Ganga Elevated Corridor Varanasi: Route Map, Cost, Status & Progress Updates
The Ganga Elevated Corridor Varanasi is a proposed 46.039 km long, 6-lane elevated highway corridor designed to decongest Varanasi city in Uttar Pradesh. The project will connect National Highway-19 (NH-19) to the Varanasi Ring Road (NH-135B) while providing direct riverbank connectivity.
Approved by the Cabinet Committee on Economic Affairs (CCEA) on July 15, 2026, under the Hybrid Annuity Model (HAM), this landmark project has an estimated capital cost of ₹14,447.64 crore (including civil construction cost of ₹6,037.85 crore and land acquisition cost of ₹541.11 crore).
Want Your Brand Featured Here?
Reach thousands of decision-makers and investors searching for infrastructure projects every month.
Ganga Elevated Corridor Varanasi Route Map & Alignment
View and download the latest Ganga Elevated Corridor Varanasi route map showing the project alignment, major junctions, districts covered and connectivity corridors.
Ganga Elevated Corridor Varanasi Technical Specs & Project Parameters
| Parameter | Technical Specification |
|---|---|
| Official Project Name | Varanasi Ganga Elevated Corridor |
| Total Corridor Length | 46.039 km (6-lane elevated main carriageway) |
| Estimated Cost | ₹14,447.64 Crore |
| Implementing Authority | NHAI |
| Corridor Width / RoW | Varies (Standard elevated structure cross-section) |
| Corridor Start Point | NH-19 Interchange, Varanasi |
| Corridor End Point | Varanasi Ring Road (NH-135B) |
| Development Model | Hybrid Annuity Model (HAM) |
| Current Project Status | Approved by CCEA |
| Target Completion | 2031 (Proposed) |
Corridor Alignment & Engineering Features
CCEA Approval & Status
The project was formally approved by the Cabinet Committee on Economic Affairs (CCEA) on July 15, 2026. The corridor is designed to reduce transit times by 67% (from 60 minutes to just 20 minutes) across the project area and is slated to be built under the Hybrid Annuity Model (HAM).
Key Structural Elements
Major structural features include a 910-metre cable-stayed bridge over the Ganga River, a 1.32-km extradosed bridge featuring travelators for pilgrims visiting the historic Kashi Vishwanath Temple, and a Rail Over Bridge spanning both the existing and proposed Malviya Bridge.
NH-19 & Ring Road Connectivity
The corridor provides direct elevated connectivity between NH-19 and the Varanasi Ring Road (NH-135B). This bypasses the congested urban center of Varanasi, routing long-distance commercial freight traffic around the city seamlessly.
Project Cost Breakdown
Of the total ₹14,447.64 crore capital cost, civil construction is estimated at ₹6,037.85 crore (excluding GST but including utility shifting) and land acquisition cost is estimated at ₹541.11 crore.
Latest Developments
Video Updates
Latest Project Updates & Timeline
CCEA Approval
The Cabinet Committee on Economic Affairs (CCEA), chaired by Prime Minister Narendra Modi, approved the 46.039 km elevated corridor project with an estimated budget of ₹14,447.64 crore.
DPR & Land Survey
Pre-construction works, including topographic survey alignment finalisation and joint measurement survey for land acquisition, were initiated by NHAI.
Tendering Stage
Tenders will be invited for construction packages under the Hybrid Annuity Model (HAM).
Ganga Elevated Corridor Varanasi FAQs
It is a proposed 46.039 km long, 6-lane elevated highway corridor designed to decongest Varanasi city and connect NH-19 directly with the Varanasi Ring Road.
The project was approved by the Cabinet Committee on Economic Affairs (CCEA) on July 15, 2026.
The total capital cost of the project is estimated at ₹14,447.64 crore, which includes a civil construction cost of ₹6,037.85 crore and a land acquisition cost of ₹541.11 crore.
The project includes a 910-metre cable-stayed bridge across the Ganga River, a 1.32-km extradosed Foot Over Bridge-cum-Major Bridge with travelators for Kashi Vishwanath Temple pilgrims, and a Rail Over Bridge crossing the Malviya Bridge.
