Lucknow Metro Route Map, Stations, Timings & Fare (लखनऊ मेट्रो)
Last Updated: 2026 • Official UPMRC & MoHUA Project Data
Get the complete Lucknow Metro route map, Lucknow Metro stations list, Lucknow Metro timings, and Lucknow Metro fare details across the network. Lucknow Metro Phase 1 currently operates a 22.878 km North-South Corridor from CCS Airport to Munshipulia with 21 stations. The approved Lucknow Metro Phase 1B East-West Corridor will add 11.165 km and 12 stations between Charbagh and Vasant Kunj.
Lucknow Metro Expansion & Future Network Plans
Lucknow Metro currently operates a 22.878 km North-South Corridor from CCS Airport to Munshipulia with 21 stations. The approved Phase 1B East-West Corridor will add 11.165 km and 12 stations between Charbagh and Vasant Kunj. Detailed design consultancy has been awarded, and UPMRC has invited a ₹1,877.89 crore civil construction tender for the underground Charbagh–Chowk section with seven underground stations.
Union Cabinet-Approved Phase 1B (Charbagh to Vasant Kunj)
The 11.165 km East-West Corridor (6.88 km underground with 7 stations, 4.285 km elevated with 5 stations) connects Charbagh through Aminabad, Pandeyganj, Medical Chauraha and Chowk to Vasant Kunj at an approved outlay of ₹5,801 crore. Detailed design consultancy has been awarded, and UPMRC has invited a ₹1,877.89 crore civil construction tender for the underground Charbagh–Chowk section with seven underground stations.
Lucknow Metro Phase 2 & Future Expansion
Several future metro corridors have been proposed under long-term mobility planning for Lucknow. These proposals are subject to government consideration and approval and should not be treated as sanctioned or under-construction metro lines.
Transport Nagar Depot & Vasant Kunj Maintenance Depot
The operational 24.4-hectare Transport Nagar Depot on Kanpur Road houses maintenance, test tracks, and 20 Alstom Metropolis trainsets for the Red Line. A dedicated 20-hectare maintenance depot at Vasant Kunj is approved as part of Phase 1B.
Lucknow Metro Network Route Map & Network Map
Lucknow Metro Lines, Corridors & Stations
Operational Corridor — 21 Stations (22.878 km)
Operational — 21 Stations| Line | Status | Length | Stations | Details |
|---|---|---|---|---|
Lucknow Metro Red Line (CCS Airport - Munshipulia) CCS Airport ↔ Munshipulia | Operational | 22.878 km | 21 Stations | View Corridor Details→ |
Approved Phase 1B (12 Stations) & Proposed Phase 2 Corridors
Approved Phase 1B — 12 Stations| Line | Status | Length | Stations | Details |
|---|---|---|---|---|
Lucknow Metro Blue Line (Charbagh - Vasant Kunj) Charbagh Railway Station ↔ Vasant Kunj | Approved – Upcoming | 11.165 km | 12 Stations | View Corridor Details→ |
Lucknow Metro Phase 2 & Future Expansion Corridors Lucknow Urban Region ↔ Proposed Extension Corridors | Proposed / Under Planning | Under Planning | TBD Stations | View Corridor Details→ |
Lucknow Metro Network Statistics
Lucknow Metro Network Timeline
Phase 1 Project Approval
Lucknow Metro DPR approved in 2013; Government of India granted in-principle approval for Phase 1A in December 2013.
Priority Section Construction Begins
Civil construction commenced on the 8.5 km priority section from Transport Nagar to Charbagh.
Priority Corridor Opens
Commercial operations commenced on the Transport Nagar–Charbagh priority corridor in September 2017.
Full Phase 1A Operational
The complete 22.878 km North-South Corridor (21 stations from CCS Airport to Munshipulia) became fully operational.
Union Cabinet Approves Phase 1B
Union Cabinet approved the 11.165 km East-West Corridor (Charbagh to Vasant Kunj with 12 stations) at ₹5,801 crore.
Phase 1B Civil Contracts & Tendering
2026 — DDC contract awarded to AYESA; elevated Thakurganj–Vasant Kunj construction contract awarded to Ranjit Buildcon; ₹1,877.89 crore underground Charbagh–Chowk package tendered.
Connectivity
Chaudhary Charan Singh International Airport
CCS Airport Metro Station provides metro connectivity to Chaudhary Charan Singh International Airport.
Major Indian Railway Terminals
Direct intermodal connectivity to Lucknow Charbagh Railway Station (NR & NER), Badshah Nagar Railway Station. Phase 1B includes City Railway Station as one of its planned stations.
Interstate Bus Terminals (ISBT)
Alambagh Bus Station Metro Stop provides connectivity to the Alambagh Inter-State Bus Terminal (ISBT).
Expressways & Arterials
Direct arterial integration with Amar Shaheed Path, Lucknow Outer Ring Road (Kisan Path / NH-230), Agra-Lucknow Expressway feeder, and Purvanchal Expressway.
Why Lucknow Metro Matters
Old City & Commercial Decongestion
The approved Phase 1B is designed to improve connectivity through dense and historically congested areas of central Lucknow, including Aminabad, Pandeyganj and Chowk.
Healthcare & Academic Hub Integration
Phase 1 and approved Phase 1B improve access to major healthcare, commercial, educational and transport hubs across Lucknow.
Green Transit & Clean Mobility
Alstom Metropolis trainsets feature regenerative braking that can recover energy during braking.
Latest Lucknow Metro News & Updates
Frequently Asked Questions