Kolkata Metro Line 4 (Yellow Line — Approved Extension: Michael Nagar ↔ Suripukur / Barasat)

Approved Extension (Held Up)📏 7.60 km Approved Extension Route🚉 4 Sanctioned Underground Stations Stations🏢 Metro Railway, Kolkata (Owner: Indian Railways / RVNL)

Kolkata Metro Line 4 (Yellow Line - Approved Extension Segment) is a sanctioned 7.60 km underground extension across 4 stations (New Barrackpore, Madhyamgram, Hridaypur, and Barasat / Suripukur). Extending from Michael Nagar to Barasat Junction, civil construction on this stretch has been held up pending NOC clearances and underground TBM alignment modifications.

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Kolkata Metro Yellow Line Economics

Kolkata Metro Yellow Line Economics

Total InvestmentSanctioned Underground Modification Budget Share ~₹1,615+ Cr
Primary BackersMinistry of Railways (Government of India)
Operator / ModelMetro Railway, Kolkata (Owner: Indian Railways / RVNL)
Target Opening

Expected Completion Date

StatusApproved Extension (Held Up)
Target Opening Date
Station list

Kolkata Metro Yellow Line Stations

#StationTypeInterchange / ConnectionOpened
01
Michael Nagar
Underground Operational Shaft NodeUnder-construction Yellow Line Terminal ShaftTarget 2027
02
New Barrackpore
Underground (Approved)New Barrackpore Town Node
03
Madhyamgram
Underground (Approved)Madhyamgram Junction Railway Station
04
Hridaypur
Underground (Approved)Hridaypur Suburb Node
05
Barasat (Suripukur)
Underground Approved TerminalBarasat Junction Railway Station Interchange
Geospatial Alignment

Michael Nagar ↔ Barasat / Suripukur Approved Extension Alignment Map

Loading GIS Map Environment...
Specs sheet

Kolkata Metro Yellow Line Technical Specifications

ParameterValue
Corridor StatusApproved Extension (Held Up)
Line NumberLine 4 (Yellow Line Extension)
Total Length7.60 km Approved Extension Route
Stations Count4 Sanctioned Underground Stations
Corridor TypeUnderground Cut-and-Cover & TBM Tunneling Drive
OperatorMetro Railway, Kolkata (Owner: Indian Railways / RVNL)
Opened / Est. OpeningTBD
Maximum Design Speed80 km/h
Track GaugeBroad Gauge (1,676 mm / 5 ft 6 in)
Electrification System750V DC Third Rail
Primary DepotNoapara Metro Depot
Chronological Milestones

Kolkata Metro Yellow Line Timeline

Sanctioned

Noapara to Barasat Line 4 corridor sanctioned by Ministry of Railways.

February 2021

Prime Minister Narendra Modi approved converting New Barrackpore to Barasat section underground to prevent surface evictions.

August 2025

TBM underground alignment plan proposed extending total line beyond Barasat to Suripukur.

Proprietary analytics

Yellow Line Barasat Extension & North 24 Parganas Connectivity Impact

Economic Significance

Will provide a direct metro link connecting North 24 Parganas district headquarters at Barasat to NSCBI Airport and Central Kolkata.

Traffic Impact

Expected to relieve severe traffic congestion on Jessore Road (NH-12) connecting Barasat and Madhyamgram.

Employment Centres Served

Serves suburban daily commuters traveling from Barasat, Madhyamgram, and New Barrackpore to Kolkata Airport.

Intermodal Connectivity

Provides dual suburban rail interchanges at Madhyamgram Junction and Barasat Junction.

Impact on Real Estate

Boosted suburban residential development and land values in Madhyamgram and Barasat.

Geospatial Explorer

Kolkata Metro Yellow Line Alignment Map & GIS Explorer

Corridor Type Breakdown7.60 km Underground Tunnels (4 Stations)
Viaduct LengthN/A (Converted to Underground Tunnels)
Tunnel Length7.60 km Underground Cut-and-Cover / TBM Tunnels
River CrossingsN/A
Major Bridges / CrossingsN/A
Primary DepotNoapara Metro Depot
Answers

Frequently Asked Questions

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

Project milestones
Government approvals
Construction progress
New project launches
Found incorrect data?
Never miss a project update.

Join the Infracapitalist Newsletter