The project will be built under the Hybrid Annuity Model (HAM). Construction is estimated to take approximately 5 years from its commencement.
The Ganga Elevated Corridor Varanasi is a 46.039 km six-lane Greenfield elevated corridor approved by the Union Cabinet in July 2026. It will connect NH-19 with the Varanasi Ring Road (NH-135B), with riverbank connectivity along the Ganga. The project will be implemented by NHAI under the Hybrid Annuity Model (HAM).
The approved Ganga Elevated Corridor route connects NH-19 with the Varanasi Ring Road (NH-135B), following a riverbank-oriented alignment along the Ganga. The corridor is also designed to provide connections toward Ramnagar, BHU and major transport nodes including Kashi Railway Station, Lal Bahadur Shastri International Airport and the Ramnagar IWAI Inland Waterways Terminal.
The official Ministry of Road Transport and Highways announcement includes a map of the approved Ganga Elevated Corridor. The project map shows the 46.039 km connection between NH-19 and Varanasi Ring Road (NH-135B), together with its riverbank connectivity, ramps, loops and associated links.
The approved alignment is planned as a riverbank-oriented corridor along the Ganga between NH-19 and the Varanasi Ring Road. It includes a six-lane elevated main carriageway, an iconic cable-stayed bridge across the Ganga, an extradosed Foot Over Bridge-cum-Major Bridge, ramps, loops, link roads and service roads. The alignment is intended to minimise dependence on congested existing urban roads while connecting major transport and tourism destinations.
The approved Ganga Elevated Corridor has a total project length of 46.039 km. This figure covers the approved corridor project including its associated ramps, loops, link roads and other components; it should not be interpreted as 46.039 km of continuous elevated viaduct alone.
The approved total capital cost of the Ganga Elevated Corridor is ₹14,447.64 crore. This includes a civil construction cost of ₹6,037.85 crore, including utility shifting and excluding GST, and a land acquisition cost of ₹541.11 crore. The project is being developed under the Hybrid Annuity Model (HAM).
The project includes an iconic 910-metre cable-stayed bridge across the Ganga and a 1.32 km extradosed Foot Over Bridge-cum-Major Bridge equipped with travelators. It also includes an ROB, ramps, loops, link roads and service roads as part of the wider corridor system.
The Ganga Elevated Corridor received Union Cabinet approval in July 2026 and was subsequently presented by the Ministry as an approved project. It should therefore be described as an approved project progressing toward implementation rather than as an operational or completed corridor. The available official announcements do not establish that the full 46.039 km corridor is already under active construction.
As of September 2026, the Ganga Elevated Corridor is an approved NHAI project under the Hybrid Annuity Model. The Union Cabinet approved the ₹14,447.64 crore project on 15 July 2026, and the Ministry subsequently described the corridor as an approved six-lane Greenfield project. It is not yet an operational road.
The major latest development is the Union Cabinet's July 2026 approval of the 46.039 km, six-lane Ganga Elevated Corridor at a total capital cost of ₹14,447.64 crore. In August 2026, the Ministry highlighted the project's 910-metre cable-stayed bridge, 1.32 km extradosed bridge and multimodal connectivity to highways, railways, the airport and inland waterways.
Related Infrastructure Projects
Prayagraj Bypass Project
An operational 84.7 km 4-lane access-controlled highway bypass built by NHAI on NH-19 to divert heavy transit traffic around Prayagraj city.
View Project →Ganga Expressway
A major 594 km greenfield access-controlled expressway connecting Meerut and Prayagraj in Uttar Pradesh.
View Project →Gorakhpur Link Expressway
A ₹5,876 crore 91.35 km 4-lane access-controlled expressway connecting Gorakhpur directly to the Purvanchal Expressway.
View Project →Varuna Elevated Road Varanasi
A proposed 43.218 km 6/4-lane elevated corridor designed to decongest Varanasi, connecting NH-31 and the Varanasi Ring Road with access to major transit terminals.
View Project →Enjoy tracking infrastructure projects?
Get monthly updates whenever major Indian infrastructure projects move forward.