Hadapsar-Yewat Elevated Highway Route Map, Cost & Latest Update (2026)

Last Updated: September 2026
StatusApproved / Pre-construction
Length31.5 km | 6-lane elevated road + 6-lane at-grade road
Open SectionsPre-construction Stage
CompletionCompletion date not officially confirmed
Last UpdatedSeptember 2026
The Hadapsar to Yewat Elevated Highway is a 31.5 km corridor along NH-65 in Pune district featuring a 6-lane elevated road and parallel 6-lane at-grade road, with a ₹5,262 crore sanctioned cost (older MSIDC project page listed ₹4,258 crore), managed under MSIDC / Government of Maharashtra.

The Hadapsar to Yewat Elevated Highway is a major capacity enhancement infrastructure corridor along the Pune–Solapur Highway (NH-65) in Pune district, Maharashtra. Spanning a total length of 31.5 km with a proposed 30-meter right of way (ROW), the project features a 6-lane elevated road + parallel 6-lane at-grade road configuration with a sanctioned project cost of ₹5,262 crore (while the official MSIDC project page cited an earlier estimate of ₹4,258 crore), managed under the Maharashtra State Infrastructure Development Corporation (MSIDC) / Government of Maharashtra.

Designed to support rising traffic volumes along eastern Pune's congested freight axis—which currently handles an intense traffic volume of 54,817 PCU/day (Passenger Car Units per day)—the project has received cabinet approval with DPR preparation and pre-construction land acquisition underway. The project requires 47.25 hectares of land acquisition, while the final completion date remains to be officially confirmed.

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Total Length31.5 km | 6-lane elevated road + 6-lane at-grade road
Estimated Cost₹5,262 Crore (Sanctioned Cost; ₹4,258 Crore original MSIDC estimate)
Implementing AgencyMSIDC / Government of Maharashtra
Current StatusApproved / Pre-construction
Completion TargetCompletion date not officially confirmed
Route Map

Hadapsar to Yewat Elevated Highway Route Map & Alignment

View and download the latest Hadapsar to Yewat Elevated Highway route map showing the project alignment, major junctions, districts covered and connectivity corridors.

Loading GIS Map Environment...
Project Name📍 Hadapsar to Yewat Elevated Highway
Total Length31.5 km | 6-lane elevated road + 6-lane at-grade road
Estimated Cost₹5,262 Crore (Sanctioned Cost; ₹4,258 Crore original MSIDC estimate)
Current StatusApproved / Pre-construction
Project Parameters & Technical Details

Hadapsar to Yewat Elevated Highway Technical Specs & Project Parameters

ParameterTechnical Specification
Official Project NameHadapsar-Yewat Elevated Highway Route Map, Cost & Latest Update (2026)
Total Corridor Length31.5 km | 6-lane elevated road + 6-lane at-grade road
Estimated Cost₹5,262 Crore (Sanctioned Cost; ₹4,258 Crore original MSIDC estimate)
Implementing AuthorityMSIDC / Government of Maharashtra
Corridor Width / RoW30 metres (6-lane elevated road + 6-lane at-grade road; 47.25 ha land acquisition)
Corridor Start PointHadapsar, Pune
Corridor End PointYewat, Daund
Development ModelBOT (Toll)
Current Project StatusApproved / Pre-construction
Target CompletionCompletion date not officially confirmed

Corridor Alignment & Engineering Features

Project Alignment & Configuration Breakdown

The Hadapsar to Yewat corridor along the Pune–Solapur Highway (NH-65) experiences severe industrial and commuter congestion, with daily traffic load reaching 54,817 Passenger Car Units (PCU). The approved project upgrades the 31.5 km corridor into a 6-lane elevated road and parallel 6-lane at-grade road system to segregate high-speed regional freight traffic.

Cabinet Sanction & DPR Status

The project received Maharashtra Cabinet approval at a sanctioned cost of ₹5,262 crore (noting the official MSIDC portal lists an earlier project estimate of ₹4,258 crore with a Draft DPR). Implementation is progressing under MSIDC with DPR preparation and pre-construction processing active. The completion date is not officially confirmed.

Land Acquisition & ROW Specifications

As specified on the MSIDC project portal, the scheme requires 47.25 hectares of land acquisition to maintain a uniform Right of Way (ROW) of 30 meters along the 31.5 km route.

Key Alignment Interchanges & Nodes Covered:
📍 Hadapsar (Pune)📍 Loni Kalbhor📍 Theur Phata📍 Uruli Kanchan📍 Yewat (Daund)
Timeline

Latest Developments

Verified project updates from news sources and official announcements
Video Coverage

Video Updates

Latest drone footage, progress reports, and ground coverage
Project Schedule

Latest Project Updates & Timeline

2024

Cabinet Approval & Sanction

Government of Maharashtra sanctioned ₹5,262 crore for the 31.5 km NH-65 capacity expansion.

Early 2026

Montecarlo Ltd Emerged as L1 Bidder

Montecarlo Ltd emerged as L1 bidder at ₹6,426.22 crore for the 6-lane elevated + 6-lane at-grade construction.

18 July 2026

Foundation Stone / Project Launch

Foundation stone laid on 18 July 2026 for the 31.5 km NH-65 Hadapsar–Yewat elevated corridor.

4 Years Target

Implementation Target Window

Target: within 4 years of commencement/work order for the 31.5 km elevated corridor.

General Inquiries

Hadapsar to Yewat Elevated Highway FAQs

Related Infrastructure Projects

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Maharashtra Dashboard →MH
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
RELATED
Never miss a project update.

Join the Infracapitalist Newsletter