Kolkata Metro Network: Route Map, Lines, Stations & Latest Updates (2026) (কলকাতা মেট্রো রেল)
Last Updated: 2026
Kolkata Metro is India's pioneer rapid-transit network, connecting Dakshineswar, Howrah, Sealdah, Salt Lake Sector V, Rajarhat New Town, Joka, and Kolkata NSCBI International Airport. Featuring India's first underwater transportation tunnel beneath the Hooghly River, this guide covers operational, under-construction, approved and proposed metro lines, including route maps, stations, network expansion and latest project updates.
Kolkata Metro Expansion & Master Plan Projects
As India's pioneer rapid-transit network inaugurated in 1984, Kolkata Metro Rail is executing a 139.28 km combined grid across 6 major Kolkata Metro corridors (benchmarked against the official 122.9 km master-plan figure). Operated by Metro Railway Kolkata (a zone of Indian Railways) alongside Kolkata Metro Rail Corporation Limited (KMRCL) and RVNL, the network features landmark civil engineering breakthroughs including India's first underwater transportation tunnel 13m below the Hooghly River bed:
Line 1 (Blue Line): Dakshineswar ↔ Kavi Subhash (31.365 km)
India's pioneer Kolkata Metro Line, spanning 31.365 km across 26 stations along Kolkata's central north-south transit spine (15.70 km underground). Services currently operate between Dakshineswar and Shahid Khudiram, with the Kavi Subhash Blue Line terminal closed since July 2025 for structural repairs.
Line 2 (Green Line / East-West): Salt Lake Sector V ↔ Howrah Maidan (16.55 km)
A 16.55 km fully operational corridor across 12 stations between Salt Lake Sector V and Howrah Maidan, featuring approximately 520 m of twin tunnels beneath the Hooghly River—India's first underwater metro crossing.
Line 3 (Purple Line): Joka ↔ Esplanade (15.2 km)
A 15.2 km planned corridor across 12 Kolkata Metro Stations serving South-West Kolkata. The 7.7 km elevated section from Joka to Majerhat (7 stations) is operational; the ~7.5 km underground extension from Majerhat to Esplanade is under construction.
Line 4 (Yellow Line / Airport Metro Kolkata): Noapara ↔ Barasat (18.0 km)
An 18.0 km official corridor across 10 stations. The 6.77 km Noapara to Jai Hind Airport section (4 stations) is commissioned, Jai Hind to Michael Nagar (2 stations) is under construction, and New Barrackpore to Barasat (4 stations) civil work is held up.
Line 5 (Pink Line): Baranagar ↔ Barrackpore (12.50 km)
A sanctioned 12.50 km broad gauge corridor across 11 planned stations connecting Baranagar to Barrackpore along BT Road. The line remains planned with construction yet to commence; a ₹1,587.3 Cr tender has been floated for the 12.3 km 10-station section (Baranagar station excluded).
Line 6 (Orange Line): Kavi Subhash ↔ Airport via New Town (29.87 km)
A 29.87 km eastern circumferential corridor across 24 planned stations. The 9.9 km operational section runs between Kavi Subhash and Beleghata (9 stations); 19.97 km from Beleghata to Jai Hind Bimanbandar Airport is under construction.
