CORRIDOR DOSSIER INDEX // PRAYAGRAJ-BYPASS

Prayagraj Bypass (Allahabad Bypass) Route Map, Toll Plaza, NH-19 Status & Latest Updates (2026)

Last Updated: September 2026
StatusFully Operational
Length84.708 km
Open SectionsAll Sections Open
CompletionCompleted (2009)
Last UpdatedSeptember 2026

The Prayagraj Bypass Project (Allahabad Bypass) is an 84.708 km access-controlled highway developed by NHAI under the National Highways Development Project (NHDP). It connects Kokhraj to Handia on NH-19 and has been fully operational since November 2009. The bypass includes the 1.01 km Ganga Bridge near Jagatpur and serves as a vital segment of the Golden Quadrilateral corridor.

By successfully routing long-distance commercial freight transit away from the congested metropolitan center of Prayagraj, it plays a key role in reducing travel time and vehicle operating costs along the Delhi–Kolkata highway segment.

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Total Length84.708 km
Estimated CostApproximately ₹1,100 Crore (US$240 million World Bank-assisted project)
Implementing AgencyNHAI
Current StatusFully Operational
Completion TargetCompleted (2009)
Route Map

Prayagraj Bypass Project Route Map & Alignment

View and download the latest Prayagraj Bypass Project route map showing the project alignment, major junctions, districts covered and connectivity corridors.

Loading GIS Map Environment...
Project Name📍 Prayagraj Bypass Project
Total Length84.708 km
Estimated CostApproximately ₹1,100 Crore (US$240 million World Bank-assisted project)
Current StatusFully Operational
Project Parameters & Technical Details

Prayagraj Bypass Project Technical Specs & Project Parameters

ParameterTechnical Specification
Official Project NamePrayagraj Bypass (Allahabad Bypass) Route Map, Toll Plaza, NH-19 Status & Latest Updates (2026)
Total Corridor Length84.708 km, 4-lane access-controlled toll highway with service roads at selected locations
Estimated CostApproximately ₹1,100 Crore (US$240 million World Bank-assisted project)
Implementing AuthorityNHAI
Corridor Width / RoW70 m ROW (general), 90 m at interchanges, toll plazas and high embankments
Corridor Start PointKokhraj (NH-19), Kaushambi District
Corridor End PointHandia (NH-19), Prayagraj District
Development ModelNHAI / NHDP (Golden Quadrilateral), World Bank-assisted EPC construction
Current Project StatusFully Operational
Target CompletionCompleted (2009)

Corridor Alignment & Engineering Features

Toll Plaza Information

The Prayagraj Bypass is operated as a toll road managed by the National Highways Authority of India (NHAI). Mainline toll plaza operations are situated to manage regional traffic flow, utilizing modern electronic toll collection systems like FASTag for automated toll processing.

Ganga Bridge Engineering

The engineering highlight of the bypass is the mega bridge built across the Ganga River near Jagatpur. Spanning approximately 1.01 kilometers, the bridge structures rely on a balanced cantilever design constructed to bypass urban density while minimizing environmental disruption inside the riverbed.

Golden Quadrilateral Connectivity

As a critical bypass corridor, the highway links directly into the national Golden Quadrilateral highway system, which forms the primary road transport network connecting Delhi, Kolkata, Mumbai, and Chennai.

NH-19 Connectivity

The bypass handles commercial logistics along the National Highway 19 (NH-19) corridor (formerly NH-2), allowing heavy commercial vehicle traffic to route around Prayagraj city seamlessly.

Key Alignment Interchanges & Nodes Covered:
📍 Kokhraj📍 Ganga Bridge (Jagatpur)📍 Soraon📍 Handia
Timeline

Latest Developments

Verified project updates from news sources and official announcements
Video Coverage

Video Updates

Latest drone footage, progress reports, and ground coverage
Project Schedule

Latest Project Updates & Timeline

1998–2001

Project Planning

Project planning and feasibility studies initiated under the National Highways Development Project (NHDP) by NHAI.

2001

World Bank Approval

World Bank approved approximately US$240 million loan assistance to finance the construction of the Allahabad Bypass project.

2002–2008

Civil Construction

Construction executed across three packages: ABP-I (L&T), ABP-II (HCC for Ganga Bridge), and ABP-III (Som Datt & OSE JV).

November 2009

Fully Operational

The entire 84.708 km access-controlled bypass route opened to commercial toll traffic, bypassing Prayagraj city.

General Inquiries

Prayagraj Bypass Project FAQs

Related Infrastructure Projects

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

✓Project milestones
✓Government approvals
✓Construction progress
✓New project launches
🏛️Visit Uttar Pradesh Dashboard →UP
🗺️Explore All State Dashboards →ALL
📰Read Latest Infrastructure News →LATEST
RELATED
Never miss a project update.

Join the Infracapitalist Newsletter