Chennai Metro Route Map, Lines, Stations & Phase 2 (2026) (சென்னை மெட்ரோ)

Last Updated: 2026 // Chennai Metro Latest Project Status

The official Chennai Metro route map connects Greater Chennai, its central business districts, industrial parks, and Old Mahabalipuram Road (OMR) IT Corridor in Tamil Nadu. Implemented and operated exclusively by Chennai Metro Rail Limited (CMRL), the 173.0 km network comprises 54.1 km operational rapid transit across 43 stations (Blue Line & Green Line) and 118.9 km Chennai Metro Phase 2under active construction across 128 new stations (Purple Line 3, Yellow Line 4 & Red Line 5) with planned completion by 2028. Both existing corridors are operational.

System Quick Facts & Latest Update
Opened2015 (Phase 1) / 2021 (Phase 1 Ext) / 2026–2028 (Phase 2 Planned Completion)
OperatorChennai Metro Rail Limited (CMRL)
Network TypeRapid Transit Metro — Elevated & Underground
GaugeStandard Gauge (1435 mm)
Electrification25 kV AC Overhead Catenary (OHE)
Maximum Speed80 km/h
Operational Network54.1 km (43 Stations)
Phase 2 Network118.9 km (128 Stations Under Active Construction)
Phase 3 Proposed65.12 km (45 Stations Across 3 Corridors)
Note on Network ScopeMethodology: CMRL official documentation confirms 54.1 km of operational rapid transit (Blue Line: 32.65 km / 26 stations + Green Line: 21.96 km / 17 stations) across 43 stations. Phase 2 encompasses 118.9 km across 128 new stations under active construction with planned completion by 2028.
Operational Network54.1 km
Operational Stations43 Stations
Phase 2 Under Construction118.9 km
Phase 2 New Stations128 Stations
Phase 3 Proposed Extensions65.12 km
Total Master Network Grid238.12 km
Operational CorridorsBlue Line Corridor 1 (32.1 km / 26 stations) & Green Line Corridor 2 (22.0 km / 17 stations) serving 43 stations. Both existing corridors are fully operational.
2 Corridors (54.1 km)
Phase 2 Under Construction128 New stations under active civil & TBM tunneling construction across Purple Line (45.8 km), Yellow Line (26.1 km), and Red Line (47.0 km).
3 Corridors (118.9 km)
Proposed Phase 3 Extensions65.12 km / 45 stations proposed across Airport–Kilambakkam extension (15.46 km), Line 5B Koyambedu–Pattabiram branch (21.76 km), and Parandur Airport extension (27.9 km).
3 Corridors (65.12 km)
Chennai Metro Phase 2 Project Update

Chennai Metro Complete Master Network (Phase 1, Phase 2 & Proposed Phase 3)

Implemented and operated exclusively by Chennai Metro Rail Limited (CMRL), the Chennai Metro network spans 8 distinct corridors across operational lines, Phase 2 active construction, and proposed Phase 3 future routes:

Blue Line (Corridor 1: Wimco Nagar Depot – Chennai Airport)

32.1 km operational North-South corridor featuring 26 stations (19 elevated, 7 underground) connecting Wimco Nagar Depot to Chennai Airport via Anna Salai.

Green Line (Corridor 2: Central – St. Thomas Mount)

22.0 km operational corridor featuring 17 stations (8 elevated, 9 underground) connecting Chennai Central, Egmore, and Koyambedu CMBT to St. Thomas Mount.

Purple Line (Phase 2 Corridor 3: Madhavaram – Siruseri SIPCOT 2)

45.8 km Phase 2 corridor under active construction featuring 50 new stations connecting Madhavaram Milk Colony to OMR IT Expressway & Siruseri SIPCOT.

Yellow Line (Phase 2 Corridor 4: Lighthouse – Poonamallee Bypass)

26.1 km Phase 2 corridor under active construction featuring 30 new stations connecting Lighthouse via T. Nagar & Porur to Poonamallee Bypass.

Red Line (Phase 2 Corridor 5: Madhavaram – Sholinganallur)

47.0 km Phase 2 orbital corridor under active construction featuring 48 new stations connecting Madhavaram via Koyambedu to Sholinganallur.

