Thane Coastal Road Route Map, Status & Latest Updates
The Thane Coastal Road is a proposed 13 km access-controlled road bypass running along the Thane creek, connecting Kharegaon to Gaimukh to relieve traffic congestion on Ghodbunder Road.
Mumbai Metropolitan Region's upcoming 13 km creek-edge arterial bypass, reducing transit times between Kharegaon EEH toll and Gaimukh.
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Thane Coastal Road Status & Latest Update
Initial surveying alignment validation along the creek shore is completed. Coastal Regulation Zone (CRZ) and forest clearance proposals have been submitted for formal review.
MMRDA is finalizing land acquisition bounds along key shoreline nodes at Balkum, Saket, and Kolshet to ensure zero impact on mangrove boundaries.
Thane Coastal Road Route Map & Alignment
The highway routes along the Thane creek shoreline, bypasses urban pockets of Thane, and connects Eastern Express Highway to Ghodbunder Road.
Thane Coastal Road Route Map
Advertisement // Sponsor
Thane Coastal Road Project Details
The Thane Coastal Road project is designed to resolve heavy congestion on the main Ghodbunder arterial route, separating heavy freight traffic from local passenger vehicles.
- Total proposed length: Approximately 13 km.
- Road Segment: Low-elevation seafront bridge spans and reclaimed bypass sections.
- Interchanges: High-capacity interchanges at Kharegaon and Gaimukh.
- Implementing Agency: Developed under MMRDA.
- Estimated Cost: Approximately ₹12,500 Crore.
Thane Coastal Road Key Facts
Thane Coastal Road Timeline
| Year | Event |
|---|---|
| 2020 | Project concept approved by Thane Municipal Corporation (TMC) |
| 2023 | MMRDA takes over execution and finalizes DPR corridor bounds |
| 2026 | Detailed alignment survey and CRZ clearance application processing |
| 2029 | Projected target for construction completion |
Why the Thane Coastal Road Matters
Ghodbunder Road Bypass
Provides a high-speed alternative corridor, completely bypassing the congested urban stretches of Ghodbunder Road.
Creek Shoreline Transit
Optimizes spatial transit paths along the creek, connecting industrial hubs directly to eastern and western expressways.
Reduced Travel Times
Slashes travel times between Kharegaon and Gaimukh from over 50 minutes to under 15 minutes.
Eco-Friendly Design
Incorporates elevated sections and noise barriers near mangrove zones to protect creek ecosystems.
Package Parameters
| Parameter | Details |
|---|---|
| Project Name | Thane Coastal Road |
| Proposed Length | ~13.0 km |
| Implementing Agency | MMRDA / Thane Municipal Corporation (TMC) |
| Current Phase | Under Construction |
| East Terminal | Kharegaon Toll / Bypass (EEH) |
| West Terminal | Gaimukh (Ghodbunder Road) |
| Lanes | 4 to 6 Lanes + Elevated Bypass Segments |
| Estimated Completion | 2029 (Projected) |
| Connection East | Eastern Express Highway (EEH) |
| Connection West | Ghodbunder Road / Gaimukh Bridge |
Thane Coastal Road FAQ
Enjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.