Mumbai Metro and Navi Mumbai Metro form a growing rapid-transit network across the Mumbai Metropolitan Region (MMR), connecting Mumbai, Thane, Navi Mumbai and surrounding urban corridors. This guide covers operational, under-construction, approved and proposed metro lines, including route maps, stations, network expansion and latest project updates.

System Quick Facts
Opened2014 (Mumbai) / 2023 (Navi Mumbai)
OperatorsMMMOCL / MMOPL / MMRC / CIDCO–KRCL
Network TypeRapid Transit & Underground Metro
GaugeStandard Gauge (1435 mm)
Electrification25kV AC OHE / 750V DC
Maximum Speed80 km/h
MMRDA Master-Plan Network337.1 km
Navi Mumbai Metro Line 111.1 km Operational
Note on Network ScopeMethodology: Official MMRDA overview documents reference ~337 km for the core approved network. The 357 km figure incorporates approved future extensions and regional spur corridors across the broader Mumbai Metropolitan Region (MMR).
Mumbai Metro Operational Network100+ km
Navi Mumbai Metro Operational11.1 km
Under Construction146.8 km
Approved Corridors31.4 km
Proposed Extensions98.6 km
Listed Corridors18 Metro Corridors
Operational CorridorsLine 1, 2A, 7, Line 3 Ph 1 & Navi Mumbai L1
5 Corridors
Under ConstructionLine 2B, 3 Ph 2, 4, 4A, 5, 6, 9, 12
8 Corridors
Approved CorridorsLine 7A, 10
2 Corridors
Proposed ExtensionsLine 8, 11, 13, 14
4 Routes
Network Expansion

MMR Metro Expansion Projects

The Mumbai Metropolitan Region Development Authority (MMRDA) and CIDCO are constructing a comprehensive 337.1 km master-plan grid and regional rapid transit network to overhaul public transit across Mumbai, Thane, Navi Mumbai, and Mira-Bhayander:

Line 2B (DN Nagar to Mandale)

A 23.64 km elevated corridor improving East-West suburb linkages and connecting to the Mandale maintenance depot.

Line 3 Phase 2 (BKC to Cuffe Parade)

Completing the core underground transit line through central business districts like Nariman Point, Fort, and Worli.

Line 4 & 4A (Wadala to Gaimukh)

A 35.2 km elevated transit corridor connecting Eastern Mumbai to the dense nodes of Thane along LBS Marg and Ghodbunder Road.

Line 5 (Thane to Kalyan via Bhiwandi)

A 24.90 km elevated corridor bridging Thane city with the logistics hub of Bhiwandi and Kalyan.

Line 6 (JVLR Corridor)

A 15.31 km elevated corridor providing a crucial east-west link along the Jogeshwari–Vikhroli Link Road.

Navi Mumbai Line 1 (CBD Belapur to Pendhar)

An 11.10 km fully operational elevated corridor connecting CBD Belapur, Kharghar, and Pendhar in Taloja.

Geospatial alignment

Mumbai Metropolitan Region (MMR) Metro Network Route Map & Network Map

Loading GIS Map Environment...
Network Corridors

Mumbai Metropolitan Region Metro Lines & Stations

Mumbai / MMR Metro Corridors

17 Listed Corridors

Navi Mumbai Metro

1 Operational Line
Technical & Operational Overview

Mumbai Metro Network Statistics

Mumbai / MMRDA Network17 Listed Corridors
Navi Mumbai Metro1 Operational Line
Total Stations197+ Stations
Interchange Hubs13 Primary
Maintenance Depots9 Active / Planned
MMRDA Master-Plan337.1 km
Development Roadmap

Mumbai Metropolitan Region (MMR) Metro Network Timeline

2004

Master Plan Approval

MMRDA approved the master plan for a 146 km rapid transit grid across Mumbai.

2008

Line 1 Groundbreaking

Civil construction launched on Mumbai's first metro line (Versova–Andheri–Ghatkopar).

2014

Line 1 Opening

Line 1 (Blue Line) inaugurated for public service, bridging Eastern and Western suburbs.

2017

Underground Line 3 Launch

MMRC commenced TBM tunneling for the 33.5 km underground Aqua Line.

2023

Line 2A & 7 Operation

Full commercial operation commissioned for Line 2A (Yellow Line) and Line 7 (Red Line).

2024

Line 3 Phase 1 Opening

First phase of underground Line 3 (Aarey to BKC) inaugurated for commercial service.

2026–2027

Phased Corridor Openings

Targeted phased commissioning for Line 2B, Line 4, Line 5, Line 6, Line 9, and Line 3 Phase 2 (BKC to Cuffe Parade).

Intermodal Integration

Connectivity

Nearby Airports

Direct connectivity to Chhatrapati Shivaji Maharaj International Airport (CSMIA T1 & T2 via Line 3 & Line 7A) and Navi Mumbai Airport (NMIA via Line 8 & NM L1).

Nearby Railway Stations

Integrates with Central Railway lines at Ghatkopar, Kurla & CSMT; Western Railway lines at Andheri, Dadar & Churchgate; Harbour Line at CBD Belapur.

Nearby Expressways

Aligned along Western Express Highway (WEH), Eastern Express Highway (EEH), JVLR, SCLR, and Sion-Panvel Highway.

Nearby Ring Roads

Seamless integration with Mumbai Coastal Road, Atal Setu (MTHL), and the Virar–Alibaug Multimodal Corridor.

Strategic Impact

Why MMR Metro Matters

Suburban Rail Decongestion

Diverts massive commuter volumes from overloaded suburban local trains, providing air-conditioned safety and comfort.

Connecting Financial Hubs

Links major employment centers—BKC, SEEPZ, Nariman Point, Lower Parel, CBD Belapur, and Thane—reducing road travel times by up to 60%.

Environmental Relief

Drastically cuts vehicular emissions, fossil fuel consumption, and traffic congestion across MMR road corridors.

Real-time Briefings

Latest Mumbai Metro News & Updates

Answers

Frequently Asked Questions

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Maharashtra Dashboard →MH
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
Never miss a project update.

Join the Infracapitalist Newsletter