Blue Line Extension (Phase 3: Airport – Kilambakkam Terminus)

15.46 km proposed extension featuring 12 planned stations extending the Blue Line along GST Road to Kilambakkam Bus Terminus (KCBT).

Line 5B (Corridor 5 Branch: Koyambedu – Avadi – Pattabiram)

21.76 km proposed branch corridor featuring 19 planned stations extending through Avadi to Pattabiram (State DPR Approved).

Parandur Extension (Phase 3: Poonamallee – Sunguvarchatram)

27.9 km proposed extension stretching toward the upcoming Parandur Smart City & Greenfield International Airport.

Geospatial Alignment & Route Map

Chennai Metro Route Map & Network Map

Loading GIS Map Environment...
Chennai Metro New Corridors & Stations

Chennai Metro Lines, Routes & Stations List

The official Chennai Metro station list covers 171 stations across Phase 1 and Phase 2. Both existing corridors are operational. The Chennai Metro route map connects Chennai Airport, Central Railway Station, Egmore, CMBT Bus Terminus, Vadapalani, T. Nagar, Porur, Poonamallee, and OMR IT Corridor (Siruseri SIPCOT).

Chennai Metro Corridors

8 Listed Corridors
Technical & Operational Overview

Chennai Metro Route, Stations & Network Statistics

CMRL Operational Network54.1 km (43 Stations)
Phase 2 Under Construction118.9 km (128 Stations)
Phase 3 Proposed Extensions65.12 km (45 Stations)
Total Master Network Grid238.12 km (216 Stations)
Primary Interchange HubsAlandur & Chennai Central
Sanctioned InvestmentPhase 1 & Ext: ₹14,600 Cr | Phase 2: ₹63,246 Cr
Chennai Metro Extension Latest News

Chennai Metro Timeline

2021

Project Announcement

Expressway plan announced by AP Government to MoRTH.

August 2021

Government Approval

Expressway approved by GoI and included in Bharatmala Pariyojana.

September 2022

NH-544G Designation

NHAI designated route as NH-544G and invited technical bids.

December 2022

Tender Call & Land Acq

NHAI invited civil bids. Land acquisition processes initiated.

January 2023

First Package Awards

First four packages awarded to Dilip Buildcon & Raj Path Infracon.

February 2023

Last Package Awarded

The final construction package awarded to MEIL.

March 2023

Preparatory Works

Preparatory and alignment survey works commenced on site.

March 2024

Foundation Stone

Foundation stone laid by PM Modi. Construction active; target 2026/27.

Intermodal Integration

Connectivity

Airport Rapid Link

Direct rapid transit integration at Chennai International Airport Terminal Station (Blue Line).

Railways & Suburbans

Seamless interchange with Southern Railway at Chennai Central, Chennai Egmore, Guindy, St. Thomas Mount, and Chetpet.

Intercity Bus Terminal

Direct skywalk connection to Koyambedu CMBT (Chennai Mofussil Bus Terminus) on the Green Line.

Multi-Modal Skywalks

Alandur Metro Junction serves as the primary multi-modal interchange between Blue & Green lines.

Strategic Impact

Why Chennai Metro Matters

OMR IT Corridor Transit

Corridor 3 & Corridor 5 Phase 2 lines will eliminate peak hour traffic congestion along Old Mahabalipuram Road (OMR).

Industrial & Tech Access

Provides direct rapid transit to SIPCOT IT Park, Sriperumbudur manufacturing cluster, and Ambattur Industrial Estate.

Multi-Modal Integration

Seamlessly connects Chennai Airport, Central Railway Station, Egmore, and Koyambedu Intercity Bus Terminus.

Real-time Briefings & Construction Update

Chennai Metro Latest News & Construction Update

Stay updated with the Chennai Metro latest news, Chennai Metro Phase 2 latest news, and Chennai Metro construction update across all active tendering and expansion routes.
Answers

Frequently Asked Questions

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Tamil Nadu Dashboard →TN
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
RELATED
Never miss a project update.

Join the Infracapitalist Newsletter