Ganga Expressway (गंगा एक्सप्रेसवे) Route Map (2026): Districts Covered, Status & Latest Update
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Ganga Expressway Route Map & Alignment
View and download the latest Ganga Expressway route map showing the project alignment, major junctions, districts covered and connectivity corridors.
Ganga ExpresswayCost • Route • Timeline
| Parameter | Technical Details |
|---|---|
| Project Name | Ganga Expressway |
| Total Length | 594 km |
| Estimated Cost | ₹36,230 Crores |
| Expected Completion Date | 29 April 2026 |
| Total Packages | 12 packages |
Latest Developments
Video Updates
Frequently Asked Questions
It connects 12 districts in Uttar Pradesh: Meerut, Hapur, Bulandshahr, Amroha, Sambhal, Budaun, Shahjahanpur, Hardoi, Unnao, Raebareli, Pratapgarh, and Prayagraj.
The project is being constructed by IRB Infrastructure (Packages 1-3) and Adani Enterprises (Packages 4-12) under UPEIDA.
The Ganga Expressway route map spans 594 km from Bijauli village in Meerut on NH-334 to Judapur Dandu village in Prayagraj on NH-19.
The expressway passes through 12 districts in Uttar Pradesh: Meerut, Hapur, Bulandshahr, Amroha, Sambhal, Budaun, Shahjahanpur, Hardoi, Unnao, Raebareli, Pratapgarh, and Prayagraj.
The Ganga Expressway commenced public operations on 29 April 2026. Current focus has shifted to tolling setups, wayside amenities, safety systems, and future expansion planning.
The Ganga Expressway opened for vehicular movement on 29 April 2026.
The Uttar Pradesh Expressways Industrial Development Authority (UPEIDA) is implementing the project. Construction has been awarded to IRB Infrastructure (Packages 1-3) and Adani Enterprises (Packages 4-12).
The expressway is built as a 6-lane access-controlled greenfield corridor, which is expandable to 8 lanes in the future.
The Uttar Pradesh government announced a 15-day toll-free period immediately after opening to encourage public use. Following this period, standard distance-based tolls calculated by UPEIDA apply depending on the vehicle type.
Yes, the official route map PDF highlighting the alignment, 12 packages, major interchanges, and districts covered is available for download on the official UPEIDA website.
Travel time has reduced from approximately 10–12 hours to around 6 hours depending on traffic and entry/exit points.
At 594 km, the Ganga Expressway is among the longest access-controlled expressways in Uttar Pradesh.
गंगा एक्सप्रेसवे उत्तर प्रदेश का 594 किमी लंबा एक महत्वपूर्ण एक्सप्रेसवे प्रोजेक्ट है जो मेरठ (Bijauli) को प्रयागराज (Judapur Dandu) से जोड़ता है।
गंगा एक्सप्रेसवे का रूट मैप मेरठ, हापुड़, बुलंदशहर, अमरोहा, सम्भल, बदायूं, शाहजहाँपुर, हरदोई, उन्नाव, रायबरेली, प्रतापगढ़ और प्रयागराज जिलों से होकर गुजरता है।
गंगा एक्सप्रेसवे का उद्घाटन और जनता के लिए परिचालन 29 अप्रैल 2026 को शुरू हुआ।
गंगा एक्सप्रेसवे की कुल लंबाई 594 किलोमीटर (किमी) है, जो इसे उत्तर प्रदेश के सबसे लंबे एक्सप्रेसवे में से एक बनाती है।
गंगा एक्सप्रेसवे मुख्य रूप से उत्तर प्रदेश के 12 जिलों से होकर गुजरता है: मेरठ, हापुड़, बुलंदशहर, अमरोहा, सम्भल, बदायूं, शाहजहाँपुर, हरदोई, उन्नाव, रायबरेली, प्रतापगढ़ और प्रयागराज।
The Ganga Expressway is a 593.947 km, six-lane access-controlled greenfield expressway in Uttar Pradesh, expandable to eight lanes. It connects Bijauli in Meerut district with Judapur Dandu near the Prayagraj bypass and passes through 12 districts: Meerut, Hapur, Bulandshahr, Amroha, Sambhal, Badaun, Shahjahanpur, Hardoi, Unnao, Rae Bareli, Pratapgarh and Prayagraj. UPEIDA is the state nodal agency. The main corridor was inaugurated on 29 April 2026.
The Ganga Expressway route runs east–west across Uttar Pradesh from Meerut to Prayagraj. It starts near Bijauli on NH-334 in Meerut and terminates at the Prayagraj bypass on NH-19. The corridor passes through 12 districts and connects western, central and eastern Uttar Pradesh through an access-controlled greenfield alignment.
The official Ganga Expressway map shows the 593.947 km Meerut–Prayagraj alignment divided into four development groups. UPEIDA publishes separate Group-I, Group-II, Group-III and Group-IV alignment maps. These official alignment documents are preferable for village, interchange and package-level mapping over third-party Google Maps routes.
UPEIDA publishes the Ganga Expressway alignment maps for all four groups and project documentation containing detailed alignment information. The corridor passes through more than 500 villages across the 12 districts, while the official project alignment documents provide the detailed village and chainage information. A third-party village list should therefore be cross-checked against the UPEIDA alignment documents before being treated as definitive.
The official project length is 593.947 km, generally rounded to 594 km. UPEIDA describes it as approximately 594 km, while the original four-group PPP documentation specifies 593.947 km. The corridor is six lanes and designed to be expandable to eight lanes.
The current widely reported project cost for the 594 km Ganga Expressway is approximately ₹36,230 crore. This is the project-level figure used by the Uttar Pradesh government and the Union government for the completed corridor. Older planning documents sometimes quote different figures, so ₹36,230 crore should be used for the completed Phase-I corridor rather than mixing it with earlier estimates or later expansion proposals.
