Home/Infrastructure Projects/Kasarvadavali to Kharbav Alignment R1

Kasarvadavali to Kharbav Alignment R1 Route Map & Status

A proposed ~10 km transit corridor bridging Kasarvadavali (Thane) and Kharbav (Bhiwandi) across the Ulhas River. A major link for industrial logistics and suburban passenger bypasses.

Project Status: DPR & Feasibility Alignment PhaseThe Alignment R1 option is being analyzed for creek bridge spans. Environmental studies and wetlands impact assessments are ongoing.
Proposed LengthEstimated ~10 km
Proposed CostTBD
Proposed Lanes6 Lanes
AgencyMMRDA
Proposed StatusDPR Stage

Kasarvadavali to Kharbav Alignment R1 Latest Update

MMRDA is finalizing the Detailed Project Report for the alignment. Geotechnical investigations for the Ulhas River bridge piers are being organized to determine the rock stratum depth.

Local coordination committees are reviewing the land requirements near the Kasarvadavali landing point. Clearance requests for coastal zone regulations (CRZ) are expected to be compiled shortly.

Kasarvadavali to Kharbav Alignment R1 Route Map & Alignment

The proposed road alignment begins near Kasarvadavali on Ghodbunder Road (Thane West), heads northward, crosses the Ulhas River/Creek, and connects to the Kharbav corridor in Bhiwandi.

Proposed Route Alignment
Kasarvadavali, ThaneSouth Terminal
Ulhas River Creek BridgeCreek Crossing
Kharbav, BhiwandiNorth Terminal
GIS Route alignment

Kasarvadavali to Kharbav Alignment R1 Route Map

Loading GIS Map Environment...

Advertisement // Sponsor

Loading sponsor...
Dossier Overview

Kasarvadavali to Kharbav Alignment R1 Key Facts

Proposed LengthEstimated ~10 km
Estimated CostTBD
Proposed Lanes6 Lanes
Proposed South EndKasarvadavali (Thane)
Proposed North EndKharbav (Bhiwandi)
Proposed StatusDPR Stage
Historical Dossier

Kasarvadavali to Kharbav Alignment R1 Timeline

YearEvent
2023MMRDA approves proposal for Thane-Bhiwandi direct corridor options
2025Alignment option R1 selected for detailed engineering assessment
2026DPR and geotechnical investigations ongoing for creek crossing
Strategic Significance

Why Kasarvadavali to Kharbav Alignment R1 Matters

Proposed Thane–Bhiwandi Link

The proposed corridor bypasses congested city roads, saving commuters and logistics trucks significant travel time.

Proposed Connect to Kharbav Hub

Designed to provide direct arterial roadway access to Bhiwandi's massive warehouse and logistics parks.

Slashes Transit Times

Projected to cut travel times from Kasarvadavali to Kharbav from an estimated 45 minutes down to under 15 minutes.

Spurs Local Development

Projected to unlock residential and commercial potential along the Ulhas River northern banks.

Project Parameters

Kasarvadavali to Kharbav Alignment R1 Status & Specifications

ParameterDetails
Project NameKasarvadavali to Kharbav Alignment R1
Proposed LengthEstimated ~10 km
Implementing AgencyMMRDA
Proposed PhaseDPR & Feasibility Stage
Proposed South TerminalKasarvadavali, Thane
Proposed North TerminalKharbav, Bhiwandi
Water Body CrossedUlhas River / Creek (Proposed)
Estimated CompletionEarly 2030s (projected)
Connection SouthGhodbunder Road / Thane Metro Line 4
Connection NorthVirar–Alibaug Multimodal Corridor
Last updated: June 2026 · Source: MMRDA planning division← Back to Directory

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Maharashtra Dashboard →MH
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Never miss a project update.

Join the Infracapitalist Newsletter