CORRIDOR DOSSIER INDEX // ELECTRONIC-CITY-BENGALURU

Electronic City Elevated Expressway Route Map, Toll, Traffic, Latest News & FASTag (2026)

Last Updated: September 2026
StatusFully Operational
Length9.98 km
Open SectionsAll Sections Open
CompletionOpened on 22 January 2010
Last UpdatedSeptember 2026
The Electronic City Elevated Expressway (Bengaluru Elevated Tollway) is an operational 9.98 km elevated highway corridor in South Bengaluru, linking Silk Board Junction to Electronic City along NH-44. Access the latest FASTag rules, travel time impact, toll calculator, live traffic status, entry points, and exit ramps.

The Electronic City Elevated Expressway (also known as the Hosur Road Elevated Expressway) is a fully operational, premium 9.98 km access-controlled elevated corridor developed by Bengaluru Elevated Tollway Private Limited (BETL).

The Electronic City Elevated Expressway Route connects South Bangalore to the key IT cluster. Commuting from Silk Board to Electronic City Elevated Expressway takes only 10 minutes compared to 45 minutes at grade. To bypass regular congestion, Electronic City Elevated Expressway Traffic conditions are monitored live at major entry/exit ramps.

Project Summary

"The Electronic City Elevated Expressway (Bengaluru Elevated Tollway) is a fully operational 9.98 km elevated tollway corridor connecting Silk Board Junction to Electronic City. Operated by BETL, it bypasses major at-grade traffic grids on Hosur Road (NH-44)."

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Total Length9.98 km
Estimated CostApproximately ₹775 crore (reported)
Implementing AgencyNational Highways Authority of India (NHAI) / BETL
Current StatusFully Operational
Completion TargetOpened on 22 January 2010
Route Map

Electronic City Elevated Expressway Route Map

View and download the latest Electronic City Elevated Expressway route map showing the project alignment, major junctions, districts covered and connectivity corridors.

Loading GIS Map Environment...
Project Name📍 Electronic City Elevated Expressway
Total Length9.98 km
Estimated CostApproximately ₹775 crore (reported)
Current StatusFully Operational
Project Parameters & Technical Details

Electronic City Elevated Expressway Technical Specs & Project Parameters

ParameterTechnical Specification
Official Project NameElectronic City Elevated Expressway (Bengaluru Elevated Tollway)
Total Corridor Length9.98 km
Estimated CostApproximately ₹775 crore (reported)
Implementing AuthorityNational Highways Authority of India (NHAI) / BETL
Corridor Width / RoW4-lane elevated structure built over existing 6-lane NH-44 highway
Corridor Start PointSilk Board Junction
Corridor End PointElectronic City (Hosur Road / NH-44)
Development ModelBOT (Build-Operate-Transfer) concession under NHAI
Current Project StatusFully Operational
Target CompletionOpened on 22 January 2010

Corridor Alignment & Engineering Features

Constructed above the NH-44 highway, the elevated tollway features 4 lanes of high-speed lanes. Checking the Electronic City Elevated Expressway Map helps commuters see the entry and exit ramp points at Bommanahalli, Singasandra, and Central Silk Board.

Paying the Electronic City Elevated Expressway Toll is mandatory for all vehicles. The plaza is fully integrated with national automated toll systems, enabling swift passages for all passenger and logistics vehicles.

Key Alignment Interchanges & Nodes Covered:
📍 Silk Board Junction📍 Bommanahalli📍 Kudlu Gate📍 Singasandra📍 Hosa Road📍 Electronic City
Timeline

Latest Electronic City Elevated Expressway News

Verified project updates from news sources and official announcements
Video Coverage

Video Updates

Latest drone footage, progress reports, and ground coverage
Project Schedule

Electronic City Elevated Expressway Timeline

2006

Concession Awarded

National Highways Authority of India (NHAI) awards the concession to Bengaluru Elevated Tollway Pvt Ltd (BETL) for development under a BOT model.

2006-2009

Expressway Construction

Civil construction of the 4-lane elevated structure along NH-44 Hosur Road corridor.

2010

Commercial Operation

The Electronic City Elevated Expressway is officially opened to public toll traffic, drastically cutting commute times.

General Inquiries

Electronic City Elevated Expressway FAQs

Related Infrastructure Projects

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Karnataka Dashboard →KA
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
RELATED
Never miss a project update.

Join the Infracapitalist Newsletter