METRO CORRIDOR DOSSIER // AGRA-METRO-LINE-1

Agra Metro Line 1 (Yellow Line) Route Map, Stations & Status

Operational📏 6.0 km🚉 6 Operational Stations Stations🗓 6 March 2024 — Taj East Gate–Mankameshwar Mandir priority section🏢 Uttar Pradesh Metro Rail Corporation Limited (UPMRC)

Agra Metro Line 1 (Yellow Line) is a 13.7 km corridor connecting Taj East Gate to Sikandra with 13 stations (6 elevated and 7 underground). Implemented by Uttar Pradesh Metro Rail Corporation Limited (UPMRC), the 6 km Taj East Gate–Mankameshwar Mandir priority section has been operational since 6 March 2024; the remaining underground and elevated section toward Sikandra is under active construction.

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Agra Metro Line 1 (Yellow Line) Economics

Agra Metro Line 1 (Yellow Line) Economics

Total Investment₹8,379.62 crore (Approved Phase 1 Cost)
Primary Backers50:50 Joint Venture of Government of India and Government of Uttar Pradesh (Equity) + European Investment Bank (EIB) Loan Financing
Operator / ModelUttar Pradesh Metro Rail Corporation Limited (UPMRC)
Station list

Agra Metro Line 1 (Yellow Line) Stations

#StationTypeInterchange / ConnectionOpened
01
Taj East Gate
ElevatedTourist Area Access6 March 2024
02
Shaheed Captain Shubham Gupta
ElevatedFatehabad Road6 March 2024
03
Fatehabad Road
Elevated6 March 2024
04
Taj Mahal
UndergroundTourist Access6 March 2024
05
Agra Fort
UndergroundAgra Fort Railway Station6 March 2024
06
Mankameshwar Mandir
UndergroundJama Masjid Area6 March 2024
Geospatial Alignment

Agra Metro Line 1 (Yellow Line) Route Map

Loading GIS Map Environment...
Specs sheet

Agra Metro Line 1 (Yellow Line) Technical Specifications

ParameterValue
Corridor StatusOperational
Line NumberLine 1 (Yellow Line)
Total Length6.0 km
Stations Count6 Operational Stations
Corridor TypeElevated & Underground
OperatorUttar Pradesh Metro Rail Corporation Limited (UPMRC)
Opened / Est. Opening6 March 2024 — Taj East Gate–Mankameshwar Mandir priority section
Maximum Design Speed80 km/h
Track GaugeStandard Gauge (1435 mm)
Electrification System750V DC Third Rail
Primary DepotPAC Depot (Fatehabad Road)
Chronological Milestones

Agra Metro Line 1 (Yellow Line) Timeline

2019

Union Cabinet approved Agra Metro Phase 1 (29.4 km, 27 stations, ₹8,379.62 crore)

December 2020

Construction work commenced for Agra Metro Phase 1

6 March 2024

Taj East Gate–Mankameshwar Mandir 6 km priority section inaugurated and passenger services commenced

Geospatial Explorer

Agra Metro Line 1 (Yellow Line) Alignment Map & GIS Explorer

Elevated / Underground6 Operational Stations (3 Elevated, 3 Underground)
Primary DepotPAC Depot (Fatehabad Road)
Answers

Frequently Asked Questions

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

Project milestones
Government approvals
Construction progress
New project launches
Found incorrect data?
Never miss a project update.

Join the Infracapitalist Newsletter