents, and official project announcements.

Project Scope & Cost AlignmentThe official greenfield expressway section (NH-544G) is 343 km long, with the total economic corridor (including existing highway upgrades) spanning 518 km. The total project cost has been revised downward to approximately ₹14,000 Crores, and the completion target has been adjusted to a broader **2027** timeline.
Total Length518 km
Estimated Cost₹14,000 Crores
Implementing AgencyNHAI
Current StatusUnder Construction
Completion Target2027
Route Map

Bangalore–Vijayawada Expressway Route Map

Bangalore–Vijayawada Expressway Route Map and Alignment

The NH-544G Bangalore–Vijayawada Expressway is plan-profiled as a 518 km economic corridor. The alignment links Karnataka with central Andhra Pradesh, serving as a vital high-speed link.

It features major interchanges at Kodikonda, Kadiri, Pulivendula, Podili, Addanki, and Chilakaluripet, facilitating cargo ingress from regional hubs.

  • Start Point: Kodikonda (Anantapur district, AP) on NH-44
  • End Point: Addanki (Bapatla district, AP) on NH-16
  • Major Interchanges: Kodikonda, Pulivendula, Mallepalli, Addanki
Loading GIS Map Environment...
Package

Package-1

Under Construction
CONTRACTOR:Dilip Buildcon
TARGET OPEN:December 2026
LAND ACQUIRED:95% acquired
CONSTRUCTION PROGRESS:42%
Field Status Summary

"Kodur (0.000 km) to Vanavolu (24.300 km). Work is progressing under Dilip Buildcon."

Update Tracker
District List

Bangalore–Vijayawada Expressway Districts Covered

The Bangalore–Vijayawada Expressway corridor traverses multiple economic districts across Karnataka and Andhra Pradesh:

  • Bengaluru Urban
  • Bengaluru Rural
  • Chikkaballapur
  • Sri Sathya Sai
  • Anantapur
  • Kadapa
  • Prakasam
  • Nellore
  • Guntur
  • NTR (Vijayawada)

Bengaluru–Vijayawada Expressway Recent Developments (June 2026)

The Bengaluru–Vijayawada Expressway remains one of the most significant greenfield highway projects currently under development in southern India. Construction activities are progressing across multiple packages while land acquisition and utility relocation efforts continue along portions of the corridor.

The project is being implemented by the National Highways Authority of India (NHAI) under the Bharatmala Pariyojana initiative. Several construction packages have already entered active execution phases, with contractors undertaking earthwork, embankment development, bridge construction, culvert installation, and pavement preparation works.

Upon completion, the expressway is expected to substantially reduce travel times between Bengaluru and Vijayawada while improving connectivity for freight movement across Karnataka and Andhra Pradesh. Businesses, logistics operators, industrial developers, and commuters continue to closely monitor project progress due to its long-term economic significance.

Project Parameters & Technical Details

Bengaluru–Vijayawada Expressway Cost, Length and Technical Specifications

ParameterDetails
Project NameBengaluru–Vijayawada Expressway (NH-544G)
Start PointKodikonda, Anantapur district, AP
End PointAddanki, Bapatla district, AP
Corridor Length518 km
Districts Covered10 districts (Bengaluru Urban, Bengaluru Rural, Chikkaballapur, Sri Sathya Sai, Anantapur, Kadapa, Prakasam, Nellore, Guntur, NTR)
Lanes4 lanes (expandable to 6)
Major InterchangesKodikonda, Pulivendula, Mallepalli, Addanki
Estimated Cost₹14,000 Crores (Revised)
Expected CompletionStaggered through 2026–2027
Development Timeline

Bengaluru–Vijayawada Expressway Completion Date and Opening Timeline

2021

Project Announcement

Expressway plan announced by AP Government to MoRTH.

August 2021

Government Approval

Expressway approved by GoI and included in Bharatmala Pariyojana.

September 2022

NH-544G Designation

NHAI designated route as NH-544G and invited technical bids.

December 2022

Tender Call & Land Acq

NHAI invited civil bids. Land acquisition processes initiated.

January 2023

First Package Awards

First four packages awarded to Dilip Buildcon & Raj Path Infracon.

February 2023

Last Package Awarded

The final construction package awarded to MEIL.

March 2023

Preparatory Works

Preparatory and alignment survey works commenced on site.

March 2024

Foundation Stone

Foundation stone laid by PM Modi. Construction active; target 2026/27.

Bangalore–Vijayawada Expressway Route Map, Status & Opening Date

The Bangalore–Vijayawada Expressway route forms part of India's broader strategy to improve interstate connectivity through modern access-controlled highway infrastructure. The corridor has been planned to provide a high-speed connection between Bengaluru and the Vijayawada region while supporting freight transportation, industrial development, and regional economic integration.

The Bengaluru–Vijayawada Expressway completion date currently remains dependent on construction progress, package execution timelines, land acquisition activities, and statutory clearances across the corridor. Multiple project packages are being executed simultaneously to accelerate delivery.

The Bangalore Vijayawada Expressway route map continues to attract significant interest from commuters, logistics operators, and real estate investors seeking to understand future connectivity improvements across Karnataka and Andhra Pradesh. As construction advances, additional route-level and package-level updates are expected to be released through official government channels.

Timeline

Latest Developments

Verified project updates from news sources and official announcements

News Timeline (0 Articles)