METRO CORRIDOR DOSSIER // KOLKATA-METRO-ORANGE-LINE-UNDER-CONSTRUCTION

Kolkata Metro Line 6 (Orange Line — Under Construction Section: Beleghata ↔ Jai Hind Airport)

Under Construction📏 19.97 km Under Construction Route🚉 15 Planned Stations (14 Elevated, 1 Underground Terminal) Stations🗓 Target Opening: 2026 – 2027🏢 Metro Railway, Kolkata (Owner: Indian Railways / RVNL)

Kolkata Metro Line 6 (Orange Line - Under Construction Segment) spans 19.97 km across 15 planned stations (14 elevated, 1 underground at NSCBI Airport). Extending from the operational Beleghata station through Salt Lake Sector V and the Rajarhat New Town satellite township to Jai Hind Airport, this corridor will link Kolkata's premier IT hub, commercial business districts, and international airport terminal.

FEATURED PARTNER
ADVERTISEMENT

Want Your Brand Featured Here?

Reach thousands of decision-makers and investors searching for infrastructure projects every month.

YOUR BRAND HEREPrime Infrastructure Placement
Kolkata Metro Orange Line Economics

Kolkata Metro Orange Line Economics

Total InvestmentUnder Construction Section Sanctioned Expense ~₹3,500+ Cr (Part of ₹3,951.98 Cr Sanction)
Primary BackersMinistry of Railways (Government of India)
Operator / ModelMetro Railway, Kolkata (Owner: Indian Railways / RVNL)
Target Opening

Expected Completion Date

StatusUnder Construction
Target Opening DateTarget Opening: 2026 – 2027 (Phased Sector V & New Town Openings)
Station list

Kolkata Metro Orange Line Stations

#StationTypeInterchange / ConnectionOpened
01
Beleghata
Elevated Operational HubOperational Line 6 Terminal & Metropolitan Canal Axis22 August 2025
02
Gour Kishore Ghosh (Chingrighata)
Elevated (Under Construction)EM Bypass & Salt Lake Connector NodeTarget 2026
03
Nalban (Nicco Park)
Elevated (Under Construction)Nicco Park & Salt Lake Sector IV AxisTarget 2026
04
IT Centre (Salt Lake Sector-V)
Elevated Hub (Under Construction)Line 2 Green Line Interchange & IT SEZ CoreTarget 2026
05
Nabadiganta (Technopolis)
Elevated (Under Construction)Technopolis IT Park & Sector V NorthTarget 2026
06
Nazrul Tirtha
Elevated (Under Construction)New Town Entry & Cultural AxisTarget 2026
07
Swapnabhor
Elevated (Under Construction)New Town Action Area 1 Senior Living NodeTarget 2026
08
Biswa Bangla Convention Centre
Elevated (Under Construction)MICE, Financial Hub & Hotel ZoneTarget 2026
09
Shiksha Tirtha
Elevated (Under Construction)New Town Educational Hub NodeTarget 2026
10
Mother's Wax Museum
Elevated (Under Construction)Tourist & Cultural Museum AxisTarget 2026
11
Eco Park
Elevated (Under Construction)Eco Park Lake & Major Recreational ZoneTarget 2026
12
Mangaldeep
Elevated (Under Construction)New Town Action Area 2 PrecinctTarget 2026
13
City Centre-2
Elevated (Under Construction)Rajarhat Retail & Shopping AxisTarget 2026
14
Chinar Park
Elevated (Under Construction)VIP Road Intersection & Residential AxisTarget 2026
15
VIP Road (Haldiram)
Elevated (Under Construction)Line 2 Green Line Extension InterchangeTarget 2026
16
Jai Hind (NSCBI Airport)
Underground Terminal Hub (Under Construction)Line 4 Yellow Line & NSCBI Airport TerminalTarget 2027
Geospatial Alignment

Beleghata ↔ Jai Hind Airport Alignment Map & Construction Tracker

Loading GIS Map Environment...
Specs sheet

Kolkata Metro Orange Line Technical Specifications

ParameterValue
Corridor StatusUnder Construction
Line NumberLine 6 (Orange Line)
Total Length19.97 km Under Construction Route
Stations Count15 Planned Stations (14 Elevated, 1 Underground Terminal)
Corridor TypeElevated Viaduct across New Town & Subterranean Airport Station
OperatorMetro Railway, Kolkata (Owner: Indian Railways / RVNL)
Opened / Est. OpeningTarget Opening: 2026 – 2027 (Phased Sector V & New Town Openings)
Maximum Design Speed80 km/h
Track GaugeBroad Gauge (1,676 mm / 5 ft 6 in)
Electrification System750V DC Third Rail
Primary DepotNew Garia Metro Depot & Airport Subterranean Stabling Yard
Chronological Milestones

Kolkata Metro Orange Line Timeline

2010-11

New Garia to Biman Bandar Line 6 corridor sanctioned by Railway Minister Mamata Banerjee.

January 2021

West Bengal Transport Department & HIDCO officially renamed 9 New Town metro stations to prominent landmarks.

2023

Construction commenced on India's largest subterranean airport stabling yard (550m long, 41.6m wide) at Jai Hind Station.

25 August 2025

Kavi Subhash to Beleghata operational section commissioned; active civil viaduct works accelerated toward Sector V and New Town.

Target 2026-27

Targeted phased opening of Beleghata to Sector V IT hub and full commissioning to Jai Hind Airport.

Proprietary analytics

Orange Line IT SEZ, New Town & Airport Transit Impact

Economic Significance

Connects Salt Lake Sector V IT SEZ, Rajarhat New Town financial hub, and NSCBI Airport directly to South Kolkata.

Traffic Impact

Expected to slash travel time between Garia, Salt Lake IT hub, and Kolkata Airport from 90 mins by road to 32 mins by metro.

Employment Centres Served

Serves over 300,000 IT professionals, corporate employees, hospitality staff, and airport workers along the New Town corridor.

Intermodal Connectivity

Provides triple key interchanges: Green Line at Sector V & VIP Road, and Yellow Line at Jai Hind Airport.

Impact on Real Estate

Catalyzing massive commercial, IT park, luxury high-rise residential, and MICE hotel developments across New Town.

Geospatial Explorer

Kolkata Metro Orange Line Alignment Map & GIS Explorer

Corridor Type Breakdown19.97 km (18.10 km Elevated Viaduct / 1.87 km Underground Airport Subterranean Terminal)
Viaduct Length18.10 km Elevated Viaduct (14 Elevated Stations)
Tunnel Length1.87 km Subterranean Airport Terminal & Stabling Yard
River CrossingsKestopur Canal Viaduct Crossing & Major New Town Expressway Overpasses
Major Bridges / CrossingsMajor Elevated Viaduct Spans over MAR (Major Arterial Road) New Town
Primary DepotNew Garia Depot & Airport Subterranean Stabling Facility
Answers

Frequently Asked Questions

Enjoy tracking infrastructure projects?

Get monthly updates whenever major Indian infrastructure projects move forward.

Project milestones
Government approvals
Construction progress
New project launches
Found incorrect data?
Never miss a project update.

Join the Infracapitalist Newsletter