CORRIDOR DOSSIER INDEX // PUNE-SAMBHAJI-NAGAR-EXPRESSWAY

Pune–Sambhajinagar Expressway: The 3-Phase MSIDC Corridor — Shirur–Sambhajinagar Greenfield & Pune–Shirur Greenfield

The Pune–Sambhajinagar Expressway, also widely known as the Pune Aurangabad Expressway, is a proposed high-speed corridor connecting Pune, Ahilyanagar and Chhatrapati Sambhajinagar. Developed as a multi-phase corridor by MSIDC, Phase 1, the Pune–Shirur Elevated Corridor, has been awarded and is currently in mobilisation and pre-construction planning. Phase 2 proposes a new greenfield expressway between Shirur and Chhatrapati Sambhajinagar, while Phase 3 is a long-term Pune–Shirur greenfield expansion intended to support future traffic growth. The overall corridor aims to reduce travel times between Pune and Chhatrapati Sambhajinagar and strengthen connectivity with the Samruddhi Mahamarg and industrial zones across Maharashtra.

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
How the Corridor Works
1Phase 1

Pune → Shirur

Elevated Corridor

Contract Awarded
2Phase 2

Shirur → Ch. Sambhajinagar

Greenfield Expressway

DPR Stage
3Phase 3

Pune → Shirur

Future Greenfield Expansion

Concept Stage
Phase 1 — Contract Awarded / MobilisationPhase 2 — Proposed / DPR StagePhase 3 — Concept Stage
Corridor Route (Pune → Sambhajinagar)
PUNE
Phase 1

Pune–Shirur Elevated Corridor

~53 km

→ Dedicated tracking page
SHIRUR
Phase 2

Shirur–Ch. Sambhajinagar Greenfield Expressway

Length Under Finalisation

SAMBHAJINAGAR
Phase 3 — Parallel

Pune–Shirur Greenfield Expressway (Subject to future government approvals and DPR finalisation)

Pune → Shirur (parallel greenfield to Ph.1)

Travel Time Target~3hPune → Sambhajinagar
Corridor Length~246 kmApproximate length based on current planning documents
Total Cost₹30,000+Crore

पुणे–संभाजीनगर एक्सप्रेसवे (Pune Sambhajinagar Expressway)

पुणे–संभाजीनगर एक्सप्रेसवे, ज्याला पुणे–औरंगाबाद एक्सप्रेसवे असेही म्हटले जाते, हा MSIDC (महाराष्ट्र राज्य पायाभूत सुविधा विकास महामंडळ) द्वारे तीन टप्प्यांत विकसित होणारा कॉरिडोर आहे. टप्पा 1: पुणे–शिरूर एलिव्हेटेड कॉरिडोर (Welspun Enterprises यांना करार प्रदान करण्यात आला आहे). टप्पा 2: शिरूर–छत्रपती संभाजीनगर ग्रीनफील्ड. टप्पा 3: पुणे–शिरूर ग्रीनफील्ड (भविष्यातील समांतर मार्ग).

Section 01

Why This Corridor Is Being Built

!

Current Problems

  • ✗Pune–Ahmednagar Road congestion (peak hours 3–4 hrs)
  • ✗Shirur bottlenecks choking Nagar Road daily
  • ✗Slow freight movement between Pune and Marathwada
  • ✗Growing industrial traffic with no dedicated corridor
  • ✗Poor Marathwada connectivity impeding economic growth
  • ✗NH-60 overloaded with mixed urban & inter-city traffic
✓

Expected Benefits

  • ✓3-hour travel target from Pune to Sambhajinagar
  • ✓Better access to Samruddhi Mahamarg expressway network
  • ✓Logistics and freight movement boost for Marathwada
  • ✓Industrial growth corridor along the expressway alignment
  • ✓Reduced urban congestion on Nagar Road
  • ✓Improved connectivity for Ahilyanagar district
Section 02 — Most Important

Pune–Sambhajinagar Corridor: Phase-Wise Breakdown

MSIDC's 3-phase program. Phase 1 (Pune–Shirur Elevated) is underway with Welspun Enterprises as L1 bidder and has a dedicated tracking page. This page tracks Phase 2 and Phase 3.

Phase 1Contract Awarded / Mobilisation

Pune–Shirur Elevated Corridor

Pune → Shirur

Length~53 km
Est. Cost₹7,300 Cr

Elevated corridor removing congestion on the heavily trafficked Nagar Road. Contract awarded to Welspun Enterprises on April 30, 2026. Detailed tracking available on the dedicated Pune–Shirur Expressway page.

Current Stage

Contract Awarded / Mobilisation

View detailed Phase 1 tracking →
Phase 2DPR Stage / Proposed Alignment

Shirur–Ch. Sambhajinagar Greenfield Expressway

Shirur → Chhatrapati Sambhajinagar

LengthLength Under Finalisation
Est. CostSubject to DPR Finalisation

Proposed greenfield expressway completing the main corridor link between Shirur and Chhatrapati Sambhajinagar (Aurangabad). DPR preparation and alignment studies underway by MSIDC. Subject to DPR finalisation.

