METRO CORRIDOR DOSSIER // KOLKATA-METRO-ORANGE-LINE-OPERATIONAL

Kolkata Metro Line 6 (Orange Line — Operational Route: Kavi Subhash ↔ Beleghata)

Operational📏 9.90 km Operational Route (Kavi Subhash to Beleghata)🚉 9 Operational Stations (8 Elevated, 1 At-Grade) Stations🗓 06 Mar 2024🏢 Metro Railway, Kolkata (Owner: Indian Railways / RVNL)

Kolkata Metro Line 6 (Orange Line - Operational Segment) spans 9.90 km across 9 operational stations (8 elevated, 1 at-grade) running parallel to Eastern Metropolitan (EM) Bypass from Kavi Subhash (New Garia) to Beleghata. The corridor forms the primary arterial mass transit spine for South-Eastern Kolkata, providing direct rail interchange with Line 1 Blue Line and Eastern Railway suburban trains at New Garia.

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Kolkata Metro Orange Line Economics

Kolkata Metro Orange Line Economics

Total InvestmentCommissioned Phase Expense ~₹4,259 Cr (Full Line Sanctioned ₹3,951.98 Cr)
Primary BackersMinistry of Railways (Government of India)
Operator / ModelMetro Railway, Kolkata (Owner: Indian Railways / RVNL)
Target Opening

Expected Completion Date

StatusOperational
Target Opening Date06 Mar 2024 (Kavi Subhash – Ruby / Hemanta Mukhopadhyay) | 22 Aug 2025 (Hemanta Mukhopadhyay – Beleghata)
Station list

Kolkata Metro Orange Line Stations

#StationTypeInterchange / ConnectionOpened
01
Kavi Subhash (New Garia)
At-Grade Terminal HubLine 1 Blue Line & Sealdah South Railway Interchange06 March 2024
02
Satyajit Ray (Metropolis)
ElevatedHiland Park & EM Bypass Node06 March 2024
03
Jyotirindra Nandi (Mukundapur)
ElevatedMukundapur Healthcare & Hospital Belt06 March 2024
04
Kavi Sukanta (Kalikapur)
ElevatedKalikapur Junction Node06 March 2024
05
Hemanta Mukhopadhyay (Ruby More)
Elevated HubRuby General Hospital & Anandapur Commercial Axis06 March 2024
06
VIP Bazar
ElevatedVIP Bazar Precinct Node22 August 2025
07
Ritwik Ghatak (Bantala Road)
ElevatedBantala Science City Link Node22 August 2025
08
Barun Sengupta (ITC Sonar)
ElevatedITC Sonar & JW Marriott Hotel Axis22 August 2025
09
Beleghata
Elevated Terminal HubBeleghata Suburb & Metropolitan Canal Axis22 August 2025
Geospatial Alignment

Kavi Subhash ↔ Beleghata Geospatial Alignment Map

Loading GIS Map Environment...
Specs sheet

Kolkata Metro Orange Line Technical Specifications

ParameterValue
Corridor StatusOperational
Line NumberLine 6 (Orange Line)
Total Length9.90 km Operational Route (Kavi Subhash to Beleghata)
Stations Count9 Operational Stations (8 Elevated, 1 At-Grade)
Corridor TypeElevated Viaduct & At-Grade Terminal Hub along EM Bypass
OperatorMetro Railway, Kolkata (Owner: Indian Railways / RVNL)
Opened / Est. Opening06 Mar 2024 (Kavi Subhash – Ruby / Hemanta Mukhopadhyay) | 22 Aug 2025 (Hemanta Mukhopadhyay – Beleghata)
Maximum Design Speed80 km/h
Track GaugeBroad Gauge (1,676 mm / 5 ft 6 in)
Electrification System750V DC Third Rail
Primary DepotNew Garia Metro Depot
Chronological Milestones

Kolkata Metro Orange Line Timeline

2010-11

New Garia to Biman Bandar Line 6 corridor sanctioned by Railway Minister Mamata Banerjee.

February 2017

RVNL demarcated terminal station plot and commenced construction at New Garia.

06 March 2024

Phase 1 (Kavi Subhash to Hemanta Mukhopadhyay / Ruby, 5.40 km, 5 stations) inaugurated by Prime Minister Narendra Modi.

14 March 2024

RVNL erected 76-meter open-web steel girder bridge over Tagore Park culvert to bridge viaduct gap.

22 August 2025

Phase 2 extension (Hemanta Mukhopadhyay to Beleghata, 4.50 km, 4 stations) commissioned.

25 August 2025

Commercial revenue service launched between Kavi Subhash and Beleghata with 60 daily service pairs.

Proprietary analytics

Orange Line EM Bypass Transit & Regional Economic Impact

Economic Significance

Connects major healthcare, hospitality, and residential hubs along the EM Bypass arterial corridor.

Traffic Impact

De-congests heavy vehicular traffic on EM Bypass, cutting travel time from Garia to Beleghata from 50 mins to 16 mins.

Employment Centres Served

Serves major employment hubs including Ruby commercial area, ITC Sonar/JW Marriott hotel district, and Mukundapur medical precinct.

Intermodal Connectivity

Provides seamless dual-mode interchange at Kavi Subhash with Line 1 Blue Line and Sealdah South Suburban Rail.

Impact on Real Estate

Triggered significant real estate appreciate and premium commercial developments along EM Bypass.

Geospatial Explorer

Kolkata Metro Orange Line Alignment Map & GIS Explorer

Corridor Type Breakdown9.90 km (8.40 km Elevated Viaduct / 1.50 km At-Grade)
Viaduct Length8.40 km Viaduct (8 Elevated Stations)
Tunnel LengthN/A (Underground section to Airport is under construction)
River Crossings76m Open-Web Steel Girder Bridge over Tagore Park Culvert
Major Bridges / CrossingsEM Bypass Flyover Parallel Structures
Primary DepotNew Garia Metro Depot
Answers

Frequently Asked Questions

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

Project milestones
Government approvals
Construction progress
New project launches
Found incorrect data?
Never miss a project update.

Join the Infracapitalist Newsletter