CORRIDOR DOSSIER INDEX // HYDERABAD-OUTER-RING-ROAD

Hyderabad Outer Ring Road (ORR / Nehru ORR) Route Map, Toll Rates, Exit Guide & Status (2026)

Last Updated: September 2026
StatusFully Operational
Length158 km
Open SectionsAll Sections Open
CompletionFully Operational
Last UpdatedSeptember 2026
The Hyderabad Outer Ring Road (ORR), officially known as the Jawaharlal Nehru Outer Ring Road, is a fully operational 158 km, 8-lane access-controlled expressway encircling Hyderabad. Explore the Hyderabad ORR Route Map, toll rates, exit guide, speed limits and latest operational updates.

The Hyderabad Outer Ring Road (ORR), officially known as the Jawaharlal Nehru Outer Ring Road, is a fully operational 158 km, 8-lane access-controlled expressway encircling Hyderabad. Explore the Hyderabad ORR Route Map, toll rates, exit guide, speed limits and latest operational updates. This key growth corridor provides seamless connectivity around the Hyderabad metropolitan region, integrating major national highways such as NH-44, NH-65, and NH-163. The Hyderabad ORR Map has become the backbone of regional logistics, significantly easing Hyderabad Outer Ring Road Traffic.

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Total Length158 km
Estimated CostApproximately ₹6,696 crore (project construction cost)
Implementing AgencyHyderabad Metropolitan Development Authority (HMDA)
Current StatusFully Operational
Completion TargetFully Operational
Route Map

Hyderabad Outer Ring Road Route Map & Alignment

View and download the latest Hyderabad Outer Ring Road route map showing the project alignment, major junctions, districts covered and connectivity corridors.

Loading GIS Map Environment...
Project Name📍 Hyderabad Outer Ring Road
Total Length158 km
Estimated CostApproximately ₹6,696 crore (project construction cost)
Current StatusFully Operational
Project Parameters & Technical Details

Hyderabad Outer Ring Road Technical Specs & Project Parameters

ParameterTechnical Specification
Official Project NameJawaharlal Nehru Outer Ring Road (ORR)
Total Corridor Length158 km
Estimated CostApproximately ₹6,696 crore (project construction cost)
Implementing AuthorityHyderabad Metropolitan Development Authority (HMDA)
Corridor Width / RoW8-lane access-controlled expressway with service roads at selected stretches (Approximately 150 m Right of Way)
Corridor Start PointForms a continuous ring around Hyderabad
Corridor End PointContinuous loop around Hyderabad metropolitan region
Development ModelHMDA Project; currently operated under a 30-year Toll-Operate-Transfer (TOT) concession by IRB Golconda Expressway Pvt. Ltd.
Current Project StatusFully Operational
Target CompletionFully Operational

Corridor Alignment & Engineering Features

Hyderabad ORR Exit Guide

The Nehru Outer Ring Road features 19 primary interchanges designed to distribute commuter flows. Using the Hyderabad ORR Exit Guide, motorists can easily plan their entry and exit points. Refer to the list below of ORR Hyderabad Exits to navigate:

Exit No.Exit Location / Interchange Connecting Nodes
Exit 1Kokapet Interchange / Financial District Radial Link
Exit 1ANeopolis (Kokapet Radial Link Extension)
Exit 2Kollur / Edulanagulapally
Exit 3Patancheru / NH-65 (Mumbai Highway)
Exit 4Sultanpur / Industrial Corridor Radial Link
Exit 5Dundigal / Saragudem / Bowrampet vicinity
Exit 6Medchal / NH-44 North (Nagpur Highway)
Exit 7Shamirpet Interchange / Karimnagar Radial Link
Exit 8Keesara / Yadagirigutta Connector Radial Link
Exit 9Ghatkesar / NH-163 (Warangal Highway)
Exit 10Taramatipet
Exit 11Pedda Amberpet / NH-65 (Vijayawada Highway)
Exit 12Bonguluru / Nagarjuna Sagar Radial Highway
Exit 13Raviryal / Hardware Park Cluster
Exit 14Tukkuguda / Fab City Srisailam Highway
Exit 15Pedda Golconda
Exit 16Shamshabad / Rajiv Gandhi International Airport (RGIA) Gateway
Exit 17Rajendra Nagar Radial Corridor
Exit 18TSPA APPA Junction / Chevella-Bijapur Highway
Exit 19Nanakramguda / Gachibowli / IT Hub radial junction

Hyderabad ORR Toll Rates

Tolls on the Nehru Outer Ring Road are managed by the private concessionaire IRB Golconda Expressway Pvt. Ltd. under a 30-year lease concession that started in August 2023. Current toll rates are revised periodically. To ensure seamless transit, all toll plazas support mandatory FASTag ORR Hyderabad integration. A distance-based toll computation applies. Below are the basic toll rates:

Vehicle ClassBase Toll Rate per km (approx)
Car / Jeep / LMV / SUV₹2.44 per km
Light Commercial Vehicle / Minibus₹3.94 per km
Bus / 2-Axle Truck₹7.00 per km

For specific point-to-point fares, travelers can view the interactive Hyderabad ORR Toll matrix tables updated regularly on the HMDA and IRB concession portals. High-resolution maps can be accessed by downloading the Hyderabad Outer Ring Road Map PDF for local printouts.

Hyderabad ORR Speed Limit

To maintain safety standards and flow across the 8-lane corridor, speed limits are strictly enforced via speed gun cameras. The maximum permitted speed limit on the main carriage way of the Hyderabad ORR is 120 km/h for cars (LMVs) and 80 km/h for heavy vehicles. Motorists must adhere to lane discipline rules: fast lanes (extreme right lanes) are strictly reserved for overtaking at speed, and lane violations attract immediate computerized e-challans.

Key Alignment Interchanges & Nodes Covered:
📍 Gachibowli📍 Narsingi📍 Kokapet📍 Patancheru📍 Bowrampet📍 Shamirpet📍 Ghatkesar📍 Pedda Amberpet📍 Bongloor📍 Shamshabad
Timeline

Latest Hyderabad Outer Ring Road News

Verified project updates from news sources and official announcements
Video Coverage

Video Updates

Latest drone footage, progress reports, and ground coverage
Project Schedule

Project Timeline & Phased Openings

2006

Project Announcement & Work Launch

Foundation stone laid by the state government; Hyderabad Metropolitan Development Authority (HMDA) launches Phase-1 bidding.

2008

First Phase Operational

The 22 km stretch from Gachibowli to Shamshabad (Airport connectivity corridor) is inaugurated and opened to traffic.

2010

Phase 2 Segment Openings

Key stretches connecting major outer suburbs including Patancheru, Medchal, Shamirpet, Ghatkesar, Pedda Amberpet, and Shamshabad are operationalized in increments.

2012

Suburban Grid Integration

Shamirpet to Ghatkesar sections are operationalized, completing major eastern portions of the outer bypass.

2016-2018

Full ORR Operational

Final gaps and major interchanges are closed and operationalized; the full 158 km ring road is fully complete.

2023

IRB TOT Concession Award

HMDA leases tolling rights of the Outer Ring Road to IRB Infrastructure Trust for 30 years under a Toll-Operate-Transfer (TOT) contract for ₹7,380 crore.

General Inquiries

Hyderabad Outer Ring Road FAQs

Related Infrastructure Projects

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Telangana Dashboard →TS
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Never miss a project update.

Join the Infracapitalist Newsletter