The main 594 km Ganga Expressway is operational. Prime Minister Narendra Modi inaugurated the completed corridor on 29 April 2026 at Hardoi. UPEIDA's current project page also records the inauguration and identifies the corridor as the 594 km Meerut–Prayagraj expressway.
The Ganga Expressway was inaugurated on 29 April 2026. The foundation stone was laid on 18 December 2021, and the 594 km corridor was subsequently completed and opened to traffic in April 2026. Therefore, older completion dates such as December 2024 or 2025 are historical targets and should not be presented as the current completion date.
The Ganga Expressway's actual opening date is 29 April 2026, when the 594 km Meerut–Prayagraj corridor was inaugurated. This date supersedes earlier announced or targeted completion dates that appeared during construction.
The 593.947 km project was divided into four groups containing 12 packages. IRB Infrastructure was the selected concessionaire for Group-I, covering Packages 1–3, while Adani Enterprises was selected for Groups II–IV, covering Packages 4–12. Major construction companies involved under these concessions included HG Infra Engineering on Group-II, Patel Infrastructure on Group-III and ITD Cementation on Group-IV; these companies should be described as EPC/subcontracting contractors rather than the primary UPEIDA concessionaires.
Yes. Adani Enterprises Ltd was selected by UPEIDA for Groups II, III and IV of the Ganga Expressway, representing the majority of the 594 km corridor. Adani Road Transport Ltd subsequently handled the development/construction ecosystem for these groups. Adani's own 2026 disclosures state that the Ganga Expressway was operationalised in April 2026 and that toll collection commenced in May 2026.
IRB Infrastructure Developers was the selected bidder for Group-I of the Ganga Expressway. Its concession covers the approximately 129.7 km Meerut–Budaun stretch, including districts such as Meerut, Hapur, Bulandshahr, Amroha, Sambhal and Budaun. IRB's project documentation lists the Group-I project cost at approximately ₹6,538 crore and the overall Ganga Expressway length at 594 km.
HG Infra Engineering was engaged by Adani Road Transport for the Ganga Expressway Group-II construction package. The Group-II design length is approximately 151.7 km, and HG Infra's project disclosures identify the Ganga Expressway as an Adani project. HG Infra later reported a provisional completion certificate for its Ganga Expressway work in June 2026.
Patel Infrastructure executed EPC work for Ganga Expressway Group-III under Adani Road Transport. Its project page identifies the Group-III section as running from km 289+300 near Ubariya Khurd in Hardoi to km 445+000 near Sarso in Unnao, with a design length of 155.700 km and a work value of approximately ₹4,732.57 crore. Patel Infrastructure also reported a 24-hour bituminous-concrete laying record on this section in May 2025.
Yes. CDS Infra Projects' own project portfolio lists 'Ganga Expressway Package 3' and identifies the mode as EPC with IRB. This is a contractor-level involvement and should not be confused with UPEIDA's four primary concessionaire groups, where IRB is the Group-I concessionaire.
Adani's involvement in the Ganga Expressway is established through its Groups II–IV concession and associated road-development operations. However, a project-specific 'Adani vacancy for Ganga Expressway' should not be treated as a permanent recruitment category unless an official Adani careers listing specifically identifies the Ganga Expressway project. The expressway itself is now operational, so current vacancies should be checked through Adani's official recruitment channels rather than assuming a Ganga Expressway-specific opening.
The principal 2026 development is that the 594 km Meerut–Prayagraj Ganga Expressway was inaugurated on 29 April 2026 and subsequently opened for operations. Adani Enterprises reported that toll collection began on 15 May 2026. Current developments increasingly concern the wider Ganga Expressway network, including the proposed Meerut–Haridwar extension and new link expressways.
The term 'Ganga Expressway Phase 2' is used for proposed extensions rather than the already operational 594 km Meerut–Prayagraj corridor. The clearest officially documented current extension is the proposed Meerut–Haridwar Expressway, which UPEIDA lists separately under its Proposed Plans. Other proposed links, including the Farrukhabad Link Expressway, are being developed to connect the Ganga Expressway with other expressway corridors. These should not be shown as part of the operational 594 km alignment.
Google Maps can be used for navigating the operational Ganga Expressway and locating its interchanges, but third-party map routes can change as access points and connected roads are updated. For the official Ganga Expressway alignment, package boundaries and village-level route information, UPEIDA's published Group-I to Group-IV alignment maps are the appropriate reference.
The Ganga Expressway road map follows a west-to-east alignment from Meerut to Prayagraj across Uttar Pradesh. It begins near NH-334 in Meerut and ends near the Prayagraj bypass on NH-19. The access-controlled six-lane road is expandable to eight lanes and forms part of Uttar Pradesh's wider expressway network through connections with other expressways and planned links.
Related Infrastructure Projects
Delhi–Varanasi High-Speed Rail
An 865 km high-speed rail corridor at 320 km/h forming the northern spine of India's Diamond Quadrilateral HSR network.
View Project →Lucknow–Kanpur Expressway
An advanced 63 km corridor (NE-6 / Awadh Expressway) slashing travel times between Lucknow and Kanpur to 45 minutes.
View Project →Varanasi–Howrah High-Speed Rail Corridor
A ~711 km high-speed rail corridor at 320 km/h forming the eastern leg of India's Diamond Quadrilateral HSR network.
View Project →Delhi Mumbai Expressway
India's massive 1,350 km greenfield expressway reducing capital-to-financial hub transit down to 12 hours.
View Project →Gorakhpur-Siliguri Expressway
A proposed 519 km greenfield expressway connecting eastern Uttar Pradesh to West Bengal.
View Project →Enjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.