Current Stage

DPR Stage / Proposed Alignment

Phase 3Concept Stage / Subject to DPR

Pune–Shirur Greenfield Expressway

Pune → Shirur

LengthLength Under Finalisation
Est. CostSubject to DPR Finalisation

A long-term parallel greenfield expressway concept on the Pune–Shirur stretch. Currently at concept stage / planning under evaluation to support future traffic growth.

Current Stage

Concept Stage / Subject to DPR

Section 03

Pune–Sambhajinagar Expressway Route Map & Alignment

Interactive GIS route map showing the Pune Aurangabad Expressway alignment across all three phases. Each phase is rendered in a distinct colour.

Phase 1: Pune–Shirur Elevated Corridor
Phase 2: Shirur–Ch. Sambhajinagar Greenfield Expressway
Phase 3: Pune–Shirur Greenfield Expressway
Loading GIS Map Environment...

Advertisement // Sponsor

Loading sponsor...
Section 04

Pune–Sambhajinagar Expressway: Project Dashboard

MetricValue
Corridor Phases3 Phases
Approximate Length~246 km (Overall Corridor)
Phase 1Pune–Shirur Elevated Corridor (~53 km)
Phase 1 ContractorWelspun Enterprises (Contract Awarded)
Phase 2Shirur–Ch. Sambhajinagar Greenfield (DPR Stage / Proposed Alignment)
Phase 3Pune–Shirur Greenfield (Concept Stage / Parallel)
Districts CoveredPune, Ahilyanagar, Chhatrapati Sambhajinagar
Travel Time Target~3 Hours
Implementing AgencyMSIDC
Corridor StatusPhase 1: Mobilisation | Phase 2 & 3: Planning / Concept
Section 05

Pune–Sambhajinagar Expressway: Development Timeline

2024MSIDC Reveals Corridor Plan

Maharashtra State Infrastructure Development Corporation (MSIDC) reveals the complete 3-phase plan for the Pune–Sambhajinagar expressway corridor.

2025Phase 1 Bids Opened

Financial bids opened for the Pune–Shirur Elevated Corridor. Welspun Enterprises emerges as the L1 bidder.

April 30, 2026Phase 1 Contract Awarded

Welspun Enterprises secured the ₹7,300 crore contract for the Pune–Shirur Elevated Corridor. Pre-construction mobilisation begins.

2027Phase 1 Construction Starts

Targeted commencement of construction activity on the Nagar Road elevated section.

2028+Phase 2 & 3 Evaluation

DPR finalisation and planning studies for Phase 2 (Shirur–Sambhajinagar Greenfield) and Phase 3 (Pune–Shirur Greenfield).

Section 06

Land Acquisition Tracker

Phase-wise land acquisition status for the Pune–Sambhajinagar Corridor.

Phase / SegmentLand Acquisition Status
Phase 1 — Pune–Shirur ElevatedPre-Construction / Survey
Phase 2 — Shirur–Ch. SambhajinagarProposed / Subject to DPR
Phase 3 — Pune–Shirur GreenfieldConcept Stage

* Land acquisition data based on publicly available project announcements. Verify with MSIDC for authoritative data.

Section 07

How It Connects to Maharashtra's Mega Highway Network

Corridor Relationship
PUNEOrigin
↓
Pune–Sambhajinagar CorridorThis Page
↓
CHHATRAPATI SAMBHAJINAGARInterchange
↓
Samruddhi Mahamargvia NH-753
↓
NAGPURTerminus
Key Connectivity Hubs
  • ▪Shendra-Bidkin Industrial Area: Offers direct high-speed integration into the Delhi-Mumbai Industrial Corridor (DMIC) ecosystem, boosting local manufacturing and logistics.
  • ▪Samruddhi Mahamarg Interchange: Integrates with the Hindu Hrudaysamrat Balasaheb Thackeray Maharashtra Samruddhi Mahamarg at Chhatrapati Sambhajinagar to create a seamless high-speed channel from Pune to Nagpur.
  • ▪Ahilyanagar (Ahmednagar) Bypass: Bypasses city bottlenecks to drastically reduce inter-district transit times and enhance regional logistics.
Section 08

Latest Updates by Phase

Verified from news sources & official announcements
General Inquiries

Frequently Asked Questions

The Pune–Chhatrapati Sambhajinagar Greenfield Expressway is a proposed 245.9 km high-speed corridor being developed by the Maharashtra State Infrastructure Development Corporation (MSIDC). It is planned in two phases to improve direct connectivity between Pune and Chhatrapati Sambhajinagar.

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Maharashtra Dashboard →MH
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Never miss a project update.

Join the Infracapitalist Newsletter