METRO CORRIDOR DOSSIER // KOLKATA-METRO-PURPLE-LINE-OPERATIONAL

Kolkata Metro Line 3 (Purple Line — Operational Route: Joka ↔ Majerhat)

Operational📏 7.75 km Operational Route (Joka to Majerhat)🚉 7 Operational Elevated Stations Stations🗓 30 Dec 2022🏢 Metro Railway, Kolkata (Owner: Indian Railways / RVNL)

Kolkata Metro Line 3 (Purple Line - Operational Segment) spans 7.75 km across 7 elevated stations connecting Joka in South 24 Parganas to Majerhat along Diamond Harbour Road. The corridor serves as the primary mass transit lifeline for Behala, Thakurpukur, and South Kolkata suburbs, providing direct rail interchange with Eastern Railway suburban and Circular Railway trains at Majerhat.

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Kolkata Metro Purple Line Economics

Kolkata Metro Purple Line Economics

Total InvestmentSanctioned Corridor Cost ₹2,619.02 Cr
Primary BackersMinistry of Railways (Government of India)
Operator / ModelMetro Railway, Kolkata (Owner: Indian Railways / RVNL)
Target Opening

Expected Completion Date

StatusOperational
Target Opening Date30 Dec 2022 (Joka – Taratala) | 06 Mar 2024 (Taratala – Majerhat)
Station list

Kolkata Metro Purple Line Stations

#StationTypeInterchange / ConnectionOpened
01
Joka
Elevated TerminalJoka Depot Link & Diamond Harbour Road Axis30 Dec 2022
02
Thakurpukur
ElevatedSouth 24 Parganas Feeder Axis30 Dec 2022
03
Sakher Bazar
ElevatedBehala South Commercial Hub30 Dec 2022
04
Behala Chowrasta
ElevatedCentral Behala Transit Node30 Dec 2022
05
Behala Bazar
ElevatedBehala Market & Retail Corridor30 Dec 2022
06
Taratala
ElevatedIndustrial Precinct & Mint Node30 Dec 2022
07
Majerhat
Elevated TerminalMajerhat Railway Station (Suburban & Circular Rail)06 Mar 2024
Geospatial Alignment

Joka ↔ Majerhat Geospatial Alignment Map

Loading GIS Map Environment...
Specs sheet

Kolkata Metro Purple Line Technical Specifications

ParameterValue
Corridor StatusOperational
Line NumberLine 3 (Purple Line)
Total Length7.75 km Operational Route (Joka to Majerhat)
Stations Count7 Operational Elevated Stations
Corridor TypeElevated Viaduct Corridor
OperatorMetro Railway, Kolkata (Owner: Indian Railways / RVNL)
Opened / Est. Opening30 Dec 2022 (Joka – Taratala) | 06 Mar 2024 (Taratala – Majerhat)
Maximum Design Speed80 km/h
Track GaugeBroad Gauge (1,676 mm / 5 ft 6 in)
Electrification System750V DC Third Rail
Primary DepotJoka Metro Depot (South 24 Parganas)
Chronological Milestones

Kolkata Metro Purple Line Timeline

2010-11

Joka to B.B.D. Bagh corridor sanctioned by Ministry of Railways at ₹2,619.02 Cr.

February 2019

RVNL commenced land development and boundary wall construction for Joka Metro Depot.

15 September 2022

Electrification completed and trial runs commenced between Joka and Taratala.

30 December 2022

Phase 1 (Joka to Taratala, 6.50 km, 6 stations) inaugurated by Prime Minister Narendra Modi.

06 March 2024

Taratala to Majerhat section (1.25 km) inaugurated by PM Narendra Modi, connecting Majerhat Station.

22 November 2025

Saturday commercial operations introduced with 40 daily services between Joka and Majerhat.

Proprietary analytics

Purple Line Transit Impact & Suburban Connectivity

Economic Significance

Provides high-capacity mass transit along Diamond Harbour Road, relieving dense traffic bottlenecks across Behala and Thakurpukur.

Traffic Impact

Cuts commuting time from Joka to Majerhat from over 45 minutes by road to under 15 minutes by metro.

Employment Centres Served

Serves suburban residential commuters traveling to Central Business Districts via Majerhat railway interchange.

Intermodal Connectivity

Direct seamless modal interchange with Majerhat Suburban Railway Station and Kolkata Circular Railway.

Impact on Real Estate

Boosted residential real estate developments and commercial hub values along the Diamond Harbour Road corridor.

Geospatial Explorer

Kolkata Metro Purple Line Alignment Map & GIS Explorer

Elevated Viaduct Corridor7.75 km Elevated Viaduct (7 Stations)
Viaduct Length7.75 km Viaduct (7 Elevated Stations)
Tunnel LengthN/A (Underground section is under construction)
River CrossingsChetla Canal Crossing at Majerhat
Major Bridges / CrossingsMajerhat Railway Overbridge (ROB) Alignment
Primary DepotJoka Metro Depot (South 24 Parganas)
Answers

Frequently Asked Questions

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

Project milestones
Government approvals
Construction progress
New project launches
Found incorrect data?
Never miss a project update.

Join the Infracapitalist Newsletter