Hyderabad–Chennai Bullet Train: Route, Stations, Map & Latest Updates
The proposed Hyderabad–Chennai High-Speed Rail Corridor (CHHSR), widely searched as the Hyderabad Chennai bullet train project, is a planned ~760.09 km (reported revised alignment) high-speed railway connecting Telangana's capital Hyderabad with Tamil Nadu's capital Chennai via major economic, industrial, and administrative hubs in Andhra Pradesh including Amaravati, Guntur, Ongole, Nellore, and Tirupati. Designed for commercial operating speeds of 320 km/h (design speed 350 km/h), the corridor is expected to reduce travel time between Hyderabad and Chennai to around 2 hours 55 minutes, based on current project reporting. The Hyderabad Chennai high speed rail corridor was included among the new high-speed rail corridors announced in Union Budget 2026, with DPR and alignment work currently being developed by NHSRCL.
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Chennai–Hyderabad Bullet Train (High-Speed Rail Corridor)Route Map & Alignment
View and download the latest Chennai–Hyderabad Bullet Train (High-Speed Rail Corridor) route map showing the project alignment, major junctions, districts covered and connectivity corridors.
Advertisement // Sponsor
Chennai–Hyderabad Bullet Train (High-Speed Rail Corridor)Cost • Route • Timeline
| Parameter | Technical Details |
|---|---|
| Project Name | Chennai–Hyderabad Bullet Train (High-Speed Rail Corridor) |
| Total Length | 760.09 km |
| Estimated Cost | TBD |
| Implementing Authority | National High Speed Rail Corporation Limited (NHSRCL) / Ministry of Railways |
| Districts Covered | Rangareddy, Hyderabad (Telangana); Palnadu, Guntur, NTR, Prakasam, Nellore, Tirupati (Andhra Pradesh); Thiruvallur, Chennai (Tamil Nadu) |
| Number of Villages Affected | To be finalized after Detailed Project Report (DPR) and alignment approval |
| Current Phase | DPR Preparation & Alignment Survey (Union Budget 2026 Corridor) |
| Expected Completion Date | TBD |
| Corridor Length | ~760.09 km (reported revised alignment) |
| Estimated Cost | To be finalized after DPR |
| Track Gauge | 1,435 mm (Standard Gauge) |
| Commercial Operating Speed | 320 km/h |
| Max Design Speed | 350 km/h |
| Electrification System | 25 kV AC Overhead (OHE) |
| Estimated Travel Time | Around 2 hours 55 minutes |
| Planned Stations | 18 Proposed Stations (Subject to DPR finalisation) |
| Alignment Type | Dedicated high-speed rail corridor with elevated, underground and grade-separated sections subject to final DPR |
| Project Implementation | National High Speed Rail Corporation Limited (NHSRCL) |
Hyderabad Chennai Bullet Train Route Map & Proposed Stations List
The Hyderabad Chennai bullet train route map has undergone significant alignment revisions in 2026. The revised Telangana alignment incorporates the Future City / Dry Port / Haliya / Vadapalli corridor into Andhra Pradesh via Amaravati and Guntur. Based on recent feasibility reporting, the 18-station Hyderabad Chennai bullet train stations list includes:
Telangana Section (6 Proposed Stations)
- Hyderabad — Proposed HSR station / Hyderabad metropolitan connection
- Shamshabad — Proposed HSR station and southern Telangana hub
- Bharat Future City — Proposed high-speed rail node
- Dry Port — Proposed logistics & passenger node
- Haliya — Proposed Telangana station
- Vadapalli — Proposed Telangana border station
Andhra Pradesh Section (9 Proposed Stations)
- Dachepalli — Proposed Palnadu region station
- Amaravati — Proposed HSR station
- Guntur — Proposed HSR station
- Chirala — Proposed coastal station
- Ongole — Proposed commercial and trade hub station
- Kavali — Proposed Nellore district station
- Nellore — Proposed commercial hub station
- Gudur — Proposed railway junction node
- Tirupati — Proposed HSR station
Tamil Nadu Section (3 Proposed Stations)
- Tiruvallur — Proposed northern Tamil Nadu station
- Chennai Outer Ring Road — Proposed HSR station
- Chennai Central — Main southern terminus
Note: The exact final Hyderabad Chennai bullet train stations list, alignment coordinates, and depot locations remain subject to Detailed Project Report (DPR) finalisation and official Government sanction.
Hyderabad Chennai Bullet Train Alignment Overview
The dedicated double-track corridor will run parallel to major highway and rail rights-of-way where feasible to minimize greenfield land acquisition. By linking Hyderabad and Shamshabad to Amaravati, Guntur, and onward to Chennai, the Hyderabad Chennai high speed rail projectserves dual economic goals — linking South India's major IT, financial, and capital hubs with high-speed passenger rail.
Technical Specifications
- Track Gauge: Standard gauge (1,435 mm), complying with national NHSRCL bullet train standards.
- Electrification: 25 kV AC overhead electrification (OHE).
- Operating Speed: 320 km/h commercial operating speed; 350 km/h design speed.
- Signalling & Control: Advanced high-speed rail signalling and train-control systems, subject to final DPR and technology selection.
- Alignment Profile: Dedicated high-speed rail corridor with elevated, underground and grade-separated sections subject to final DPR.
Hyderabad–Shamshabad High-Speed Rail Integration
The Hyderabad end of the corridor is planned around Hyderabad–Shamshabad, with Shamshabad emerging as a major HSR hub. The Telangana government has approved revised proposals around Shamshabad, but NHSRCL is still to finalise the DPR, alignment, and station locations.