Kolkata Metro Network Route Map & Network Map
Kolkata Metro Lines & Stations
Kolkata Metro Corridors
6 Listed Corridors| Line | Status | Full Length (Operational) | Planned Stations | Details |
|---|---|---|---|---|
Line 1 Blue Line (Operational) Dakshineswar ↔ Kavi Subhash | Operational | 32.13 km | 26 Stations | View Corridor Details→ |
Line 2 Green Line (Operational) Howrah Maidan ↔ Salt Lake Sector V | Operational | 16.60 km | 12 Stations | View Corridor Details→ |
Line 3 Purple Line (Operational) Joka ↔ Majerhat | Operational | 7.75 km | 7 Stations | View Corridor Details→ |
Line 4 Yellow Line (Operational) Noapara ↔ Jai Hind Airport | Operational | 7.04 km (6.77 km Commissioned) | 4 Stations | View Corridor Details→ |
Line 6 Orange Line (Operational) Kavi Subhash ↔ Beleghata | Operational | 9.90 km | 9 Stations | View Corridor Details→ |
Line 3 Purple Line (Under Construction) Majerhat ↔ Esplanade | Under Construction | 6.50 km | 5 Stations | View Corridor Details→ |
Line 4 Yellow Line (Under Construction) Jai Hind Airport ↔ Michael Nagar | Under Construction | 2.06 km | 2 Stations | View Corridor Details→ |
Line 6 Orange Line (Under Construction) Beleghata ↔ Jai Hind Airport | Under Construction | 19.97 km | 15 Stations | View Corridor Details→ |
Line 2 Green Line (Extension Approved) Salt Lake Sector V ↔ Teghoria | Approved Extension | 6.65 km | 5 Stations | View Corridor Details→ |
Line 3 Purple Line (Extensions Approved) Eden Gardens (North) & IIM-Joka (South) ↔ Diamond Park | Approved Extension | 4.99 km | 3 Stations | View Corridor Details→ |
Line 4 Yellow Line (Extension Approved) Michael Nagar ↔ Suripukur / Barasat | Approved Extension (Held Up) | 7.60 km | 4 Stations | View Corridor Details→ |
Line 5 Pink Line (Planned / Sanctioned) Baranagar ↔ Barrackpore | Planned / Tender Floated | 12.50 km | 11 Stations | View Corridor Details→ |
Line 3 Purple Line (Proposed Branch) Mahanayak Uttam Kumar (Tollygunge) ↔ Diamond Park | Proposed Branch | 8.50 km | 4 Stations | View Corridor Details→ |
Line 2 Green Line (Proposed Extension) Howrah Maidan ↔ Santragachi Bus & Rail Terminal | Proposed Extension | 9.10 km | 8 Stations | View Corridor Details→ |
Kolkata Metro Network Statistics
Kolkata Metro Network Timeline
Project Sanction & Foundation
Foundation stone laid by Prime Minister Indira Gandhi for India's pioneer underground rapid transit system in Kolkata.
India's First Metro Opens
Commercial operations launched on Line 1 (Blue Line) between Esplanade and Bhowanipore (Netaji Bhavan), establishing India's first operational metro railway.
Blue Line North-South Extensions
Line 1 extended south to Kavi Subhash (New Garia) in 2010 and north to Dakshineswar in February 2021 (31.365 km total across 26 stations).
Green Line East-West Phased Openings
Line 2 Green Line opened from Salt Lake Sector V to Salt Lake Stadium (Feb 2020), Phoolbagan (Oct 2020), and Sealdah Station (July 2022).
Purple Line Phase 1 Opening
Line 3 Purple Line inaugurated between Joka and Taratala (6.5 km) serving south-west Kolkata.
Historic Underwater River Tunnel Launch
PM Narendra Modi inaugurated India's first underwater metro tunnel (520m) 13m below the Hooghly riverbed on Line 2 Green Line (Howrah Maidan–Esplanade section) and Orange Line Phase 1 (Kavi Subhash–Hemanta Mukhopadhyay 5.4 km).
Yellow Line CRS Approval & Network Expansion
Line 4 Yellow Line (Noapara to Jai Hind Airport 6.77 km commissioned), Orange Line expanded to Beleghata (9.9 km operational), and Line 5 Pink Line 2026 tender floated for ₹1,587.3 crore covering 10 elevated stations and viaduct over 12.3 km (construction not yet commenced).
Connectivity
Airport Metro Kolkata
NSCBI Airport directly connected via Line 4 Yellow Line (Noapara ↔ Jai Hind Airport 6.77 km commissioned) and Line 6 Orange Line underground terminal complex.
Nearby Railway Stations
Multi-modal integration with Eastern Railway & South Eastern Railway terminals: Howrah Station (Line 2 Green Line), Sealdah Station (Line 2 Green Line), Dum Dum Station (Line 1 Blue Line), and Majerhat Station (Line 3 Purple Line).
Nearby Bus Terminals
Seamless transfers to Esplanade Bus Terminal, Karunamoyee International Bus Terminal, and Howrah Bus Terminus.
IT & Financial Districts
Provides high-frequency transit across Salt Lake Sector V IT Hub, Rajarhat New Town Smart City, and BBD Bagh Central Business District.
Why Kolkata Metro Rail Matters
Inter-City River Crossing Breakthrough
The Hooghly River underwater twin tunnels eliminate severe traffic bottlenecks across Rabindra Setu (Howrah Bridge) and Vidyasagar Setu, cutting travel time between Howrah and Esplanade to under 5 minutes.
Multi-Modal Intermodal Connectivity
Interconnects Eastern Railway, South Eastern Railway, interstate bus terminals, and international air traffic at Kolkata Jai Hind Bimanbandar Metro Station.
Suburban Economic Integration
Accelerates commercial and residential township expansion across Rajarhat New Town, Salt Lake Sector V, Joka, and Barasat.