METRO CORRIDOR DOSSIER // KOLKATA-METRO-YELLOW-LINE-OPERATIONAL

Kolkata Metro Line 4 (Yellow Line — Operational Route: Noapara ↔ Jai Hind Airport)

Operational📏 7.04 km Operational Route (6.77 km Commissioned Main-Line)🚉 4 Operational Stations (Noapara, Dum Dum Cantonment, Jessore Road, Jai Hind) Stations🗓 22 Aug 2025🏢 Metro Railway, Kolkata (Owner: Indian Railways / RVNL)

Kolkata Metro Line 4 (Yellow Line - Operational Segment) spans 7.04 km (6.77 km commissioned commercial route) across 4 operational stations connecting Noapara terminal hub to Netaji Subhas Chandra Bose International Airport (Jai Hind). The corridor provides seamless mass transit linking the Line 1 Blue Line at Noapara and Eastern Railway suburban trains at Dum Dum Cantonment directly into the Kolkata Airport terminal building.

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Kolkata Metro Yellow Line Economics

Kolkata Metro Yellow Line Economics

Total InvestmentCommissioned Phase Cost ~₹3,750 Cr
Primary BackersMinistry of Railways (Government of India)
Operator / ModelMetro Railway, Kolkata (Owner: Indian Railways / RVNL)
Target Opening

Expected Completion Date

StatusOperational
Target Opening Date22 Aug 2025 (Inaugurated) | 25 Aug 2025 (Commercial Revenue Service)
Station list

Kolkata Metro Yellow Line Stations

#StationTypeInterchange / ConnectionOpened
01
Noapara
Elevated Terminal HubLine 1 Blue Line Interchange & Noapara Depot25 August 2025
02
Dum Dum Cantonment
ElevatedEastern Railway Suburban Rail Interchange25 August 2025
03
Jessore Road
At-GradeJessore Road Highway Axis Node25 August 2025
04
Jai Hind
Underground Terminal HubNSCBI Airport Terminal & Line 6 Orange Line Interchange25 August 2025
Geospatial Alignment

Noapara ↔ Jai Hind Airport Geospatial Alignment Map

Loading GIS Map Environment...
Specs sheet

Kolkata Metro Yellow Line Technical Specifications

ParameterValue
Corridor StatusOperational
Line NumberLine 4 (Yellow Line)
Total Length7.04 km Operational Route (6.77 km Commissioned Main-Line)
Stations Count4 Operational Stations (Noapara, Dum Dum Cantonment, Jessore Road, Jai Hind)
Corridor TypeElevated, At-Grade & Underground Airport Subterranean Terminal
OperatorMetro Railway, Kolkata (Owner: Indian Railways / RVNL)
Opened / Est. Opening22 Aug 2025 (Inaugurated) | 25 Aug 2025 (Commercial Revenue Service)
Maximum Design Speed80 km/h
Track GaugeBroad Gauge (1,676 mm / 5 ft 6 in)
Electrification System750V DC Third Rail
Primary DepotNoapara Metro Depot
Chronological Milestones

Kolkata Metro Yellow Line Timeline

2010-11

Noapara to Barasat Line 4 corridor sanctioned by Ministry of Railways.

June 2011

Senbo Engineering awarded ₹227 Cr civil contract for Airport section and Bagjola Canal alignment.

June 2019

Railway Board sanctioned material modification converting Airport–Barasat alignment underground.

2020

Subterranean integrated airport station construction commenced 150m from terminal building.

22 August 2025

Noapara to Jai Hind (Biman Bandar) section inaugurated by Prime Minister Narendra Modi.

25 August 2025

Commercial revenue services commenced from Noapara to Jai Hind Airport.

Proprietary analytics

Yellow Line Airport Transit & Regional Connectivity Impact

Economic Significance

Provides Kolkata's first direct rail-to-airport mass transit link, connecting NSCBI Airport directly to North-South Kolkata.

Traffic Impact

Eliminates highway bottlenecks along VIP Road and Jessore Road, reducing travel time to the airport from 60 mins to 14 mins.

Employment Centres Served

Serves airline personnel, airport logistics staff, cargo workers, and IT professionals.

Intermodal Connectivity

Seamless interchange with Line 1 Blue Line at Noapara and future Line 6 Orange Line at Jai Hind Airport.

Impact on Real Estate

Sparked commercial transit-oriented development (TOD) interest across Dum Dum Cantonment and Jessore Road.

Geospatial Explorer

Kolkata Metro Yellow Line Alignment Map & GIS Explorer

Corridor Type Breakdown7.04 km (Elevated, At-Grade & Underground Airport Subterranean Station)
Viaduct Length4.80 km Viaduct (Noapara & Dum Dum Cantonment)
Tunnel Length2.24 km At-grade & Underground Ramp to Airport Terminal
River CrossingsBagjola Canal Viaduct Bridge
Major Bridges / CrossingsEastern Railway Mainline Railway Overbridge
Primary DepotNoapara Metro Depot
Answers

Frequently Asked Questions

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

Project milestones
Government approvals
Construction progress
New project launches
Found incorrect data?
Never miss a project update.

Join the Infracapitalist Newsletter