Hyderabad Chennai Bullet Train Project Status & DPR
The Hyderabad Chennai bullet train project status is currently in the Proposed / DPR Preparation phase. NHSRCL is undertaking DPR and alignment-related work for the proposed corridor. Estimated project cost and funding structures will be finalized after DPR completion and Cabinet sanction.
Why the Hyderabad Chennai Bullet Train Matters
- Connects major South Indian economic, industrial, and administrative centers with rapid transit.
- Transforms regional economic integration across Telangana, Andhra Pradesh, and Tamil Nadu.
- Diverts heavy passenger traffic from air corridors and congested national highways.
Hyderabad Chennai Bullet Train Latest Updates
Impact Zone: Affected Settlements
Places, towns, and villages located within the 1.5 km and 500m buffer corridors, as well as road crossing nodes along the project's alignment, identified via OpenStreetMap spatial analysis.
Running GIS Spatial Analysis...
Latest Developments
Video Updates
Frequently Asked Questions
The revised indicative alignment connects Shamshabad / Hyderabad → Bharat Future City → Dry Port → Haliya → Vadapalli → Dachepalli → Amaravati / Guntur → Chirala → Ongole → Kavali → Nellore → Gudur → Tirupati → Tiruvallur → Chennai. The exact alignment is subject to DPR finalisation.
At commercial operating speeds of 320 km/h, the corridor is expected to reduce travel time between Hyderabad and Chennai to around 2 hours 55 minutes, based on current project reporting, compared to 12–14 hours on conventional trains.
The project is currently in the 'Proposed / DPR Preparation' stage. The corridor was included among the new high-speed rail corridors announced in Union Budget 2026, with DPR and alignment work being developed.
Yes, recent reporting indicates Tirupati is a proposed HSR station along the main Hyderabad–Chennai corridor.
The revised corridor length is estimated at approximately ~760 km (760.09 km revised alignment).
The revised indicative 18-station alignment connects Hyderabad → Shamshabad → Bharat Future City → Dry Port → Haliya → Vadapalli → Dachepalli → Amaravati → Guntur → Chirala → Ongole → Kavali → Nellore → Gudur → Tirupati → Tiruvallur → Chennai Outer Ring Road → Chennai Central. The exact alignment is subject to DPR finalisation.
At commercial operating speeds of 320 km/h, the estimated travel time is around 2 hours 55 minutes between Hyderabad and Chennai, compared to 12–14 hours on conventional trains.
The project is currently in the 'Proposed / DPR Preparation' stage. The corridor was included among the new high-speed rail corridors announced in Union Budget 2026, with DPR and alignment work being developed.
Yes, recent reporting indicates Tirupati is a proposed HSR station along the main Hyderabad–Chennai corridor.
The estimated cost will be finalized after the Detailed Project Report (DPR) is completed and sanctioned.
The Chennai Hyderabad bullet train is a proposed High-Speed Rail (HSR) corridor connecting Chennai and Hyderabad. It was officially announced by the Government of India in the Union Budget 2026-27 as one of seven new HSR corridors. The project is currently in the planning and Detailed Project Report (DPR) stage and is not yet under construction.
The proposed Chennai Hyderabad high speed rail corridor will connect Chennai with Hyderabad as part of the planned southern high-speed rail network. The final station-by-station alignment has not yet been officially confirmed, so preliminary route proposals should not be treated as the final approved route.
The Chennai Hyderabad bullet train map should currently be treated as a proposed or DPR-stage alignment map rather than a final construction alignment. Detailed route and engineering information is still being developed, so older maps showing specific stations or village-level alignments may differ from the eventual approved route.
A final official station count has not yet been confirmed. Preliminary planning sources have suggested intermediate locations in Andhra Pradesh and other areas along the corridor, but these should not be presented as a definitive station list until the DPR and final alignment are officially approved.
The final sanctioned length of the Chennai Hyderabad high-speed rail corridor has not yet been officially established. Some secondary sources cite approximately 744.57 km, but this should be treated as a planning-stage estimate rather than a final approved project length.
The Government of India has indicated a planned travel time of approximately 2 hours 55 minutes between Chennai and Hyderabad on the proposed high-speed rail corridor. This is a planned journey-time target and not an operating timetable because the corridor has not yet entered commercial service.
A final sanctioned project cost for the Chennai Hyderabad bullet train has not yet been officially announced. The project is still progressing through DPR and development stages, so early cost estimates should not be presented as the definitive project cost.
No. The Chennai Hyderabad high-speed rail corridor is not currently under physical construction. The Government of India announced the corridor in the 2026-27 Budget, while DPR and feasibility work are being progressed for the new HSR corridors.
The major 2026 development is the inclusion of Chennai–Hyderabad among the Government of India's seven new High-Speed Rail corridors. The corridor is planned as part of a southern high-speed rail network linking Chennai, Bengaluru and Hyderabad, while detailed project preparation and DPR work continue.
There is currently no officially confirmed completion date for the Chennai Hyderabad bullet train. The project remains in the DPR and approval-development stage, so a construction completion date should not be published until the necessary approvals, financing and implementation schedule are established.
Yes. The Chennai–Hyderabad corridor is planned as part of a southern high-speed rail network connecting Chennai, Bengaluru and Hyderabad. The Government of India has separately announced Chennai–Bengaluru and Bengaluru–Hyderabad HSR corridors.
Related Infrastructure Projects
Mumbai–Ahmedabad High-Speed Rail
India's first bullet train — a 508 km high-speed rail corridor operating at 320 km/h, built with Japanese Shinkansen technology.
View Project →High-Speed Rail Network (India)
India's comprehensive high-speed and semi-high-speed rail network linking Delhi, Mumbai, Chennai, and Kolkata under the Diamond Quadrilateral program.